Tri-County Electric Cooperative, Inc. (IL) interconnection application

Tri-County Electric Cooperative, Inc. (IL) is an electric cooperative serving 16,203 residential customers in Illinois (EIA-861, 2025). Gridpol files Tri-County Electric Cooperative, Inc. (IL) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Tri-County Electric Cooperative, Inc. (IL) is a member of Southern Illinois Power Cooperative, which publishes a model interconnection policy (see below); the Illinois rule (83 Ill. Adm. Code 466) also applies where it covers electric cooperatives. Tri-County Electric Cooperative, Inc. (IL)’s own form is confirmed on the first project.

Tri-County Electric Cooperative, Inc. (IL) at a glance

Utility

Tri-County Electric Coop, Inc (IL)

Type

Electric cooperative

EIA utility ID

18955

Residential customers

16,203 (EIA-861, 2025)

Net-metered residential customers

95 (EIA-861, 2025)

Service territory

10 counties in Illinois

Wholesale supplier / association

Southern Illinois Power Cooperative · SIPC Generation Interconnection Process (Interconnection Requests page)

Documents Tri-County Electric Cooperative, Inc. (IL) asks for

  • Interconnection application formRequired by the state rule Gridpol prepares this.
  • Single-line diagram (one-line)Required by the state rule Gridpol prepares this.
  • Site plan / site layoutRequired by the state rule Gridpol prepares this.
  • Inverter spec sheetRequired by the state rule
  • PV module spec sheetRequired by the state rule
  • Battery spec sheetRequired by the state rule
  • UL 1741 / IEEE 1547 certificationRequired by the state rule
  • Proof of insuranceRequired by the state rule
  • Final inspection sign-offRequired by the state rule
  • Interconnection agreementRequired by the state rule
  • Other utility-specific documentRequired by the state rule

Documents required by the Illinois rule. Tri-County Electric Cooperative, Inc. (IL) may ask for more on its own form; we confirm on the first project.

Illinois interconnection rule

Commission

Illinois Commerce Commission

Interconnection rule

83 Ill. Adm. Code 466 – Electric Interconnection of Distributed Energy Resources Facilities · source

Applies to

Electric public utility distribution companies (ComEd, Ameren Illinois, MidAmerican, Mt. Carmel) for DER <=10 MVA not subject to FERC/RTO jurisdiction (466.10)

Application form

Statewide standard forms: Appendix A Level 1 Application and Contract (v8), Appendix B Certificate of Completion, Appendix C Levels 2-4 Application, Appendix D Levels 1-4 Contract, study agreements E-G

Timelines

Level 1: completeness 7 BD, applicant cure 10 BD, screens 15 BD, applicant 30 BD to sign (+15). Level 2: completeness 10 BD, screens 20 BD, agreement 5/30/45 BD depending on upgrades, supplemental review 30 BD. Witness test within 10 BD of commissioning or deemed waived (App. A); 15 BD notice of commissioning test (466.60(m)).

Fees

Level 1 $50; Level 2 $100+$1/kVA; Level 3 $500+$2/kVA; Level 4 $1,000+$2/kVA (Appendices A and C).

Insurance

Level 1: proof of current homeowner's or other general liability policy; EDC named additional insured where possible (Appendix A).

External disconnect

EDC may require isolation: primary-line lockable visible-break device; secondary-line lockable device with indicated status accessible to EDC; removal of self-contained meter or padlockable draw-out breaker can satisfy it (466.60(i)).

Export compensation

Net billing – 220 ILCS 5/16-107.5; 83 Ill. Adm. Code 465
Customers applying/energized on or after 2025-01-01 receive credit only for the electricity supply portion (CEJA); earlier customers grandfathered at full retail; DG rebate under 16-107.6. Applies to electric utilities and alternative retail suppliers.

Not bound by the rule

Municipal utilities and electric cooperatives are not ICC-jurisdictional and set their own interconnection and net metering policies.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited