Home › Utilities › Alaska › AEL&P
Investor-owned utilityAEL&P interconnection application
AEL&P is an investor-owned utility serving 15,516 residential customers in Alaska (EIA-861, 2025). Applications: PDF + mail (Written application to AEL&P (tariff Rule 6.13; no published form)). Gridpol files AEL&P interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. verify on first project: aelp.com has no net metering/interconnection page or form; current RCA tariff (rca.alaska.gov) blocked (403), so only the 2017 tariff compilation was read. Confirm whether AEL&P offers net metering or only Schedule 94 QF purchase, the application form, current buyback rate and inspection/meter steps with AEL&P (907-759-5900).
AEL&P at a glance
Alaska Electric Light & Power Co. (Avista Corp)
TypeInvestor-owned utility
EIA utility ID213
Residential customers15,516 (EIA-861, 2025)
Net-metered residential customersnone reported
Service territory1 county in Alaska
How to applyPDF + mail – Written application to AEL&P (tariff Rule 6.13; no published form)
Who submitsCustomer makes written application to the Company (tariff Rule 6.13, 2017 compilation). No published net metering application or installer authorization form found on aelp.com.
Export compensationAvoided cost – Schedule No. 94 Purchase of Energy from a Qualifying Facility ≤100 kW
Rate A $0.0/kWh when hydro meets firm load; Rate B diesel-based avoided cost when diesel used (e.g. $0.2288/kWh in 2017 sheet); adjusted with quarterly COPA filings. Current sheet not retrieved (RCA site blocked).
Application required at least 45 days before connection (Rule 6.13(a)); no review timeline stated.
Documents AEL&P asks for
- Interconnection application formWritten application at least 45 days before any connection (Rule 6.13(a)) Gridpol prepares this.
- Single-line diagram (one-line)Schematics and wiring diagrams (Rule 6.13(b)) Gridpol prepares this.
- Inverter spec sheetPerformance specifications, circuit protection, regulation and automatic disconnect equipment (Rule 6.13(b))
- Battery spec sheet (when applicable)Descriptions of energy storage devices (Rule 6.13(b))
How the AEL&P process runs
- Submit written application to AEL&P at least 45 days before connection
- Provide schematics, wiring diagrams, specs, storage, protection and automatic disconnect documentation
- AEL&P approves interconnection; customer pays special metering/circuit modification costs
- Comply with tariff Section 4 safety standards for QF interconnection before parallel operation
Fees
| Fee | Applies to | Note |
|---|---|---|
| actual cost | Special metering equipment or circuit modifications | Customer pays after approval (Rule 6.13(c)) |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Rule 6.13 / Schedule 94 QF | 100 kW | Customer-owned alternate technology generation under 100 kW installed capacity |
No AEL&P net metering schedule found in the 2017 tariff compilation. 3 AAC 50.900(b)(1) exempts an independent system supplied 100% by renewables (except standby fossil); AEL&P (islanded Juneau grid, hydro) may fall under this - not confirmed.
Storage, EV and stamps
Battery storage
Energy storage devices must be described in the interconnection documentation (Rule 6.13(b)). Customer fossil-fuel standby generators may not be interconnected/operated in parallel.
EV chargers
AEL&P publishes Rate 93/94 EVSE customer request form and service standards SS-16 (customer-owned EV charging) and SS-17 (leased EV charging).
Sources
- AEL&P Tariff RCA No. 1 compilation 2017 (Rule 6.13, Schedule 94): https://www.aelp.com/Portals/0/Assets/Documents/AELP-TARIFF_2017-searchable.pdf (retrieved 2026-11-13)
- AEL&P Tariff page (links to RCA tariff): https://www.aelp.com/Customer-Service/Tariff (retrieved 2026-11-13)
- AEL&P Alternative Energy: https://www.aelp.com/Energy-Conservation/Alternative-Energy (retrieved 2026-11-13)
- AEL&P Forms (no generation/net metering form listed): https://www.aelp.com/Forms (retrieved 2026-11-13)
- 3 AAC 50.900-949 Net Metering (applicability and exemptions): https://www.akleg.gov/basis/aac.asp?media=print&secStart=3.50.900&secEnd=3.50.949 (retrieved 2026-11-13)
Alaska interconnection rule
Regulatory Commission of Alaska (RCA)
Interconnection rule3 AAC 50.900-50.949 (Net Metering Standards), interconnection in 3 AAC 50.940 – Net Metering Standards - Interconnection of eligible consumer generation systems · source
Applies toElectric utilities subject to RCA economic regulation (e.g. Chugach Electric, MEA, GVEA, HEA, Alaska Electric Light & Power, AVEC), except independent systems with <5,000,000 kWh prior-year retail sales, 100%-renewable independent systems, or distribution portions exempted for stability (3 AAC 50.900(b)).
Application formUtility-specific interconnection application of no more than two pages, in utility interconnection tariff filed with RCA (3 AAC 50.940(a)).
FeesNo extra standby, capacity, interconnection or other net-metering fees unless commission approves (3 AAC 50.930); disconnect switch cost may be charged per 50.940.
InsuranceUtility tariff may require liability insurance only if coverage is readily available at reasonable cost to the consumer (3 AAC 50.940(a)).
External disconnectTariff must address external disconnect switch unless utility finds it unnecessary; consumer may choose switch at utility-designated accessible location or agreement allowing utility to disconnect generation and load. Switch+wiring cost chargeable if within 5 ft of meter base/at main structure; elsewhere consumer pays switch, utility pays wiring (3 AAC 50.940(a)).
Export compensationNEM – 3 AAC 50.900-50.949
Monthly netting; net excess credited at utility's non-firm power rate (avoided-cost type), credits never expire (3 AAC 50.930). IEEE 1547 / UL 1741 may be used as technical standards.
Electric cooperatives under RCA economic regulation are covered. Municipal utilities and utilities exempt from RCA economic regulation (AS 42.05) are not bound and set their own policies.
- 3 AAC 50 Art. 3 Net Metering Standards (LII): https://www.law.cornell.edu/regulations/alaska/title-3/part-7/chapter-50/article-3 (retrieved 2026-11-13)
- 3 AAC 50.900: https://www.law.cornell.edu/regulations/alaska/3-AAC-50.900 (retrieved 2026-11-13)
- 3 AAC 50.940: https://www.law.cornell.edu/regulations/alaska/3-AAC-50.940 (retrieved 2026-11-13)
- 3 AAC 50.930: https://www.law.cornell.edu/regulations/alaska/3-AAC-50.930 (retrieved 2026-11-13)
Other utilities in Alaska
- Chugach Electric97,742
- MEA65,371
- Golden Valley Electric Association Inc.40,931
- Homer Electric Association Inc.30,143
- Alaska Village Electric Cooperative, Inc.7,853
- Ketchikan Public Utilities6,608
- AP&T (Alaska Power Company)5,798
- Kodiak Electric Association Inc.4,676
- Kotzebue Electric Association Inc.1,217
- City & Borough of Sitka0
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.