Home › Utilities › Oregon › Northern Wasco County PUD

Public power district

Northern Wasco County PUD interconnection application

Northern Wasco County PUD is a public power district serving 9,773 residential customers in Oregon (EIA-861, 2025). Gridpol files Northern Wasco County PUD interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Oregon’s commission rule (OAR 860-039 (Net Metering Rules, incl. net metering interconnection review); OAR 860-082 (Small Generator Interconnection, <=10 MW, non-net-metered)) does not bind public power districts; Northern Wasco County PUD sets its own interconnection policy. We confirm its form on the first project. ORS 757.300 also applies to PUDs, municipal utilities and electric cooperatives: net metering required for systems <=25 kW; governing body sets terms (annual excess credit use, additional safety/testing requirements) after public notice; may not require extra liability insurance or tests for code-compliant systems; may not cap below 0.5% of historic single-hour peak.

Northern Wasco County PUD at a glance

Utility

Northern Wasco County PUD

Type

Public power district

EIA utility ID

13788

Residential customers

9,773 (EIA-861, 2025)

Net-metered residential customers

34 (EIA-861, 2025)

Service territory

1 county in Oregon

Documents Northern Wasco County PUD asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for Northern Wasco County PUD. We confirm Northern Wasco County PUD’s exact list on the first project.

Oregon interconnection rule

Commission

Public Utility Commission of Oregon

Interconnection rule

OAR 860-039 (Net Metering Rules, incl. net metering interconnection review); OAR 860-082 (Small Generator Interconnection, <=10 MW, non-net-metered) – Net Metering Rules / Small Generator Interconnection Rules · source

Applies to

Public utilities regulated by the OPUC (PGE, PacifiCorp, Idaho Power in Oregon). Not PUDs, municipal utilities or cooperatives, which follow ORS 757.300 directly with terms set by their governing bodies.

Application form

Standard application form provided by the public utility and posted on its website (content prescribed by OAR 860-039-0025); executed standard interconnection agreement may be submitted with the application

Timelines

Completeness notice within 3 business days (applicant has 10 business days to cure); Tier 1 screening 10 business days, deemed approved after 20 business days; Tier 2 decision 15 business days; signed agreement >=10 business days before operation (Tier 2/4); Tier 4 inspection within 15 business days of installation notice; customer notifies utility >=5 business days before operation (Tier 1).

Fees

Tier 1: none. Tier 2: <=$50 + $1/kW. Tier 4: <=$100 + $2/kW plus study costs; engineering capped at $100/h (CPI-adjusted each January). Minor system modifications at applicant cost.

Insurance

Utility may not require additional liability insurance or naming the utility as additional insured for compliant net metering facilities (OAR 860-039-0080; ORS 757.300(4)(c)).

External disconnect

Lockable, load-break, visibly indicating manual disconnect within 10 ft of the meter required, but utility may not require it for inverter-based systems on services <=600 V up to 7.2 kW (240 V 1-ph), 10.5 kW (120/208 V 3-ph), 12.5 kW (120/240 V 3-ph), 25 kW (277/480 V 3-ph) (OAR 860-039-0015).

Export compensation

NEM – ORS 757.300; OAR 860-039
Public utilities: residential <=25 kW, non-residential <=2 MW. Monthly kWh credits carry forward; unused credits at end of annual cycle go to low-income assistance programs (valued at avoided cost), not paid to customer. Certification to IEEE 1547 and UL 1741 SB required for Tier 1/2.

Not bound by the rule

ORS 757.300 also applies to PUDs, municipal utilities and electric cooperatives: net metering required for systems <=25 kW; governing body sets terms (annual excess credit use, additional safety/testing requirements) after public notice; may not require extra liability insurance or tests for code-compliant systems; may not cap below 0.5% of historic single-hour peak.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.