Investor-owned utilityPNM interconnection application
PNM is an investor-owned utility serving 496,914 residential customers in New Mexico (EIA-861, 2025). Applications: PowerClerk (NMPRC/PNM PowerClerk portal for rooftop solar applications (separate pnmferc.powerclerk.com instance is for FERC pre-application/informal requests, not the rooftop program)). Gridpol files PNM interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. pnm.com refuses connections from our server; facts from search-index excerpts of official PNM pages. Verify on first project: exact PowerClerk URL for rooftop program, current fee ($50 vs $150), storage rules, NM net metering credit terms.
PNM at a glance
Public Service Co of NM (TXNM Energy)
TypeInvestor-owned utility
EIA utility ID15473
Residential customers496,914 (EIA-861, 2025)
Net-metered residential customers47,762 (EIA-861, 2025)
Service territory19 counties in New Mexico
How to applyPowerClerk – NMPRC/PNM PowerClerk portal for rooftop solar applications (separate pnmferc.powerclerk.com instance is for FERC pre-application/informal requests, not the rooftop program)
Who submitsCustomer (interconnection customer) must sign the application; contractor cannot sign for the customer. Customer must be PNM electric customer and own the home/building. Contractor may arrange inspections.
Export compensationNEM – Net metering (17.9.570 NMAC) with Customer Solar Energy Program
Excess credited per NM net metering rule; REC price stated at completeness notice where applicable.
Production meter installed about 10 business days after passed electrical inspection; installation must be completed within 9 months of passing technical screening.
Documents PNM asks for
- Interconnection application formSmall Solar Energy System application (Form No. 79) or Small Interconnection Only Application (Form No. 83); signed by customer Gridpol prepares this.
- Single-line diagram (one-line)One-line diagram showing interconnection (examples include battery backup) Gridpol prepares this.
- Site plan / site layoutSite map Gridpol prepares this.
- Inverter spec sheetSpec sheet with UL 1741 listing; since 2024-03-29 advanced inverters IEEE 1547-2018 required
- Recent electric billCopy of all pages of a recent PNM bill
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Interconnection agreementContract package mailed by PNM, signed and returned; executed IA with written authorization to operate attached
- Final inspection sign-offLocal city/county or State of NM electrical inspection
- Other utility-specific documentLaminated one-line diagram and site map on site; lockable load-break disconnect between inverter output and POI; solar production meter within 5 ft and line-of-sight of billing meter
How the PNM process runs
- Preliminary design; submit signed application package (application, fee, one-line, site map, inverter spec, PNM bill)
- Completeness check and notification
- Technical screening per NM Interconnection Manual; must pass before construction
- Sign and return contract package
- Install within 9 months
- Local/State electrical inspection; inspector notifies PNM
- PNM installs production meter (~10 BD) and performs final interconnection inspection incl. anti-islanding test
- Fully executed Interconnection Agreement with written authorization to operate
Fees
| Fee | Applies to | Note |
|---|---|---|
| $150 | Net-metering-only small application (<=10 kW AC) | Some PNM pages show $50; confirm on current form |
| $50 / $500 | Qualifying facilities <100 kW / >=100 kW (large-facility process) |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Small systems (Customer Solar Energy Program) | 10 kW | AC |
| Large systems | 80000 kW | Separate application/agreement process per NM Interconnection Manual |
NM Interconnection Manual (17.9.568 NMAC) screening.
Storage, EV and stamps
Battery storage
No PNM-specific battery rules found; battery shown on one-line diagram examples. Confirm configuration review with PNM.
Common issues the utility lists
- Application signed by contractor instead of customer
- Inverter not IEEE 1547-2018 advanced inverter / not UL 1741 listed
- Production meter not within 5 ft and line-of-sight of billing meter
Gridpol’s pre-submission check covers these before we file.
Sources
- PNM Application Process: https://www.pnm.com/application-process (retrieved 2026-11-13)
- PNM Applications Small Solar Energy Systems: https://www.pnm.com/applications-information-for-pv (retrieved 2026-11-13)
- PNM Customer Solar Energy Program: Small Systems: https://www.pnm.com/small-systems1 (retrieved 2026-11-13)
- PNM Small Solar application Form No. 79: https://www.pnm.com/documents/396023/396189/solar_sm_app.pdf/e5a09717-cc9d-470b-8546-c46267130589 (retrieved 2026-11-13)
- PNM Technical Requirements: https://www.pnm.com/technical-requirements (retrieved 2026-11-13)
New Mexico interconnection rule
New Mexico Public Regulation Commission (PRC)
Interconnection rule17.9.568 NMAC (Interconnection of Generating Facilities with a Rated Capacity up to and including 10 MW); >10 MW: 17.9.569 NMAC – Interconnection of generating facilities up to 10 MW · source
Applies toEvery electric utility under PRC jurisdiction, including investor-owned utilities (PNM, El Paso Electric, SPS/Xcel) and rural electric cooperatives (17.9.568.2.A); municipal utilities not named.
Application formStandard application per utility with form interconnection agreement signed with the application for simplified process (17.9.568.20.A); net energy metering application.
TimelinesReceipt 3 BD, completeness 10 BD; simplified screens 7 BD; fast track 15 BD; supplemental 20 BD. Customer gives 10 BD notice of start; utility may inspect within 10 BD; PTO normally within 10 BD after required documents (simplified/fast track) (17.9.568.21). Pre-application report $300/$500, 20/30 BD.
FeesApplication (17.9.568.23.A): $150 up to 25 kW; $300 >25-100 kW; $300 + $1/kW >100 kW; non-export $150 (<100 kW) / $300; supplemental review $2,500.
Insurance<=250 kW: general liability insurance only if commission orders it on utility petition showing good cause; >250 kW: utility may require insurance up to $1,000,000 or other evidence of financial responsibility (17.9.568.25.B).
External disconnectVisible-open, lockable, load-break disconnect labeled 'generating facility generation disconnect' required, except systems <=10 kW with certified inverter and self-contained meter that have a utility-accessible AC load-break disconnect (or DC disconnect if no other source) (17.9.568.29.D).
Export compensationNEM – 17.9.570 NMAC (eff. 2022-05-24), 17.9.570.14 and .15
<=10 kW: net metering - excess credited next bill at energy rate or as kWh, carried forward; >10 kW-10 MW: standard metering and billing agreement with net metering option (17.9.570.15). Applies to every PRC-jurisdictional utility incl. coops and munis.
Rural electric cooperatives are bound by 17.9.568 and 17.9.570 (distribution coop service also per own bylaws/tariffs). Municipal utilities are within 17.9.570 scope for QF/net metering; their interconnection coverage under 17.9.568 not stated.
- 17.9.568 NMAC: https://www.srca.nm.gov/parts/title17/17.009.0568.html (retrieved 2026-11-13)
- 17.9.570 NMAC: https://www.srca.nm.gov/parts/title17/17.009.0570.html (retrieved 2026-11-13)
Other utilities in New Mexico
- Xcel Energy (SPS)101,203
- El Paso Electric97,258
- City of Farmington36,031
- Jemez Mountains Electric Cooperative, Inc.28,185
- Kit Carson Electric Cooperative, Inc.26,286
- Continental Divide El Cooperative Inc.20,474
- Central New Mexico El Cooperative, Inc.19,323
- Otero County Electric Cooperative Inc.16,517
- Farmers Electric Cooperative, Inc.10,310
- Navajo Tribal Utility Authority9,768
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.