Home › Utilities › Michigan › Great Lakes Energy
Electric cooperativeGreat Lakes Energy interconnection application
Great Lakes Energy is an electric cooperative serving 123,277 residential customers in Michigan (EIA-861, 2025). Applications: PDF + email (GLE Renewables). Gridpol files Great Lakes Energy interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Great Lakes Energy’s official sources (see below). Credit rate value not confirmed in tariff text extracted.
Great Lakes Energy at a glance
Great Lakes Energy Coop
TypeElectric cooperative
EIA utility ID38084
Residential customers123,277 (EIA-861, 2025)
Net-metered residential customers546 (EIA-861, 2025)
Service territory26 counties in Michigan
How to applyPDF + email – GLE Renewables · official link
Who submitsMember with contractor; both sign application. Send to GLE Renewables, 1323 Boyne Ave, Boyne City MI 49712 (hotline 231-485-2537).
Export compensationNet billing – Distributed Renewable Energy Program (DRE)
From Dec 1, 2025; excess credited (reported 5.6 cents/kWh); 10-year term; limited to G&T 10 MW offer.
Construction/commercial operation within 180 days of signing agreement.
Wholesale supplier / associationWolverine Power Cooperative
Documents Great Lakes Energy asks for
- Interconnection application formGenerator Interconnection Application <=20 kW (separate 20-150 kW form) Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- Single-line diagram (one-line)Electrical one-line drawing Gridpol prepares this.
- Customer signatureMember and contractor signatures
- Interconnection agreementDistributed Renewable Energy and Interconnection Agreement (member, coop, G&T)
How the Great Lakes Energy process runs
- Submit application with site plan, one-line and $100 fee.
- Approval; coop issues DRE and Interconnection Agreement.
- Sign agreement before interconnection.
- Complete within 180 days; IEEE 1547/UL 1741 equipment.
Fees
| Fee | Applies to | Note |
|---|---|---|
| $100 | Interconnection application (<=20 kW) |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| <=20 kW | 20 kW | |
| 20-150 kW | 150 kW | |
| 150-750 kW | 750 kW | |
| Net metering cap | 20 kW |
DRE program 20 kW or less, solar/wind.
Sources
- GLE Generator Interconnection Application <=20 kW: https://www.gtlakes.com/wp-content/uploads/2026/01/2-0-20kW-GEN-INTERCON-APP.pdf (retrieved 2026-11-13)
- GLE DRE Tariff (Dec 1, 2025): https://www.gtlakes.com/wp-content/uploads/2026/03/DRE-Tariff-begins-12-1-25.pdf (retrieved 2026-11-13)
Other utilities in Michigan
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.