Investor-owned utilityDuke Energy interconnection application
Duke Energy is an investor-owned utility serving 700,265 residential customers in Ohio (EIA-861, 2025). Gridpol files Duke Energy interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. Re-checked 2026-11-13: duke-energy.com 403, codes.ohio.gov refused connection, archive.org not reachable; no official Duke Energy Ohio interconnection page, form or Rider NM sheet could be read (search results only showed Duke Energy Kentucky material). Verify on first project: Duke Ohio submission portal/email, application fee, document checklist, Rider NM terms and steps; Ohio Level 1 timelines per OAC 4901:1-22.
Duke Energy at a glance
Duke Energy Ohio Inc (Duke Energy)
TypeInvestor-owned utility
EIA utility ID3542
Residential customers700,265 (EIA-861, 2025)
Net-metered residential customers6,193 (EIA-861, 2025)
Service territory23 counties in Ohio
Who submitsCustomer/installer; Duke Renewables Service Center (CustomerOwnedGeneration@duke-energy.com, 866-233-2290). Signed interconnection agreement required before net metering; CRES suppliers not required to offer net metering.
Export compensationNEM – Rider NM (Ohio net metering)
Duke Ohio TIIR filing pending in PUCO Docket 26-873-EL-TIR.
Per OAC 4901:1-22 (Ohio interconnection rules).
Documents Duke Energy asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- Inverter spec sheetUL 1741 / IEEE 1547
- Interconnection agreementUtility agreement signed by the customer, usually after review.
- Net metering / net billing agreementSigned by the customer where the utility requires a separate agreement.
How the Duke Energy process runs
- Submit interconnection application with drawings.
- Review per OAC 4901:1-22.
- Sign interconnection agreement.
- Install, inspection, meter, net metering.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Level 1 | 25 kW | Ohio OAC 4901:1-22 simplified, inverter-based certified |
Ohio net metering sizing per OAC 4901:1-10-28 (not above ~120% of requirements). Fees per Duke tariff (OAC 4901:1-22-05).
Sources
- Duke Energy Ohio Customer Choice FAQ: https://www.duke-energy.com/home/products/ohio-customer-choice?jur=OH01 (retrieved 2026-11-13)
- Duke Energy regulatory information (Docket 26-873-EL-TIR): https://www.duke-energy.com/investor-relations/regulatory-information (retrieved 2026-11-13)
- OAC 4901:1-22-05: https://codes.ohio.gov/assets/laws/administrative-code/authenticated/4901/1/22/4901$1-22-05_20260720.pdf (retrieved 2026-11-13)
Ohio interconnection rule
Public Utilities Commission of Ohio (PUCO)
Interconnection ruleOhio Adm.Code Chapter 4901:1-22 (Interconnection Services), rules 4901:1-22-01 to -10; R.C. 4928.11, 4928.67 – Interconnection Services · source
Applies toElectric distribution utilities (EDUs: AEP Ohio, Duke Energy Ohio, AES Ohio, FirstEnergy's Ohio Edison/CEI/Toledo Edison), which must file uniform interconnection service tariffs (4901:1-22-02). Municipal utilities and cooperatives are not PUCO-regulated EDUs.
Application formUniform statewide approach: 'short form' application for DER <= 25 kW with IEEE 1547/UL 1741 certified equipment, standard application otherwise, filed with the EDU (4901:1-22-05); standard interconnection agreement per 4901:1-22-10.
TimelinesReceipt/completeness notice within 10 business days (4901:1-22-04); Level 1 review 15 BD, Level 2 20 BD after complete application; interconnection agreement within 5 BD of approval; interconnection within 10 BD after required upgrades complete. Pre-application report $300, within 10 BD.
FeesLevel 1 <= $50 (waivable); Level 2 <= $50 + $1/kW (+ $2,500 supplemental review deposit if elected); Level 3 <= $100 + $2/kW + actual study costs; pre-application report $300.
InsuranceEDU may not require liability insurance beyond proof of insurance or another financial instrument covering the applicant's responsibilities under the tariff, and may not require a particular agent/broker (4901:1-22-10(E)). No dollar amounts specified.
External disconnectRequired: DER must have a disconnect switch outside the equipment package, accessible to and lockable by EDU personnel, clearly labeled as DER disconnect, provided and paid for by the applicant (4901:1-22-05).
Export compensationNEM – R.C. 4928.67; Ohio Adm.Code 4901:1-10-28 (eff. Apr. 8, 2024)
No fixed kW cap: system may not exceed 120% of customer's requirements (3-year average). Monthly excess credited at the energy component of the EDU's standard service offer, carried forward; no cash-out required. EDUs must offer standard and hospital net metering tariffs; CRES providers optional.
Municipal electric systems and rural electric cooperatives are not EDUs under PUCO jurisdiction; they set their own interconnection and net metering policies.
- OAC 4901:1-22-02 Scope and application: https://www.law.cornell.edu/regulations/ohio/Ohio-Admin-Code-4901-1-22-02 (retrieved 2026-11-13)
- OAC 4901:1-22-04 General provisions: https://www.law.cornell.edu/regulations/ohio/Ohio-Admin-Code-4901-1-22-04 (retrieved 2026-11-13)
- OAC 4901:1-22-05 Application requirements: https://www.law.cornell.edu/regulations/ohio/Ohio-Admin-Code-4901-1-22-05 (retrieved 2026-11-13)
- OAC 4901:1-22-06 Level 1 review: https://www.law.cornell.edu/regulations/ohio/Ohio-Admin-Code-4901-1-22-06 (retrieved 2026-11-13)
- OAC 4901:1-22-07 Level 2 review: https://www.law.cornell.edu/regulations/ohio/Ohio-Admin-Code-4901-1-22-07 (retrieved 2026-11-13)
- OAC 4901:1-22-08 Level 3 review: https://www.law.cornell.edu/regulations/ohio/Ohio-Admin-Code-4901-1-22-08 (retrieved 2026-11-13)
- OAC 4901:1-22-10 Interconnection agreements: https://www.law.cornell.edu/regulations/ohio/Ohio-Admin-Code-4901-1-22-10 (retrieved 2026-11-13)
- OAC 4901:1-10-28 Net metering: https://www.law.cornell.edu/regulations/ohio/Ohio-Admin-Code-4901-1-10-28 (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.