Colorado interconnection applications
59 electric utilities serve Colorado (EIA-861, 2025): 2 investor-owned utilitys, 28 municipal utilitys, 28 electric cooperatives, 1 federal power agency. Together they serve 2,529,642 residential customers; 191,943 residential customers were on net metering at year-end 2025.
Largest utilities in Colorado
Investor-owned utility · 1,379,910 residential customers · Colorado
Applications: Own online portal – Xcel Energy Colorado DER Interconnection Application Portal (Salesforce-based, co.my.xcelenergy.com)
Interconnection process and documents →Municipal utility · 220,059 residential customers · Colorado
Applications: Own online portal – Connecting Solar portal (eTRACK+)
Interconnection process and documents →Electric cooperative · 168,587 residential customers · Colorado
Applications: PowerClerk – CORE SGI PowerClerk
Interconnection process and documents →Electric cooperative · 103,104 residential customers · Colorado
Interconnection process and documents →Investor-owned utility · 97,888 residential customers · Colorado
Applications: Own online portal – Black Hills Energy Colorado online interconnection application portal (web-based, since July 2019)
Interconnection process and documents →Municipal utility · 71,804 residential customers · Colorado
Applications: PowerClerk
Interconnection process and documents →Electric cooperative · 61,343 residential customers · Colorado
Interconnection process and documents →Electric cooperative · 50,933 residential customers · Colorado
Interconnection process and documents →Electric cooperative · 50,431 residential customers · Colorado
Applications: PowerClerk – PowerClerk
Interconnection process and documents →Municipal utility · 41,483 residential customers · Colorado
Interconnection process and documents →Electric cooperative · 40,369 residential customers · Colorado
Interconnection process and documents →Municipal utility · 37,387 residential customers · Colorado
Interconnection process and documents →Export compensation among the researched Colorado utilities: NEM. Rules differ by utility – see each utility page.
Colorado interconnection rule
Colorado Public Utilities Commission
Interconnection rule4 CCR 723-3, Rules 3850-3859 (Interconnection Procedures and Standards) – Rules Regulating Electric Utilities - Interconnection Procedures and Standards · source
Applies toPUC-regulated (investor-owned) utilities - Xcel Energy (PSCo) and Black Hills Colorado Electric - for non-FERC-jurisdictional interconnection of retail renewable DG and other DER incl. storage. Cooperatives must comply with the PUC interconnection standards and insurance requirements per C.R.S. 40-9.5-118(2)(d); municipal utilities adopt functionally similar standards.
Application formStandard interconnection application form prescribed in the rule (Level 1 application/agreement text in Rule 3854); fees set in each utility's interconnection tariff
TimelinesReceipt notice 3 business days; completeness notice 10 business days (applicant has 10 business days to cure); Level 1 screens 10 business days and approval 10 business days; Level 2 initial review 15 business days; customer signs agreement within 30 business days, utility countersigns within 2; Level 1 witness test/inspection within 10 business days of certificate of completion; operational approval letter 3 business days after successful commissioning; pre-application report 20 business days.
FeesProcessing fee/deposit as specified in the request and the utility's Commission-approved interconnection tariff; no other fees unless the procedures specify. Customer pays upgrades, interconnection facilities, interconnection metering and Level 2/3 commissioning witness costs.
InsuranceLevel 1: interconnection customer not required to provide general liability insurance (Rule 3854(c)(VII)).
Export compensationNEM – C.R.S. 40-2-124(1)(e); 4 CCR 723-3-3664
IOUs: no fixed kW cap; Rule 3664 limits system to 120% of average annual consumption and service entrance capacity (statute as amended allows retail DG up to 200% of expected consumption). Excess kWh carried forward 1:1 monthly; paid at average hourly incremental cost within 60 days of year-end unless customer elects indefinite rollover.
