Home › Utilities › Alaska › MEA
Electric cooperativeMEA interconnection application
MEA is an electric cooperative serving 65,371 residential customers in Alaska (EIA-861, 2025). Applications: PDF + email (Net Metering Interconnection Application + Agreement (PDF) to NetMetering@mea.coop or any MEA office). Gridpol files MEA interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from MEA’s official sources (see below). Confirmed from mea.coop net metering page, current application, Sep 2024 agreement and FAQ. Current SFPPR value not recorded (see mea.coop current rates sheet).
MEA at a glance
Matanuska Electric Assn Inc
TypeElectric cooperative
EIA utility ID11824
Residential customers65,371 (EIA-861, 2025)
Net-metered residential customers517 (EIA-861, 2025)
Service territory2 counties in Alaska
How to applyPDF + email – Net Metering Interconnection Application + Agreement (PDF) to NetMetering@mea.coop or any MEA office · official link
Who submitsAuthorized user(s) on the MEA account sign the application (facility address must match account); they may authorize MEA to communicate with a named contact person and/or contractor. Installer not required. Tenant transfers sign the Agreement Addendum.
Export compensationNEM – MEA Net Metering (tariff, 3 AAC 50.900-949)
Monthly netting; net excess credited at non-firm Small Facility Power Purchase Rate (SFPPR), adjusted quarterly. Credit balances over $15 paid annually or at termination.
MEA states 2-4 weeks for application processing depending on workload; two-way meter installation generally less than one week after approval.
Documents MEA asks for
- Interconnection application formMEA Net Metering Interconnection Application (generator, inverter, storage fields; max AC to grid; rental yes/no) Gridpol prepares this.
- Interconnection agreementMEA Net Metering Interconnection Agreement (Sep 2024 version), completed with application
- UL 1741 / IEEE 1547 certificationUL 1741 certification(s) attached
- Other utility-specific documentIEEE 1547 certification(s) and inverter grid settings (spec sheet not sufficient; IEEE 1547-2018 Category I)
- Site plan / site layoutOrientation to MEA system, dwelling, improvements, property lines; nearest pole and pole number Gridpol prepares this.
- Single-line diagram (one-line)Detailed electrical one-line diagram Gridpol prepares this.
- Photos (meter, main panel, equipment) (optional)Not required; placards on meter base and disconnect (NEC 690) checked at site inspection
How the MEA process runs
- Design system (member/installer); optionally send application first to verify size and equipment
- Submit completed application + agreement with UL 1741/IEEE 1547 certs, inverter settings, site plan and one-line diagram (email NetMetering@mea.coop or MEA office)
- MEA engineering review of interconnection (2-4 weeks); pay any interconnection costs before agreement executed
- Install with disconnect switch and placards; MEA final site inspection (Witness Test for islanding systems)
- Approval: billing and meter relay notified; MEA installs bi-directional meter (<1 week); do not export until MEA notifies agreement executed and meter changed
Fees
| Fee | Applies to | Note |
|---|---|---|
| $0 | Application (≤25 kW net metering) | No application fee per MEA net metering page |
| actual cost | Interconnection upgrades if needed (engineering, hardware, labor) | Paid in full per Letter of Agreement before agreement executed/MEA work; bi-directional meter furnished at no cost |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Net metering | 25 kW | Total AC nameplate per property/lot regardless of number of meters (unless inverter output limited) |
| QF-1 (Qualifying Facility) | 100 kW | Separate program <100 kW, no netting |
| Net metering cap | 25 kW |
3 AAC 50.900-949; renewable resource on member's property.
Storage, EV and stamps
Battery storage
Application has storage fields (kW, kWh). Islanding-capable systems need an IEEE 1547 certified islanding inverter, automatic transfer switch or approved isolation device, synchronize before reconnect, and an MEA Witness Test before parallel operation.
Common issues the utility lists
- Incomplete application delays processing (all fields, attachments must be accepted as complete)
- Inverter spec sheet submitted instead of inverter grid settings
- Total generation over 25 kW per property without inverter limiting (must use QF-1)
Gridpol’s pre-submission check covers these before we file.
Sources
- MEA Net Metering: https://www.mea.coop/co-op-benefits/net-metering (retrieved 2026-11-13)
- MEA Net Metering Interconnection Application: https://cdn.prod.website-files.com/5fb0ad9934bc7925eff9ad65/668c165dd3d383b18011a3d1_Net%20Metering%20Interconnection%20Application.pdf (retrieved 2026-11-13)
- MEA Net Metering Interconnection Agreement (Sep 2024): https://cdn.prod.website-files.com/5fb0ad9934bc7925eff9ad65/66d9fa0ab31fae32f4b2c5dd_Net%20Metering%20Interconnection%20Agreement%20sep%202024.pdf (retrieved 2026-11-13)
- MEA Net Metering FAQ: https://cdn.prod.website-files.com/5fb0ad9934bc7925eff9ad65/659dd1bfa6a1c8d9bbc9d34a_Net%20Metering%20FAQ%20(1).pdf (retrieved 2026-11-13)
- Alaska Administrative Code 3 AAC 50.900-949 Net Metering (RCA): http://www.akleg.gov/basis/aac.asp#3.50.900 (retrieved 2026-11-13)
Other utilities in Alaska
- Chugach Electric97,742
- Golden Valley Electric Association Inc.40,931
- Homer Electric Association Inc.30,143
- AEL&P15,516
- Alaska Village Electric Cooperative, Inc.7,853
- Ketchikan Public Utilities6,608
- AP&T (Alaska Power Company)5,798
- Kodiak Electric Association Inc.4,676
- Kotzebue Electric Association Inc.1,217
- City & Borough of Sitka0
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.