Alaska interconnection applications
66 electric utilities serve Alaska (EIA-861, 2025): 19 electric cooperatives, 14 investor-owned utilitys, 30 municipal utilitys, 3 public power districts. Together they serve 275,855 residential customers; 3,005 residential customers were on net metering at year-end 2025.
Largest utilities in Alaska
Electric cooperative · 97,742 residential customers · Alaska
Applications: PDF + email – Engineering Request form ('Customer Generation') + emailed application link
Interconnection process and documents →Electric cooperative · 65,371 residential customers · Alaska
Applications: PDF + email – Net Metering Interconnection Application + Agreement (PDF) to NetMetering@mea.coop or any MEA office
Interconnection process and documents →Electric cooperative · 40,931 residential customers · Alaska
Interconnection process and documents →Electric cooperative · 30,143 residential customers · Alaska
Interconnection process and documents →Investor-owned utility · 15,516 residential customers · Alaska
Applications: PDF + mail – Written application to AEL&P (tariff Rule 6.13; no published form)
Interconnection process and documents →Electric cooperative · 7,853 residential customers · Alaska
Interconnection process and documents →Municipal utility · 6,608 residential customers · Alaska
Interconnection process and documents →Investor-owned utility · 5,798 residential customers · Alaska
Applications: PDF + mail – Application Net Metering Facility Not Greater than 25 kW (tariff Appendix, TA822-2) via local AP&T office
Interconnection process and documents →Electric cooperative · 4,676 residential customers · Alaska
Interconnection process and documents →Electric cooperative · 1,217 residential customers · Alaska
Interconnection process and documents →Municipal utility · 5,800 customers · Alaska
Interconnection process and documents →Electric cooperative · 4,055 customers · Alaska
Interconnection process and documents →Export compensation among the researched Alaska utilities: Avoided cost, NEM. Rules differ by utility – see each utility page.
Alaska interconnection rule
Regulatory Commission of Alaska (RCA)
Interconnection rule3 AAC 50.900-50.949 (Net Metering Standards), interconnection in 3 AAC 50.940 – Net Metering Standards - Interconnection of eligible consumer generation systems · source
Applies toElectric utilities subject to RCA economic regulation (e.g. Chugach Electric, MEA, GVEA, HEA, Alaska Electric Light & Power, AVEC), except independent systems with <5,000,000 kWh prior-year retail sales, 100%-renewable independent systems, or distribution portions exempted for stability (3 AAC 50.900(b)).
Application formUtility-specific interconnection application of no more than two pages, in utility interconnection tariff filed with RCA (3 AAC 50.940(a)).
FeesNo extra standby, capacity, interconnection or other net-metering fees unless commission approves (3 AAC 50.930); disconnect switch cost may be charged per 50.940.
InsuranceUtility tariff may require liability insurance only if coverage is readily available at reasonable cost to the consumer (3 AAC 50.940(a)).
External disconnectTariff must address external disconnect switch unless utility finds it unnecessary; consumer may choose switch at utility-designated accessible location or agreement allowing utility to disconnect generation and load. Switch+wiring cost chargeable if within 5 ft of meter base/at main structure; elsewhere consumer pays switch, utility pays wiring (3 AAC 50.940(a)).
Export compensationNEM – 3 AAC 50.900-50.949
Monthly netting; net excess credited at utility's non-firm power rate (avoided-cost type), credits never expire (3 AAC 50.930). IEEE 1547 / UL 1741 may be used as technical standards.
Electric cooperatives under RCA economic regulation are covered. Municipal utilities and utilities exempt from RCA economic regulation (AS 42.05) are not bound and set their own policies.
| Level | Up to | Criteria / review / fee |
|---|---|---|
| Net metering interconnection (single process) | 25 kW | Eligible renewable consumer generation <=25 kW nameplate per premises, consumer-owned or leased (3 AAC 50.920) · No standby/capacity/interconnection/other net-metering fees unless RCA approves (3 AAC 50.930) |
- 3 AAC 50 Art. 3 Net Metering Standards (LII): https://www.law.cornell.edu/regulations/alaska/title-3/part-7/chapter-50/article-3 (retrieved 2026-11-13)
- 3 AAC 50.900: https://www.law.cornell.edu/regulations/alaska/3-AAC-50.900 (retrieved 2026-11-13)
- 3 AAC 50.940: https://www.law.cornell.edu/regulations/alaska/3-AAC-50.940 (retrieved 2026-11-13)
- 3 AAC 50.930: https://www.law.cornell.edu/regulations/alaska/3-AAC-50.930 (retrieved 2026-11-13)
All 66 utilities in Alaska
- Chugach Electric97,742
- MEA65,371
- Golden Valley Electric Association Inc.40,931
- Homer Electric Association Inc.30,143
- AEL&P15,516
- Alaska Village Electric Cooperative, Inc.7,853
- Ketchikan Public Utilities6,608
- AP&T (Alaska Power Company)5,798
- Kodiak Electric Association Inc.4,676
- Kotzebue Electric Association Inc.1,217
- City & Borough of Sitka0
- Copper Valley Electric Association, Inc.0
- City of Seward0
- Petersburg Borough0
- Nome Joint Utility Systems0
- Barrow Utils & Electric Cooperative, Inc.0
- City of Wrangell0
- Cordova Electric Cooperative, Inc.0
- Nushagak Electric Cooperative, Inc.0
- Inside Passage Electric Cooperative, Inc.0
- North Slope Borough Power & Light (AK)0
- Naknek Electric Association, Inc.0
- City of Unalaska0
- Metlakatla Power & Light0
- Galena Electric Utility0
- Unalakleet Valley Electric Cooperative0
- Gwitchyaa Zhee Utility Company0
- City of King Cove0
- I-N-N Electric Cooperative, Inc.0
- Akiachak Native Community Electric0
- McGrath Light & Power Company0
- Kuiggluum Kallugvia0
- City of Saint Paul0
- Aniak Light & Power Co Inc.0
- Middle Kuskokwim Electric Cooperative Inc.0
- City of Tenakee Springs0
- TDX North Slope Generating Company0
- Tanana Power Co Inc.0
- Tuntutuliak Comm Services Association0
- Napakiak Ircinraq Power Company0
- Gold Country Energy0
- City of Chefornak0
- G & K, Inc.0
- TDX Manley Generating0
- City of Ouzinkie0
- City of White Mountain0
- Atmautluak Tribal Utilities0
- Pelican Utility0
- Kokhanok Village Council0
- City of Chignik0
- Chitina Electric Inc.0
- City of Elfin Cove0
- City of Akutan0
- Ipnatchiaq Electric Company0
- City of Larsen Bay0
- Tatitlek Electric Utility0
- Igiugig Electric Company0
- Nelson Lagoon Electric Cooperative Inc.0
- Hughes Power & Light Company0
- Pedro Bay Village Council0
- Birch Creek Village Electric Utility0
- Kwig Power Company0
- Native Village of Perryville0
- Manokotak Power Company0
- City of Atka0
- City of Egegik0
Residential customers in Alaska per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.