Cooperatives (C.R.S. 40-9.5-118): must offer net metering at least 10 kW residential / 25 kW commercial, 1:1 monthly carryforward, annual excess handled as co-op decides, must comply with PUC interconnection standards and insurance requirements (may reduce/waive insurance). Municipal utilities with >=5,000 customers (C.R.S. 40-2-124(7)): net metering at least 10 kW residential / 25 kW C&I, must adopt and post functionally similar small-generator interconnection standards; written explanation required for denials.
| Level | Up to | Criteria / review / fee |
|---|---|---|
| Level 1 (25 kW inverter process) | 25 kW | certified inverter-based resource <=25 kW AC, may be paired with non-exporting storage <=25 kW AC · acknowledge 3 business days; completeness 10; screens 10; approval/execution 10 business days · tariff fee (blank in rule form) |
| Level 2 (Fast Track) | 2000 kW | certified inverter-based: <5 kV line 500 kW; 5-15 kV 2 MW (3 MW at mainline/substation); 15-30 kV 3/4 MW; 30-69 kV 4/5 MW; synchronous/induction 2 MW · initial review 15 business days after complete; supplemental review 30 business days · tariff application fee/deposit |
| Level 3 (Study process) | requests failing Level 1 and Level 2 · study deposits per tariff | |
| Non-export process | non-exporting resources |
- 4 CCR 723-3-3853 General Interconnection Procedures: https://www.law.cornell.edu/regulations/colorado/4-CCR-723-3-3853 (retrieved 2026-11-13)
- 4 CCR 723-3-3854 Level 1 Process: https://www.law.cornell.edu/regulations/colorado/4-CCR-723-3-3854 (retrieved 2026-11-13)
- 4 CCR 723-3-3855 Level 2 Fast Track: https://www.law.cornell.edu/regulations/colorado/4-CCR-723-3-3855 (retrieved 2026-11-13)
- 4 CCR 723-3-3664 Net Metering: https://www.law.cornell.edu/regulations/colorado/4-CCR-723-3-3664 (retrieved 2026-11-13)
- C.R.S. 40-2-124: https://colorado.public.law/statutes/crs_40-2-124 (retrieved 2026-11-13)
- C.R.S. 40-9.5-118: https://colorado.public.law/statutes/crs_40-9.5-118 (retrieved 2026-11-13)
All 59 utilities in Colorado
- Xcel Energy (Colorado)1,379,910
- Colorado Springs Utilities220,059
- CORE Electric Cooperative168,587
- United Power, Inc.103,104
- Black Hills Energy (Colorado)97,888
- City of Fort Collins71,804
- Mountain View Electric Association, Inc.61,343
- Poudre Valley REA, Inc.50,933
- Holy Cross Electric Association, Inc.50,431
- City of Longmont41,483
- La Plata Electric Association, Inc.40,369
- City of Loveland37,387
- Delta Montrose Electric Association32,985
- Yampa Valley Electric Association Inc.23,604
- San Isabel Electric Association, Inc.23,415
- Mountain Parks Electric, Inc.19,571
- Grand Valley Power17,657
- City of Fountain17,088
- Empire Electric Association, Inc.13,016
- San Miguel Power Association, Inc.12,379
- San Luis Valley R E C, Inc.8,948
- Southeast Colorado Power Association8,169
- Morgan County Rural Electric Association5,891
- City of Fort Morgan5,434
- Highline Electric Association5,013
- Y-W Electric Association Inc.4,878
- K C Electric Association3,411
- White River Electric Association, Inc.2,641
- Moon Lake Electric Association Inc.1,525
- High West Energy, Inc.671
- Wheatland Electric Cooperative, Inc.29
- Tri-County Electric Cooperative, Inc. (OK)14
- Southwestern Electric Cooperative Inc.5
- Sangre De Cristo Electric Association Inc.0
- Gunnison County Electric Association.0
- Town of Estes Park0
- City of Glenwood Springs0
- City of Gunnison0
- City of Trinidad0
- City of Lamar0
- City of La Junta0
- City of Delta0
- City of Aspen0
- City of Las Animas0
- City of Burlington0
- City of Yuma0
- City of Center0
- City of Wray0
- City of Holyoke0
- Town of Lyons0
- City of Julesburg0
- City of Springfield0
- Town of Oak Creek0
- Town of Haxtun0
- Town of Holly0
- Town of Granada0
- WAPA-- Western Area Power Administration0
- Town of Fleming0
- Deseret Generation & Tran Cooperative0
Residential customers in Colorado per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.