Home › Utilities › Michigan › UPPCO

Investor-owned utility

UPPCO interconnection application

UPPCO is an investor-owned utility serving 47,805 residential customers in Michigan (EIA-861, 2025). Applications: PDF + email (UPPCO Customer Generation). Gridpol files UPPCO interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from UPPCO’s official sources (see below). Fees and timelines in procedures PDF not extracted; verify.

UPPCO at a glance

Utility

Upper Peninsula Power Company

Type

Investor-owned utility

EIA utility ID

19578

Residential customers

47,805 (EIA-861, 2025)

Net-metered residential customers

285 (EIA-861, 2025)

Service territory

11 counties in Michigan

How to apply

PDF + email – UPPCO Customer Generation · official link

Who submits

Customer/installer submits Michigan Interconnection Application to UPPCO (customergeneration@uppco.com per forms).

Export compensation

Net billing – Distributed Generation Rider (DG)
Rider dated Apr 29, 2025.

Documents UPPCO asks for

  • Interconnection application formMichigan Interconnection Application Form Gridpol prepares this.
  • Interconnection agreementStandard Level 1-3 Interconnection Agreement
  • Other utility-specific documentCommissioning test and inspection

How the UPPCO process runs

  1. Submit application; wait for approval.
  2. Install.
  3. Commissioning test and inspection.
  4. Sign Interconnection Agreement.
  5. UPPCO swaps meter; enrolled in DG program.

Size levels and limits

LevelUp toNote
Level 120 kW
Level 2150 kW
Level 3550 kW
Level 41000 kW
Level 5>1 MW
Net metering cap550 kW

DG up to 110% of 12-month usage, max 550 kW.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited