Home › Utilities › Illinois › Mt. Carmel Public Utility Co
Investor-owned utilityMt. Carmel Public Utility Co interconnection application
Mt. Carmel Public Utility Co is an investor-owned utility serving 4,337 residential customers in Illinois (EIA-861, 2025). Applications: PDF + email (Mt. Carmel Public Utility Net Metering Department (netmetering@mtcpu.com) or mail: c/o Net Metering Department, PO Box 220, Mt. Carmel, IL 62863). Gridpol files Mt. Carmel Public Utility Co interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Mt. Carmel Public Utility Co’s official sources (see below). Verified from MCPU net metering page, checklist and forms. Open: Part 466 interconnection application form/fee not posted by MCPU (request it), Rider NM size/credit details (scanned PDF), storage rules.
Mt. Carmel Public Utility Co at a glance
Mt Carmel Public Utility Co
TypeInvestor-owned utility
EIA utility ID13032
Residential customers4,337 (EIA-861, 2025)
Net-metered residential customers50 (EIA-861, 2025)
Service territory1 county in Illinois
How to applyPDF + email – Mt. Carmel Public Utility Net Metering Department (netmetering@mtcpu.com) or mail: c/o Net Metering Department, PO Box 220, Mt. Carmel, IL 62863 · official link
Who submitsCustomer signs the Net Metering Application (application lists ICC-certified solar installer license number); installer identified on Installer Certification and Certificate of Completion (owner-install box available). Questions 618-262-5151.
Export compensationNEM – Rider NM - Net Metering Service
Available to Eligible Customers under 220 ILCS 5/16-107.5 with eligible renewable generation in parallel; credit method 1:1 (default) or monetary; annual period anniversary month April or October. Tariff PDF on site is a scan (not text-extracted).
Part 466.90 Level 1: completeness notice within 7 business days (applicant has 10 BD to cure); screens within 15 BD after complete; agreement within 10 BD (minor upgrades) / 15 BD; applicant signs within 30 BD. Utility-specific timelines not stated.
Documents Mt. Carmel Public Utility Co asks for
- Interconnection application formMCPU Application for Net Metering Services (account number, AC nameplate kW, fuel, annual period anniversary month April/October, credit method 1:1 or monetary, ICC certified installer license no.) + $100 fee Gridpol prepares this.
- Interconnection application formDistributed Generation Interconnection Application per 83 Ill. Adm. Code 466 (Appendix A form; Level 1 etc.) - referenced in MCPU checklist, not posted on site Gridpol prepares this.
- Inverter spec sheet (when applicable)Inverter cut sheet/label with manufacturer, model and UL 1741 certification (if inverter-based)
- Single-line diagram (one-line) (when applicable)One-line diagram 'preferred' with every installation Gridpol prepares this.
- Proof of insuranceProof of insurance of the structure: homeowner's/property loss declaration page
- Other utility-specific documentDistributed Generation Installer Certification (83 Ill. Adm. Code 468), with installer certificate # / ICC docket #; optional installation invoice
- Interconnection agreement (when applicable)Standard DG Interconnection Agreement for Level 2, 3 or 4
- Final inspection sign-offCertificate of Completion with copy of signed local electrical inspection (or statement that no inspection jurisdiction); as-built documents for projects >10 kVA
How the Mt. Carmel Public Utility Co process runs
- Complete MCPU Net Metering Application (+ $100 fee) and Part 466 DG interconnection application with inverter spec (UL 1741), one-line diagram and proof of insurance; send to Net Metering Department, PO Box 220, Mt. Carmel, IL 62863 or netmetering@mtcpu.com.
- Utility review per 83 Ill. Adm. Code 466 (Level 1: completeness 7 BD, screens 15 BD); Level 2-4 also need Standard DG Interconnection Agreement.
- Install with lockable, outdoor, visible-blade AC disconnect next to meter (other location only with MCPU permission) and 5x7 in weatherproof 'Parallel Generation Present' plaque.
- Local electrical inspection by authority having jurisdiction.
- Return Certificate of Completion with signed inspection form (as-built docs >10 kVA) and Distributed Generation Installer Certification.
- MCPU decides on witness test, signs Certificate of Completion = final approval; no interconnected operation before MCPU acceptance.
Fees
| Fee | Applies to | Note |
|---|---|---|
| $100 | Net metering application | MCPU Application for Net Metering Services |
| Level 1 interconnection application | Part 466 Appendix A application fee (amount not extracted); Part 466.90 standardized Level 1 cost $200 |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Level 1 | 25 kW | Lab-certified equipment, 83 Ill. Adm. Code 466.80/466.90 |
| Level 2-4 | 10000 kW | <=10 MVA per Part 466 |
Rider NM eligibility per 220 ILCS 5/16-107.5 (Eligible Customer / Eligible Renewable Electrical Generating Facility).
Common issues the utility lists
- AC disconnect not next to meter without MCPU permission (relocation at customer expense)
- Circuit breaker used as AC disconnect (knife-blade visible-gap switch required)
Gridpol’s pre-submission check covers these before we file.
Sources
- Mt. Carmel Public Utility - Renewable Energy / Net Metering (Rider NM, forms, netmetering@mtcpu.com): https://www.mtcpu.com/residential/renewable-energy-net-metering (retrieved 2026-11-13)
- MCPU Checklist of Items for a Distributed Generation Installation under Net Metering: https://www.mtcpu.com/files/5cd49775a9276861512534.pdf (retrieved 2026-11-13)
- MCPU Application for Net Metering Services ($100 fee): https://www.mtcpu.com/files/6759b1a025553336461768.pdf (retrieved 2026-11-13)
- MCPU Distributed Generation Installer Certification (83 Ill. Adm. Code 468): https://www.mtcpu.com/files/5cd1d86196647186301408.pdf (retrieved 2026-11-13)
- MCPU Certificate of Completion: https://www.mtcpu.com/files/5d8e6b6ba864b329047948.pdf (retrieved 2026-11-13)
- MCPU Net Metering Tariff Rider NM (scanned): https://www.mtcpu.com/files/6759c7c241284969145969.pdf (retrieved 2026-11-13)
- 83 Ill. Adm. Code 466.90 Level 1 Expedited Review: https://www.law.cornell.edu/regulations/illinois/Ill-Admin-Code-tit-83-SS-466.90 (retrieved 2026-11-13)
- 83 Ill. Adm. Code 465.35 Net Metering Application and Enrollment: https://www.law.cornell.edu/regulations/illinois/Ill-Admin-Code-tit-83-SS-465.35 (retrieved 2026-11-13)
Other utilities in Illinois
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.