CORE Electric Cooperative interconnection application

CORE Electric Cooperative is an electric cooperative serving 168,587 residential customers in Colorado (EIA-861, 2025). Applications: PowerClerk (CORE SGI PowerClerk). Gridpol files CORE Electric Cooperative interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from CORE Electric Cooperative’s official sources (see below). PTO/meter step sequence after Certificate of Completion not detailed online; verify on first project.

CORE Electric Cooperative at a glance

Utility

CORE Electric Cooperative

Type

Electric cooperative

EIA utility ID

9336

Residential customers

168,587 (EIA-861, 2025)

Net-metered residential customers

10,448 (EIA-861, 2025)

Service territory

11 counties in Colorado

How to apply

PowerClerk – CORE SGI PowerClerk · official link

Who submits

Interconnection Customer (member) signs the application; equipment installation/electrical contractor listed on the form and may file via PowerClerk (PowerClerk Applicant User Guide).

Export compensation

NEM – Net metering
kWh-for-kWh offset, monthly carryforward; annual true-up after April billing cycle at avoided cost ($0.04616/kWh from May 2026). CORE takes RECs unless notified of transfer.

Review time (official)

Per SGIP 750-01: receipt notice within 3 business days; completeness determination within 10 business days; customer has 10 business days to cure; Level 2 initial review 15 business days after complete; pre-application report 20 business days.

Documents CORE Electric Cooperative asks for

  • Interconnection application formLevel 1 Generator Interconnect and/or Energy Storage Application (Short Form, Attachment 4) Gridpol prepares this.
  • Single-line diagram (one-line)One-line diagram Gridpol prepares this.
  • Site plan / site layoutShow all equipment locations and fencing Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetCertified inverter; supporting documents required for export limiting
  • Battery spec sheet (when applicable)If storage included
  • Customer signatureInterconnection customer certification signature
  • Other utility-specific documentSite control documentation; signed electrical permit copy; Certificate of Completion returned after installation; SGI signage requirements

How the CORE Electric Cooperative process runs

  1. Submit Level 1 application with documents and $195 fee via PowerClerk
  2. CORE acknowledges receipt and determines completeness
  3. Contingent approval signed by CORE
  4. Install system; electrical permit/inspection
  5. Return Certificate of Completion
  6. CORE meter work and authorization to operate

Fees

FeeApplies toNote
$195Level 1 (<=25 kW certified inverter), non-refundable
$1,000Level 1A (multi-site developer pre-approval)
$500Level 2 Fast Track

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 125 kWCertified inverter-based, residential or commercial
Level 2 Fast Track5000 kW2-5 MW depending on line voltage/location
Level 320000 kW>5 MW and <20 MW
Net metering cap10 kW

Net metering only up to lesser of 200% of 12-month historical usage, 10 kW residential or 25 kW commercial; larger systems as Qualifying Facility.

Storage, EV and stamps

Battery storage

Storage on same Level 1 form (inverter make/model, kW, kWh). 'Batteries are subject to no-export restrictions.' Back-up generators/storage for backup only follow the Standby Power Connection Procedure. No meter collar adapter program yet (awaiting state rules under HB26-1007).

Common issues the utility lists

  • Incomplete interconnection request (written list of missing items; 10 business days to cure)
  • Changes in equipment, design, site or installer after approval forfeit fee and require resubmittal

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited