Home › Utilities › Illinois › Village of Rantoul

Municipal utility

Village of Rantoul interconnection application

Village of Rantoul is a municipal utility serving 6,099 customers in Illinois (EIA-861, 2025). Gridpol files Village of Rantoul interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Illinois’s commission rule (83 Ill. Adm. Code 466) does not bind municipal utilitys; Village of Rantoul sets its own interconnection policy. We confirm its form on the first project. Municipal utilities and electric cooperatives are not ICC-jurisdictional and set their own interconnection and net metering policies.

Village of Rantoul at a glance

Utility

Village of Rantoul

Type

Municipal utility

EIA utility ID

15686

Customers

6,099 (EIA-861, 2025, short form: all customer classes)

Net-metered residential customers

none reported

Service territory

1 county in Illinois

Documents Village of Rantoul asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for Village of Rantoul. We confirm Village of Rantoul’s exact list on the first project.

Illinois interconnection rule

Commission

Illinois Commerce Commission

Interconnection rule

83 Ill. Adm. Code 466 – Electric Interconnection of Distributed Energy Resources Facilities · source

Applies to

Electric public utility distribution companies (ComEd, Ameren Illinois, MidAmerican, Mt. Carmel) for DER <=10 MVA not subject to FERC/RTO jurisdiction (466.10)

Application form

Statewide standard forms: Appendix A Level 1 Application and Contract (v8), Appendix B Certificate of Completion, Appendix C Levels 2-4 Application, Appendix D Levels 1-4 Contract, study agreements E-G

Timelines

Level 1: completeness 7 BD, applicant cure 10 BD, screens 15 BD, applicant 30 BD to sign (+15). Level 2: completeness 10 BD, screens 20 BD, agreement 5/30/45 BD depending on upgrades, supplemental review 30 BD. Witness test within 10 BD of commissioning or deemed waived (App. A); 15 BD notice of commissioning test (466.60(m)).

Fees

Level 1 $50; Level 2 $100+$1/kVA; Level 3 $500+$2/kVA; Level 4 $1,000+$2/kVA (Appendices A and C).

Insurance

Level 1: proof of current homeowner's or other general liability policy; EDC named additional insured where possible (Appendix A).

External disconnect

EDC may require isolation: primary-line lockable visible-break device; secondary-line lockable device with indicated status accessible to EDC; removal of self-contained meter or padlockable draw-out breaker can satisfy it (466.60(i)).

Export compensation

Net billing – 220 ILCS 5/16-107.5; 83 Ill. Adm. Code 465
Customers applying/energized on or after 2025-01-01 receive credit only for the electricity supply portion (CEJA); earlier customers grandfathered at full retail; DG rebate under 16-107.6. Applies to electric utilities and alternative retail suppliers.

Not bound by the rule

Municipal utilities and electric cooperatives are not ICC-jurisdictional and set their own interconnection and net metering policies.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited