Oregon interconnection applications

43 electric utilities serve Oregon (EIA-861, 2025): 3 investor-owned utilitys, 12 municipal utilitys, 6 public power districts, 20 electric cooperatives, 2 federal power agencys. Together they serve 1,822,483 residential customers; 61,540 residential customers were on net metering at year-end 2025.

Largest utilities in Oregon

PGE (Portland General Electric)Process verified

Investor-owned utility · 840,457 residential customers · Oregon

Applications: PowerClerk – PGE PowerClerk

Interconnection process and documents →
Rocky Mountain Power (UT, ID, WY) / Pacific Power (OR, WA, CA)Process verified

Investor-owned utility · 1,867,246 residential customers · Oregon

Applications: PowerClerk – PacifiCorp Net Metering / Customer Generation PowerClerk (all six states)

Interconnection process and documents →
City of EugeneState guidance

Municipal utility · 90,395 residential customers · Oregon

Interconnection process and documents →
Central Lincoln People's Ut DtState guidance

Public power district · 36,113 residential customers · Oregon

Interconnection process and documents →
Central Electric Cooperative Inc.State guidance

Electric cooperative · 35,385 residential customers · Oregon

Interconnection process and documents →
City of SpringfieldState guidance

Municipal utility · 30,212 residential customers · Oregon

Interconnection process and documents →
Oregon Trail El Cons Cooperative, Inc.State guidance

Electric cooperative · 25,995 residential customers · Oregon

Interconnection process and documents →
Tillamook Peoples Utility DistrictState guidance

Public power district · 20,263 residential customers · Oregon

Interconnection process and documents →
Emerald People's Utility DistrictState guidance

Public power district · 19,946 residential customers · Oregon

Interconnection process and documents →
Consumers Power, Inc.State guidance

Electric cooperative · 18,921 residential customers · Oregon

Interconnection process and documents →
Midstate Electric Cooperative, Inc.State guidance

Electric cooperative · 18,875 residential customers · Oregon

Interconnection process and documents →
Salem ElectricState guidance

Electric cooperative · 18,499 residential customers · Oregon

Interconnection process and documents →

Export compensation among the researched Oregon utilities: NEM, Net billing. Rules differ by utility – see each utility page.

Oregon interconnection rule

Commission

Public Utility Commission of Oregon

Interconnection rule

OAR 860-039 (Net Metering Rules, incl. net metering interconnection review); OAR 860-082 (Small Generator Interconnection, <=10 MW, non-net-metered) – Net Metering Rules / Small Generator Interconnection Rules · source

Applies to

Public utilities regulated by the OPUC (PGE, PacifiCorp, Idaho Power in Oregon). Not PUDs, municipal utilities or cooperatives, which follow ORS 757.300 directly with terms set by their governing bodies.

Application form

Standard application form provided by the public utility and posted on its website (content prescribed by OAR 860-039-0025); executed standard interconnection agreement may be submitted with the application

Timelines

Completeness notice within 3 business days (applicant has 10 business days to cure); Tier 1 screening 10 business days, deemed approved after 20 business days; Tier 2 decision 15 business days; signed agreement >=10 business days before operation (Tier 2/4); Tier 4 inspection within 15 business days of installation notice; customer notifies utility >=5 business days before operation (Tier 1).

Fees

Tier 1: none. Tier 2: <=$50 + $1/kW. Tier 4: <=$100 + $2/kW plus study costs; engineering capped at $100/h (CPI-adjusted each January). Minor system modifications at applicant cost.

Insurance

Utility may not require additional liability insurance or naming the utility as additional insured for compliant net metering facilities (OAR 860-039-0080; ORS 757.300(4)(c)).

External disconnect

Lockable, load-break, visibly indicating manual disconnect within 10 ft of the meter required, but utility may not require it for inverter-based systems on services <=600 V up to 7.2 kW (240 V 1-ph), 10.5 kW (120/208 V 3-ph), 12.5 kW (120/240 V 3-ph), 25 kW (277/480 V 3-ph) (OAR 860-039-0015).

Export compensation

NEM – ORS 757.300; OAR 860-039
Public utilities: residential <=25 kW, non-residential <=2 MW. Monthly kWh credits carry forward; unused credits at end of annual cycle go to low-income assistance programs (valued at avoided cost), not paid to customer. Certification to IEEE 1547 and UL 1741 SB required for Tier 1/2.

Not bound by the rule

ORS 757.300 also applies to PUDs, municipal utilities and electric cooperatives: net metering required for systems <=25 kW; governing body sets terms (annual excess credit use, additional safety/testing requirements) after public notice; may not require extra liability insurance or tests for code-compliant systems; may not cap below 0.5% of historic single-hour peak.

LevelUp toCriteria / review / fee
Tier 125 kWinverter-based; generation capacity <=50 kW and export capacity <=25 kW; meets OAR 860-082-0045(2) screens · completeness 3 business days; screening result 10 business days after complete; deemed approved if no notice within 20 business days · no application or other fee
Tier 22000 kW<=2 MW, not Tier 1; OAR 860-082-0050(2) screens · completeness 3 business days; determination 15 business days after complete; agreement 3 business days later · up to $50 + $1/kW; engineering for additional review <=$100/h (CPI-adjusted)
Tier 42000 kW<=2 MW not qualifying for/failing Tier 1-2; impact/facilities studies · study agreement 7 business days after complete; impact study 30 calendar days after signed agreement · up to $100 + $2/kW plus actual study time (<=$100/h)

All 43 utilities in Oregon

Residential customers in Oregon per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited