Home › Utilities › Colorado

Colorado

Colorado interconnection applications

59 electric utilities serve Colorado (EIA-861, 2025): 2 investor-owned utilitys, 28 municipal utilitys, 28 electric cooperatives, 1 federal power agency. Together they serve 2,529,642 residential customers; 191,943 residential customers were on net metering at year-end 2025.

Largest utilities in Colorado

Xcel Energy (Colorado)Process verified

Investor-owned utility · 1,379,910 residential customers · Colorado

Applications: Own online portal – Xcel Energy Colorado DER Interconnection Application Portal (Salesforce-based, co.my.xcelenergy.com)

Interconnection process and documents →
Colorado Springs UtilitiesProcess verified

Municipal utility · 220,059 residential customers · Colorado

Applications: Own online portal – Connecting Solar portal (eTRACK+)

Interconnection process and documents →
CORE Electric CooperativeProcess verified

Electric cooperative · 168,587 residential customers · Colorado

Applications: PowerClerk – CORE SGI PowerClerk

Interconnection process and documents →
United Power, Inc.State rule applies

Electric cooperative · 103,104 residential customers · Colorado

Interconnection process and documents →
Black Hills Energy (Colorado)Partly researched

Investor-owned utility · 97,888 residential customers · Colorado

Applications: Own online portal – Black Hills Energy Colorado online interconnection application portal (web-based, since July 2019)

Interconnection process and documents →
City of Fort CollinsState guidance

Municipal utility · 71,804 residential customers · Colorado

Applications: PowerClerk

Interconnection process and documents →
Mountain View Electric Association, Inc.State rule applies

Electric cooperative · 61,343 residential customers · Colorado

Interconnection process and documents →
Poudre Valley REA, Inc.State rule applies

Electric cooperative · 50,933 residential customers · Colorado

Interconnection process and documents →
Holy Cross Electric Association, Inc.State rule applies

Electric cooperative · 50,431 residential customers · Colorado

Applications: PowerClerk – PowerClerk

Interconnection process and documents →
City of LongmontState guidance

Municipal utility · 41,483 residential customers · Colorado

Interconnection process and documents →
La Plata Electric Association, Inc.State rule applies

Electric cooperative · 40,369 residential customers · Colorado

Interconnection process and documents →
City of LovelandState guidance

Municipal utility · 37,387 residential customers · Colorado

Interconnection process and documents →

Export compensation among the researched Colorado utilities: NEM. Rules differ by utility – see each utility page.

Colorado interconnection rule

Commission

Colorado Public Utilities Commission

Interconnection rule

4 CCR 723-3, Rules 3850-3859 (Interconnection Procedures and Standards) – Rules Regulating Electric Utilities - Interconnection Procedures and Standards · source

Applies to

PUC-regulated (investor-owned) utilities - Xcel Energy (PSCo) and Black Hills Colorado Electric - for non-FERC-jurisdictional interconnection of retail renewable DG and other DER incl. storage. Cooperatives must comply with the PUC interconnection standards and insurance requirements per C.R.S. 40-9.5-118(2)(d); municipal utilities adopt functionally similar standards.

Application form

Standard interconnection application form prescribed in the rule (Level 1 application/agreement text in Rule 3854); fees set in each utility's interconnection tariff

Timelines

Receipt notice 3 business days; completeness notice 10 business days (applicant has 10 business days to cure); Level 1 screens 10 business days and approval 10 business days; Level 2 initial review 15 business days; customer signs agreement within 30 business days, utility countersigns within 2; Level 1 witness test/inspection within 10 business days of certificate of completion; operational approval letter 3 business days after successful commissioning; pre-application report 20 business days.

Fees

Processing fee/deposit as specified in the request and the utility's Commission-approved interconnection tariff; no other fees unless the procedures specify. Customer pays upgrades, interconnection facilities, interconnection metering and Level 2/3 commissioning witness costs.

Insurance

Level 1: interconnection customer not required to provide general liability insurance (Rule 3854(c)(VII)).

Export compensation

NEM – C.R.S. 40-2-124(1)(e); 4 CCR 723-3-3664
IOUs: no fixed kW cap; Rule 3664 limits system to 120% of average annual consumption and service entrance capacity (statute as amended allows retail DG up to 200% of expected consumption). Excess kWh carried forward 1:1 monthly; paid at average hourly incremental cost within 60 days of year-end unless customer elects indefinite rollover.

Not bound by the rule

Cooperatives (C.R.S. 40-9.5-118): must offer net metering at least 10 kW residential / 25 kW commercial, 1:1 monthly carryforward, annual excess handled as co-op decides, must comply with PUC interconnection standards and insurance requirements (may reduce/waive insurance). Municipal utilities with >=5,000 customers (C.R.S. 40-2-124(7)): net metering at least 10 kW residential / 25 kW C&I, must adopt and post functionally similar small-generator interconnection standards; written explanation required for denials.

LevelUp toCriteria / review / fee
Level 1 (25 kW inverter process)25 kWcertified inverter-based resource <=25 kW AC, may be paired with non-exporting storage <=25 kW AC · acknowledge 3 business days; completeness 10; screens 10; approval/execution 10 business days · tariff fee (blank in rule form)
Level 2 (Fast Track)2000 kWcertified inverter-based: <5 kV line 500 kW; 5-15 kV 2 MW (3 MW at mainline/substation); 15-30 kV 3/4 MW; 30-69 kV 4/5 MW; synchronous/induction 2 MW · initial review 15 business days after complete; supplemental review 30 business days · tariff application fee/deposit
Level 3 (Study process)requests failing Level 1 and Level 2 · study deposits per tariff
Non-export processnon-exporting resources

All 59 utilities in Colorado

Residential customers in Colorado per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks