Electric cooperativeNOVEC interconnection application
NOVEC is an electric cooperative serving 169,027 residential customers in Virginia (EIA-861, 2025). Applications: PDF + email (Email to NOVEC net metering / system metering department). Gridpol files NOVEC interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. NOVEC publishes only an email contact; no online form, fee schedule or checklist found. Verify on first project: NMIN submission channel, NEM-10 rider terms, inspection fee, storage rules, meter installation timeline.
NOVEC at a glance
Northern Virginia Elec Coop
TypeElectric cooperative
EIA utility ID13640
Residential customers169,027 (EIA-861, 2025)
Net-metered residential customers3,981 (EIA-861, 2025)
Service territory7 counties in Virginia
How to applyPDF + email – Email to NOVEC net metering / system metering department · official link
Who submitsCustomer or the selected solar installer contacts NOVEC's system metering department (NOVEC 'Ready to go solar?').
Export compensationNEM – NOVEC Schedule NEM-10 (net metering)
Net meter records delivered and exported energy; excess offsets future bills (NOVEC Net Metering page). Rider text not reviewed.
VA rule 20VAC5-315-30: residential - utility has 30 days from notification to determine compliance; customer may interconnect on day 31 unless utility requests a waiver; non-residential 60/61 days. Notification date = 3rd day after mailing.
Documents NOVEC asks for
- Interconnection application formSCC Form NMIN: Sections 1-4 must be submitted to and approved by the cooperative before any construction/installation Gridpol prepares this.
- Customer signatureMember/customer signs NMIN
- Proof of insuranceLiability insurance >= $100,000 for <=10 kW AC; >= $300,000 for >10 kW AC (20VAC5-315-60)
- UL 1741 / IEEE 1547 certificationVendor certifies on the NMIN form that the generator complies with UL/IEEE 1547 (20VAC5-315-40 A 4)
- Final inspection sign-offLicensed electrician certifies on the SCC notification form (NMIN) that installation meets NEC/manufacturer specs, or signed final electrical inspection if installed by customer or Class A/B contractor (20VAC5-315-40 A 3)
- Net metering / net billing agreementSeparate agreement for service under the net metering rider is required
How the NOVEC process runs
- Select installer.
- Customer or installer emails netmetering@novec.com / contacts system metering department to start; submit SCC Form NMIN Sections 1-4 before installation (VA rule).
- Install; electrician certification or final inspection on NMIN.
- NOVEC installs net meter; operation begins.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Residential | 20 kW | 20 kW AC (VA cooperative limit) |
| Non-residential | 1000 kW | 1 MW AC |
| Net metering cap | 20 kW |
VA cooperative limits 20 kW AC residential / 1 MW non-residential (20VAC5-315-20); NOVEC tariff NEM-10 caps with published remaining capacity.
Sources
- NOVEC - Net Metering: https://www.novec.com/Environment/Net-Metering.cfm (retrieved 2026-11-13)
- NOVEC - Ready to go solar?: https://www.novec.com/About_NOVEC/goingsolar.cfm (retrieved 2026-11-13)
- NOVEC - Net Energy Metering Existing and Remaining Capacity: https://www.novec.com/Environment/Net-Energy-Metering-Caps-and-Remaining-Capacity.cfm (retrieved 2026-11-13)
- 20VAC5-315-30 Company notification (VA SCC net metering rules): https://law.lis.virginia.gov/admincode/title20/agency5/chapter315/section30/ (retrieved 2026-11-13)
- 20VAC5-315-40 Conditions of interconnection: https://law.lis.virginia.gov/admincode/title20/agency5/chapter315/section40/ (retrieved 2026-11-13)
- 20VAC5-315-60 Liability insurance: https://law.lis.virginia.gov/admincode/title20/agency5/chapter315/section60/ (retrieved 2026-11-13)
- 20VAC5-315-20 Definitions (size limits): https://law.lis.virginia.gov/admincode/title20/agency5/chapter315/section20/ (retrieved 2026-11-13)
Virginia interconnection rule
Virginia State Corporation Commission
Interconnection rule20VAC5-315 (Regulations Governing Net Energy Metering, incl. interconnection of net metering facilities); 20VAC5-314 (Interconnection of Small Electrical Generators and Storage, for non-net-metered) – Regulations Governing Net Energy Metering · source
Applies toElectric distribution companies: investor-owned (Dominion, Appalachian Power) and electric cooperatives; 20VAC5-314 does not apply to net metering customers (they follow 20VAC5-315)
Application formCommission-approved net metering notification form (or identical utility electronic system) signed by customer, licensed electrician and vendor (20VAC5-315-30/40); non-NEM: Level 1 Interconnection Request Form (Schedule 5) <=500 kW
TimelinesNet metering: residential customer must notify before construction and get approval before interconnecting; utility has 30 days (nonresidential 60 days) from notification (third day after mailing) to determine compliance (20VAC5-315-30).
FeesNet metering: no application fee in rule; up to $50 per generator for inverter-settings inspection (>10 kW) or protective settings inspection; standby charges only for Phase II utility residential >15 kW (20VAC5-315-40/50).
InsuranceNet metering: <=10 kW at least $100,000 liability (homeowners/commercial); >10 kW at least $300,000; no higher limits or additional policies may be required (20VAC5-315-60). Non-NEM (314-160): $100k <=10 kW, $300k <=500 kW, $2M >500 kW.
External disconnectLockable, utility-accessible, load-breaking manual disconnect switch only if required by the utility's tariff; electrician certifies installation on the notification form (20VAC5-315-40 A 2-3).
Export compensationNEM – Va. Code 56-594, 56-594.01, 56-594.2; 20VAC5-315
Monthly netting at retail rate under same tariff as non-NEM customers; 12-month net metering period. Recent SCC proceedings revising Dominion/APCo net metering not verified here.
Electric cooperatives are covered (20 kW residential / 1 MW nonresidential). Municipal utilities are not SCC-regulated and set their own policies.
- 20VAC5-315 Regulations Governing Net Energy Metering (full text): https://law.lis.virginia.gov/admincodefull/title20/agency5/chapter315 (retrieved 2026-11-13)
- 20VAC5-314 Interconnection of Small Electrical Generators and Storage (full text): https://law.lis.virginia.gov/admincodefull/title20/agency5/chapter314 (retrieved 2026-11-13)
Other utilities in Virginia
- Dominion Energy Virginia / Dominion Energy North Carolina2,408,901
- Appalachian Power (APCo)467,581
- Rappahannock Electric Cooperative (REC)172,883
- Shenandoah Valley Electric Cooperative86,656
- Southside Electric Cooperative, Inc.57,305
- City of Danville38,226
- Central Virginia Electric Cooperative35,353
- A & N Electric Cooperative33,035
- Mecklenburg Electric Cooperative30,077
- KU22,759
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.