Home › Utilities › Illinois

Illinois

Illinois interconnection applications

72 electric utilities serve Illinois (EIA-861, 2025): 4 investor-owned utilitys, 41 municipal utilitys, 26 electric cooperatives, 1 state power authority. Together they serve 5,262,538 residential customers; 119,442 residential customers were on net metering at year-end 2025.

Largest utilities in Illinois

ComEdProcess verified

Investor-owned utility · 3,753,924 residential customers · Illinois

Applications: Own online portal – ComEd interconnection portal

Interconnection process and documents →
Ameren IllinoisProcess verified

Investor-owned utility · 1,062,810 residential customers · Illinois

Applications: PowerClerk – Ameren Illinois Interconnect (PowerClerk)

Interconnection process and documents →
MidAmerican EnergyProcess verified

Investor-owned utility · 717,275 residential customers · Illinois

Applications: PDF + mail – State standard interconnection forms (IA/IL/SD)

Interconnection process and documents →
City of SpringfieldState guidance

Municipal utility · 59,366 residential customers · Illinois

Interconnection process and documents →
City of NapervilleState guidance

Municipal utility · 57,225 residential customers · Illinois

Interconnection process and documents →
Corn Belt Energy CorporationState guidance

Electric cooperative · 34,952 residential customers · Illinois

Interconnection process and documents →
Southwestern Electric Cooperative Inc.State guidance

Electric cooperative · 24,414 residential customers · Illinois

Interconnection process and documents →
Southeastern IL Electric Cooperative, Inc.State guidance

Electric cooperative · 22,607 residential customers · Illinois

Interconnection process and documents →
Norris Electric CooperativeState guidance

Electric cooperative · 18,163 residential customers · Illinois

Interconnection process and documents →
Jo-Carroll Energy, Inc.State guidance

Electric cooperative · 17,278 residential customers · Illinois

Interconnection process and documents →
Tri-County Electric Cooperative, Inc. (IL)Association model policy

Electric cooperative · 16,203 residential customers · Illinois

Interconnection process and documents →
City of St CharlesState guidance

Municipal utility · 14,901 residential customers · Illinois

Interconnection process and documents →

Export compensation among the researched Illinois utilities: Net billing, NEM. Rules differ by utility – see each utility page.

Illinois interconnection rule

Commission

Illinois Commerce Commission

Interconnection rule

83 Ill. Adm. Code 466 – Electric Interconnection of Distributed Energy Resources Facilities · source

Applies to

Electric public utility distribution companies (ComEd, Ameren Illinois, MidAmerican, Mt. Carmel) for DER <=10 MVA not subject to FERC/RTO jurisdiction (466.10)

Application form

Statewide standard forms: Appendix A Level 1 Application and Contract (v8), Appendix B Certificate of Completion, Appendix C Levels 2-4 Application, Appendix D Levels 1-4 Contract, study agreements E-G

Timelines

Level 1: completeness 7 BD, applicant cure 10 BD, screens 15 BD, applicant 30 BD to sign (+15). Level 2: completeness 10 BD, screens 20 BD, agreement 5/30/45 BD depending on upgrades, supplemental review 30 BD. Witness test within 10 BD of commissioning or deemed waived (App. A); 15 BD notice of commissioning test (466.60(m)).

Fees

Level 1 $50; Level 2 $100+$1/kVA; Level 3 $500+$2/kVA; Level 4 $1,000+$2/kVA (Appendices A and C).

Insurance

Level 1: proof of current homeowner's or other general liability policy; EDC named additional insured where possible (Appendix A).

External disconnect

EDC may require isolation: primary-line lockable visible-break device; secondary-line lockable device with indicated status accessible to EDC; removal of self-contained meter or padlockable draw-out breaker can satisfy it (466.60(i)).

Export compensation

Net billing – 220 ILCS 5/16-107.5; 83 Ill. Adm. Code 465
Customers applying/energized on or after 2025-01-01 receive credit only for the electricity supply portion (CEJA); earlier customers grandfathered at full retail; DG rebate under 16-107.6. Applies to electric utilities and alternative retail suppliers.

Not bound by the rule

Municipal utilities and electric cooperatives are not ICC-jurisdictional and set their own interconnection and net metering policies.

LevelUp toCriteria / review / fee
Level 125 kWLab-certified inverter-based; export <=25 kW and nameplate <=50 kW (nameplate <=25 kW if export not limited); passes screens · Completeness 7 BD; screens 15 BD after complete · $50 application fee (App. A); standardized interconnection cost $200 (466.90)
Level 25000 kWLab-certified; inverter-based nameplate limited by line voltage (500 kW <5 kV, 3 MW 5-15 kV, 4 MW 15-30 kV, 5 MW 30-69 kV); synchronous/induction <=2 MW · Completeness 10 BD; screens 20 BD; agreement 5 BD (no construction) · $100 + $1.00/kVA
Level 310000 kWNon-exporting: area network <=50 kW, or radial circuit with export controls (aggregate export on circuit <=10 MVA) · $500 + $2.00/kVA
Level 410000 kWAll others up to 10 MVA, or failed lower-level screens (studies) · $1,000 + $2.00/kVA (credited to studies)

All 72 utilities in Illinois

Residential customers in Illinois per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.