Home › Utilities › Alaska › Chugach Electric
Electric cooperativeChugach Electric interconnection application
Chugach Electric is an electric cooperative serving 97,742 residential customers in Alaska (EIA-861, 2025). Applications: PDF + email (Engineering Request form ('Customer Generation') + emailed application link). Gridpol files Chugach Electric interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Chugach Electric’s official sources (see below).
Chugach Electric at a glance
Chugach Electric Assn Inc
TypeElectric cooperative
EIA utility ID3522
Residential customers97,742 (EIA-861, 2025)
Net-metered residential customers1,029 (EIA-861, 2025)
Service territory2 counties in Alaska
How to applyPDF + email – Engineering Request form ('Customer Generation') + emailed application link · official link
Who submitsMember (account holder) signs; form has sections for design/engineering company and electrical contractor.
Export compensationAvoided cost – Net Metering Service, Tariff Sheet 89.3 / Sheet 97
Excess kWh credited at non-firm buyback rate; existing AMI meter used, no new meter.
Application processing time 2-4 weeks (application form).
Documents Chugach Electric asks for
- Interconnection application formApplication for Net Metering Installation (2026) Gridpol prepares this.
- Single-line diagram (one-line)Proposed one-line diagram with disconnect/overcurrent devices and interconnection method Gridpol prepares this.
- Inverter spec sheetEquipment specifications
- Interconnection agreementSigned before energizing
- Final inspection sign-offAnchorage Bowl: Municipality of Anchorage green tag; outside: Chugach inspects
How the Chugach Electric process runs
- Submit Engineering Request ('Customer Generation')
- Submit application + specs + one-line before buying equipment; pay $270
- Chugach preliminary interconnection study and sign-off
- Install; MOA green tag (Anchorage Bowl) or Chugach inspection
- Submit signed Interconnection Agreement; written approval before energizing
Fees
| Fee | Applies to | Note |
|---|---|---|
| $270 | Net metering application (non-refundable) | Effective 1 Jun 2026 |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Net metering | 25 kW | 25 kW maximum nameplate; larger via Application for Interconnected Generation |
| Net metering cap | 25 kW |
Community solar + on-site combined cap 25 kW.
Storage, EV and stamps
Battery storage
Battery storage to be described as ancillary equipment on application; no further rules stated.
Sources
- Chugach - Renewable Generation: https://www.chugachelectric.com/energy-solutions/renewable-generation (retrieved 2026-11-13)
- Chugach Application for Net Metering Installation 2026: https://www.chugachelectric.com/system/files/Application%20for%20Net%20Metering%202026.pdf (retrieved 2026-11-13)
- Chugach Net Metering FAQ 05-2026: https://www.chugachelectric.com/system/files/Solar%20Installation%20FAQ%2005-2026.pdf (retrieved 2026-11-13)
- Alaska Administrative Code 3 AAC 50.900-949 Net Metering (RCA): http://www.akleg.gov/basis/aac.asp#3.50.900 (retrieved 2026-11-13)
Other utilities in Alaska
- MEA65,371
- Golden Valley Electric Association Inc.40,931
- Homer Electric Association Inc.30,143
- AEL&P15,516
- Alaska Village Electric Cooperative, Inc.7,853
- Ketchikan Public Utilities6,608
- AP&T (Alaska Power Company)5,798
- Kodiak Electric Association Inc.4,676
- Kotzebue Electric Association Inc.1,217
- City & Borough of Sitka0
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.