Home › Utilities › Ohio › AEP Ohio

Investor-owned utility

AEP Ohio interconnection application

AEP Ohio is an investor-owned utility serving 1,348,588 residential customers in Ohio (EIA-861, 2025). Applications: PowerClerk (AEP PowerClerk). Gridpol files AEP Ohio interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from AEP Ohio’s official sources (see below). Official timelines and current NEMS credit details not confirmed.

AEP Ohio at a glance

Utility

Ohio Power Co (American Electric Power)

Type

Investor-owned utility

EIA utility ID

14006

Residential customers

1,348,588 (EIA-861, 2025)

Net-metered residential customers

13,980 (EIA-861, 2025)

Service territory

53 counties in Ohio

How to apply

PowerClerk – AEP PowerClerk · official link

Who submits

Register a PowerClerk account (installer or customer). Customer name/service address must exactly match the AEP Ohio account; fee invoice goes to party named as responsible in the application.

Export compensation

NEM – Net Energy Metering Service (NEMS)
Verify current credit method in tariff.

Review time (official)

Per Ohio rules OAC 4901:1-22; not stated on AEP Ohio page.

Documents AEP Ohio asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Site plan / site layoutHouse/buildings, generator, AEP meter and AC disconnect locations, customer name/address, installer, date, north arrow, streets/poles/transformers Gridpol prepares this.
  • Single-line diagram (one-line)Legible, title block, all equipment meter-to-generator incl. wire sizes, ratings; note 3-phase transformers or state none Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetUL 1741 / IEEE 1547 compliance documentation
  • Battery spec sheet (when applicable)Spec sheets for battery systems if installed
  • Proof of insuranceProof of insurance; self-insured entities may attest
  • Final inspection sign-offLocal AHJ inspection/permits; AEP does field verification
  • Interconnection agreementPrepared by AEP Ohio after approval

How the AEP Ohio process runs

  1. Register PowerClerk account.
  2. Optional pre-application report ($300).
  3. Submit application with site diagram, one-line, spec sheets, insurance; pay invoiced fee.
  4. Approval; AEP prepares Interconnection Service Agreement.
  5. Install; AHJ inspection/permits.
  6. AEP field verification; meter change fee paid if applicable; bi-directional meter installed.
  7. Permission to Operate notification - do not operate before.

Fees

FeeApplies toNote
$50Inverter-based, export capacity <=25 kW
$100 + $1/kW export capacityLevel 2 and 3
$300Optional pre-application report per location
~$319 residential / $195 non-residentialDual-register meter change for NEMS, actual cost, if needed

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 125 kWinverter-based, certified

Ohio rule 4901:1-10-28 net metering sizing (about 120% of customer requirements).

Storage, EV and stamps

Battery storage

Energy storage operating in parallel must be reviewed/approved; battery spec sheets required.

PE stamp

One-line diagram must be signed and stamped by a licensed PE if the generating system is greater than 50 kW. – PE-stamped drawings are not included in Gridpol.

Common issues the utility lists

  • Customer name/service address not matching AEP account
  • Equipment data in application not matching spec sheets/one-line/site diagram or wrong units
  • Meter collar devices not approved
  • Supply-side connection outside main panel without AHJ documentation
  • Generator connection inside meter base unless UL-approved meter/load-center combo
  • Fee pre-payments without invoice number cause delay

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited