Home › Utilities › Michigan › UMERC (We Energies)

Investor-owned utility

UMERC (We Energies) interconnection application

UMERC (We Energies) is an investor-owned utility serving 33,339 residential customers in Michigan (EIA-861, 2025). Applications: PDF + email (UMERC-We Energies Central Group). Gridpol files UMERC (We Energies) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from UMERC (We Energies)’s official sources (see below). Application fees for Level 1-3 not shown; check procedures PDF.

UMERC (We Energies) at a glance

Utility

Upper Michigan Energy Resources Corp. (WEC Energy Group)

Type

Investor-owned utility

EIA utility ID

60631

Residential customers

33,339 (EIA-861, 2025)

Net-metered residential customers

91 (EIA-861, 2025)

Service territory

10 counties in Michigan

How to apply

PDF + email – UMERC-We Energies Central Group · official link

Who submits

Customer and installer jointly responsible; submit Michigan Interconnection Application by email, mail (PO Box 2046, Milwaukee WI 53201) or fax. Contact UMERC-WE-CustomerGen@we-energies.com, 414-221-2377.

Export compensation

Net billing – PG-1AM / Michigan DG
Verify current Michigan DG tariff.

Review time (official)

Completeness and impact-study determination within 10 business days of new/revised application.

Documents UMERC (We Energies) asks for

  • Interconnection application formMichigan Interconnection Application form Gridpol prepares this.
  • Other utility-specific documentSupplemental form by generation type
  • Interconnection agreementUtility agreement signed by the customer, usually after review.
  • Proof of insurance (when applicable)Liability insurance per Rule 460.986 for Level 3-5

How the UMERC (We Energies) process runs

  1. Submit application + supplemental form.
  2. Completeness review (10 business days); agreement if no study.
  3. Impact/facilities studies if required.
  4. Install within agreed timeframe; notify completion.
  5. System testing, meter, operation.

Fees

FeeApplies toNote
$300Pre-application report (required Level 4-5, optional otherwise)

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote

Michigan MIXDG levels (procedures approved U-21479).

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited