Home › Utilities › Colorado › Yampa Valley Electric Association Inc.

Electric cooperative

Yampa Valley Electric Association Inc. interconnection application

Yampa Valley Electric Association Inc. is an electric cooperative serving 24,177 residential customers in Colorado, Wyoming (EIA-861, 2025). Gridpol files Yampa Valley Electric Association Inc. interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Colorado’s interconnection rule (4 CCR 723-3, Rules 3850-3859 (Interconnection Procedures and Standards)) applies to Yampa Valley Electric Association Inc.. Levels, timelines and documents below come from that rule; Yampa Valley Electric Association Inc.’s own form and portal are confirmed on the first project.

Yampa Valley Electric Association Inc. at a glance

Utility

Yampa Valley Electric Assn Inc

Type

Electric cooperative

EIA utility ID

21081

Residential customers

24,177 (EIA-861, 2025)

Net-metered residential customers

339 (EIA-861, 2025)

Service territory

5 counties in Colorado, 1 county in Wyoming

Documents Yampa Valley Electric Association Inc. asks for

  • Interconnection application formRequired by the state rule Gridpol prepares this.
  • Interconnection agreementRequired by the state rule
  • UL 1741 / IEEE 1547 certificationRequired by the state rule
  • Final inspection sign-offRequired by the state rule

Documents required by the Colorado rule. Yampa Valley Electric Association Inc. may ask for more on its own form; we confirm on the first project.

Colorado interconnection rule

Commission

Colorado Public Utilities Commission

Interconnection rule

4 CCR 723-3, Rules 3850-3859 (Interconnection Procedures and Standards) – Rules Regulating Electric Utilities - Interconnection Procedures and Standards · source

Applies to

PUC-regulated (investor-owned) utilities - Xcel Energy (PSCo) and Black Hills Colorado Electric - for non-FERC-jurisdictional interconnection of retail renewable DG and other DER incl. storage. Cooperatives must comply with the PUC interconnection standards and insurance requirements per C.R.S. 40-9.5-118(2)(d); municipal utilities adopt functionally similar standards.

Application form

Standard interconnection application form prescribed in the rule (Level 1 application/agreement text in Rule 3854); fees set in each utility's interconnection tariff

Timelines

Receipt notice 3 business days; completeness notice 10 business days (applicant has 10 business days to cure); Level 1 screens 10 business days and approval 10 business days; Level 2 initial review 15 business days; customer signs agreement within 30 business days, utility countersigns within 2; Level 1 witness test/inspection within 10 business days of certificate of completion; operational approval letter 3 business days after successful commissioning; pre-application report 20 business days.

Fees

Processing fee/deposit as specified in the request and the utility's Commission-approved interconnection tariff; no other fees unless the procedures specify. Customer pays upgrades, interconnection facilities, interconnection metering and Level 2/3 commissioning witness costs.

Insurance

Level 1: interconnection customer not required to provide general liability insurance (Rule 3854(c)(VII)).

Export compensation

NEM – C.R.S. 40-2-124(1)(e); 4 CCR 723-3-3664
IOUs: no fixed kW cap; Rule 3664 limits system to 120% of average annual consumption and service entrance capacity (statute as amended allows retail DG up to 200% of expected consumption). Excess kWh carried forward 1:1 monthly; paid at average hourly incremental cost within 60 days of year-end unless customer elects indefinite rollover.

Not bound by the rule

Cooperatives (C.R.S. 40-9.5-118): must offer net metering at least 10 kW residential / 25 kW commercial, 1:1 monthly carryforward, annual excess handled as co-op decides, must comply with PUC interconnection standards and insurance requirements (may reduce/waive insurance). Municipal utilities with >=5,000 customers (C.R.S. 40-2-124(7)): net metering at least 10 kW residential / 25 kW C&I, must adopt and post functionally similar small-generator interconnection standards; written explanation required for denials.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited