Home › Utilities › Alaska

Alaska

Alaska interconnection applications

66 electric utilities serve Alaska (EIA-861, 2025): 19 electric cooperatives, 14 investor-owned utilitys, 30 municipal utilitys, 3 public power districts. Together they serve 275,855 residential customers; 3,005 residential customers were on net metering at year-end 2025.

Largest utilities in Alaska

Chugach ElectricProcess verified

Electric cooperative · 97,742 residential customers · Alaska

Applications: PDF + email – Engineering Request form ('Customer Generation') + emailed application link

Interconnection process and documents →
MEAProcess verified

Electric cooperative · 65,371 residential customers · Alaska

Applications: PDF + email – Net Metering Interconnection Application + Agreement (PDF) to NetMetering@mea.coop or any MEA office

Interconnection process and documents →
Golden Valley Electric Association Inc.State rule applies

Electric cooperative · 40,931 residential customers · Alaska

Interconnection process and documents →
Homer Electric Association Inc.State rule applies

Electric cooperative · 30,143 residential customers · Alaska

Interconnection process and documents →
AEL&PPartly researched

Investor-owned utility · 15,516 residential customers · Alaska

Applications: PDF + mail – Written application to AEL&P (tariff Rule 6.13; no published form)

Interconnection process and documents →
Alaska Village Electric Cooperative, Inc.State rule applies

Electric cooperative · 7,853 residential customers · Alaska

Interconnection process and documents →
Ketchikan Public UtilitiesState guidance

Municipal utility · 6,608 residential customers · Alaska

Interconnection process and documents →
AP&T (Alaska Power Company)Process verified

Investor-owned utility · 5,798 residential customers · Alaska

Applications: PDF + mail – Application Net Metering Facility Not Greater than 25 kW (tariff Appendix, TA822-2) via local AP&T office

Interconnection process and documents →
Kodiak Electric Association Inc.State rule applies

Electric cooperative · 4,676 residential customers · Alaska

Interconnection process and documents →
Kotzebue Electric Association Inc.State rule applies

Electric cooperative · 1,217 residential customers · Alaska

Interconnection process and documents →
City & Borough of SitkaState guidance

Municipal utility · 5,800 customers · Alaska

Interconnection process and documents →
Copper Valley Electric Association, Inc.State rule applies

Electric cooperative · 4,055 customers · Alaska

Interconnection process and documents →

Export compensation among the researched Alaska utilities: Avoided cost, NEM. Rules differ by utility – see each utility page.

Alaska interconnection rule

Commission

Regulatory Commission of Alaska (RCA)

Interconnection rule

3 AAC 50.900-50.949 (Net Metering Standards), interconnection in 3 AAC 50.940 – Net Metering Standards - Interconnection of eligible consumer generation systems · source

Applies to

Electric utilities subject to RCA economic regulation (e.g. Chugach Electric, MEA, GVEA, HEA, Alaska Electric Light & Power, AVEC), except independent systems with <5,000,000 kWh prior-year retail sales, 100%-renewable independent systems, or distribution portions exempted for stability (3 AAC 50.900(b)).

Application form

Utility-specific interconnection application of no more than two pages, in utility interconnection tariff filed with RCA (3 AAC 50.940(a)).

Fees

No extra standby, capacity, interconnection or other net-metering fees unless commission approves (3 AAC 50.930); disconnect switch cost may be charged per 50.940.

Insurance

Utility tariff may require liability insurance only if coverage is readily available at reasonable cost to the consumer (3 AAC 50.940(a)).

External disconnect

Tariff must address external disconnect switch unless utility finds it unnecessary; consumer may choose switch at utility-designated accessible location or agreement allowing utility to disconnect generation and load. Switch+wiring cost chargeable if within 5 ft of meter base/at main structure; elsewhere consumer pays switch, utility pays wiring (3 AAC 50.940(a)).

Export compensation

NEM – 3 AAC 50.900-50.949
Monthly netting; net excess credited at utility's non-firm power rate (avoided-cost type), credits never expire (3 AAC 50.930). IEEE 1547 / UL 1741 may be used as technical standards.

Not bound by the rule

Electric cooperatives under RCA economic regulation are covered. Municipal utilities and utilities exempt from RCA economic regulation (AS 42.05) are not bound and set their own policies.

LevelUp toCriteria / review / fee
Net metering interconnection (single process)25 kWEligible renewable consumer generation <=25 kW nameplate per premises, consumer-owned or leased (3 AAC 50.920) · No standby/capacity/interconnection/other net-metering fees unless RCA approves (3 AAC 50.930)

All 66 utilities in Alaska

Residential customers in Alaska per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.