Home › Utilities › Colorado › City of Fort Collins
Municipal utilityCity of Fort Collins interconnection application
City of Fort Collins is a municipal utility serving 71,804 residential customers in Colorado (EIA-861, 2025). Gridpol files City of Fort Collins interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Colorado’s commission rule (4 CCR 723-3, Rules 3850-3859 (Interconnection Procedures and Standards)) does not bind municipal utilitys; City of Fort Collins sets its own interconnection policy. We confirm its form on the first project. Cooperatives (C.R.S. 40-9.5-118): must offer net metering at least 10 kW residential / 25 kW commercial, 1:1 monthly carryforward, annual excess handled as co-op decides, must comply with PUC interconnection standards and insurance requirements (may reduce/waive insurance). Municipal utilities with >=5,000 customers (C.R.S. 40-2-124(7)): net metering at least 10 kW residential / 25 kW C&I, must adopt and post functionally similar small-generator interconnection standards; written explanation required for denials.
City of Fort Collins at a glance
City of Fort Collins
TypeMunicipal utility
EIA utility ID6604
Residential customers71,804 (EIA-861, 2025)
Net-metered residential customers4,412 (EIA-861, 2025)
Service territory1 county in Colorado
How to applyPowerClerk · official link
Documents City of Fort Collins asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for City of Fort Collins. We confirm City of Fort Collins’s exact list on the first project.
Colorado interconnection rule
Colorado Public Utilities Commission
Interconnection rule4 CCR 723-3, Rules 3850-3859 (Interconnection Procedures and Standards) – Rules Regulating Electric Utilities - Interconnection Procedures and Standards · source
Applies toPUC-regulated (investor-owned) utilities - Xcel Energy (PSCo) and Black Hills Colorado Electric - for non-FERC-jurisdictional interconnection of retail renewable DG and other DER incl. storage. Cooperatives must comply with the PUC interconnection standards and insurance requirements per C.R.S. 40-9.5-118(2)(d); municipal utilities adopt functionally similar standards.
Application formStandard interconnection application form prescribed in the rule (Level 1 application/agreement text in Rule 3854); fees set in each utility's interconnection tariff
TimelinesReceipt notice 3 business days; completeness notice 10 business days (applicant has 10 business days to cure); Level 1 screens 10 business days and approval 10 business days; Level 2 initial review 15 business days; customer signs agreement within 30 business days, utility countersigns within 2; Level 1 witness test/inspection within 10 business days of certificate of completion; operational approval letter 3 business days after successful commissioning; pre-application report 20 business days.
FeesProcessing fee/deposit as specified in the request and the utility's Commission-approved interconnection tariff; no other fees unless the procedures specify. Customer pays upgrades, interconnection facilities, interconnection metering and Level 2/3 commissioning witness costs.
InsuranceLevel 1: interconnection customer not required to provide general liability insurance (Rule 3854(c)(VII)).
Export compensationNEM – C.R.S. 40-2-124(1)(e); 4 CCR 723-3-3664
IOUs: no fixed kW cap; Rule 3664 limits system to 120% of average annual consumption and service entrance capacity (statute as amended allows retail DG up to 200% of expected consumption). Excess kWh carried forward 1:1 monthly; paid at average hourly incremental cost within 60 days of year-end unless customer elects indefinite rollover.
Cooperatives (C.R.S. 40-9.5-118): must offer net metering at least 10 kW residential / 25 kW commercial, 1:1 monthly carryforward, annual excess handled as co-op decides, must comply with PUC interconnection standards and insurance requirements (may reduce/waive insurance). Municipal utilities with >=5,000 customers (C.R.S. 40-2-124(7)): net metering at least 10 kW residential / 25 kW C&I, must adopt and post functionally similar small-generator interconnection standards; written explanation required for denials.
- 4 CCR 723-3-3853 General Interconnection Procedures: https://www.law.cornell.edu/regulations/colorado/4-CCR-723-3-3853 (retrieved 2026-11-13)
- 4 CCR 723-3-3854 Level 1 Process: https://www.law.cornell.edu/regulations/colorado/4-CCR-723-3-3854 (retrieved 2026-11-13)
- 4 CCR 723-3-3855 Level 2 Fast Track: https://www.law.cornell.edu/regulations/colorado/4-CCR-723-3-3855 (retrieved 2026-11-13)
- 4 CCR 723-3-3664 Net Metering: https://www.law.cornell.edu/regulations/colorado/4-CCR-723-3-3664 (retrieved 2026-11-13)
- C.R.S. 40-2-124: https://colorado.public.law/statutes/crs_40-2-124 (retrieved 2026-11-13)
- C.R.S. 40-9.5-118: https://colorado.public.law/statutes/crs_40-9.5-118 (retrieved 2026-11-13)
Other utilities in Colorado
- Xcel Energy (Colorado)1,379,910
- Colorado Springs Utilities220,059
- CORE Electric Cooperative168,587
- United Power, Inc.103,104
- Black Hills Energy (Colorado)97,888
- Mountain View Electric Association, Inc.61,343
- Poudre Valley REA, Inc.50,933
- Holy Cross Electric Association, Inc.50,431
- City of Longmont41,483
- La Plata Electric Association, Inc.40,369
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.