Home › Utilities › New Mexico › Central New Mexico El Cooperative, Inc.
Electric cooperativeCentral New Mexico El Cooperative, Inc. interconnection application
Central New Mexico El Cooperative, Inc. is an electric cooperative serving 19,323 residential customers in New Mexico (EIA-861, 2025). Gridpol files Central New Mexico El Cooperative, Inc. interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
New Mexico’s interconnection rule (17.9.568 NMAC (Interconnection of Generating Facilities with a Rated Capacity up to and including 10 MW); >10 MW: 17.9.569 NMAC) applies to Central New Mexico El Cooperative, Inc.. Levels, timelines and documents below come from that rule; Central New Mexico El Cooperative, Inc.’s own form and portal are confirmed on the first project.
Central New Mexico El Cooperative, Inc. at a glance
Central New Mexico El Coop, Inc
TypeElectric cooperative
EIA utility ID3273
Residential customers19,323 (EIA-861, 2025)
Net-metered residential customers821 (EIA-861, 2025)
Service territory11 counties in New Mexico
Wholesale supplier / associationBasin Electric Power Cooperative
Tri-State Generation and Transmission Association, Inc. · Board Policy for Member System Distributed Resource (Board Policy 115, FERC rate schedule) and BYOR Program
Documents Central New Mexico El Cooperative, Inc. asks for
- Interconnection application formRequired by the state rule Gridpol prepares this.
- Net metering / net billing agreementRequired by the state rule
- Interconnection agreementRequired by the state rule
- Customer signatureRequired by the state rule
- Final inspection sign-offRequired by the state rule
- Inverter spec sheetRequired by the state rule
- Single-line diagram (one-line)Required by the state rule Gridpol prepares this.
Documents required by the New Mexico rule. Central New Mexico El Cooperative, Inc. may ask for more on its own form; we confirm on the first project.
New Mexico interconnection rule
New Mexico Public Regulation Commission (PRC)
Interconnection rule17.9.568 NMAC (Interconnection of Generating Facilities with a Rated Capacity up to and including 10 MW); >10 MW: 17.9.569 NMAC – Interconnection of generating facilities up to 10 MW · source
Applies toEvery electric utility under PRC jurisdiction, including investor-owned utilities (PNM, El Paso Electric, SPS/Xcel) and rural electric cooperatives (17.9.568.2.A); municipal utilities not named.
Application formStandard application per utility with form interconnection agreement signed with the application for simplified process (17.9.568.20.A); net energy metering application.
TimelinesReceipt 3 BD, completeness 10 BD; simplified screens 7 BD; fast track 15 BD; supplemental 20 BD. Customer gives 10 BD notice of start; utility may inspect within 10 BD; PTO normally within 10 BD after required documents (simplified/fast track) (17.9.568.21). Pre-application report $300/$500, 20/30 BD.
FeesApplication (17.9.568.23.A): $150 up to 25 kW; $300 >25-100 kW; $300 + $1/kW >100 kW; non-export $150 (<100 kW) / $300; supplemental review $2,500.
Insurance<=250 kW: general liability insurance only if commission orders it on utility petition showing good cause; >250 kW: utility may require insurance up to $1,000,000 or other evidence of financial responsibility (17.9.568.25.B).
External disconnectVisible-open, lockable, load-break disconnect labeled 'generating facility generation disconnect' required, except systems <=10 kW with certified inverter and self-contained meter that have a utility-accessible AC load-break disconnect (or DC disconnect if no other source) (17.9.568.29.D).
Export compensationNEM – 17.9.570 NMAC (eff. 2022-05-24), 17.9.570.14 and .15
<=10 kW: net metering - excess credited next bill at energy rate or as kWh, carried forward; >10 kW-10 MW: standard metering and billing agreement with net metering option (17.9.570.15). Applies to every PRC-jurisdictional utility incl. coops and munis.
Rural electric cooperatives are bound by 17.9.568 and 17.9.570 (distribution coop service also per own bylaws/tariffs). Municipal utilities are within 17.9.570 scope for QF/net metering; their interconnection coverage under 17.9.568 not stated.
- 17.9.568 NMAC: https://www.srca.nm.gov/parts/title17/17.009.0568.html (retrieved 2026-11-13)
- 17.9.570 NMAC: https://www.srca.nm.gov/parts/title17/17.009.0570.html (retrieved 2026-11-13)
Other utilities in New Mexico
- PNM496,914
- Xcel Energy (SPS)101,203
- El Paso Electric97,258
- City of Farmington36,031
- Jemez Mountains Electric Cooperative, Inc.28,185
- Kit Carson Electric Cooperative, Inc.26,286
- Continental Divide El Cooperative Inc.20,474
- Otero County Electric Cooperative Inc.16,517
- Farmers Electric Cooperative, Inc.10,310
- Navajo Tribal Utility Authority9,768
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.