Home › Utilities › New Mexico › Mora-San Miguel Electric Cooperative
Electric cooperativeMora-San Miguel Electric Cooperative interconnection application
Mora-San Miguel Electric Cooperative is an electric cooperative serving 11,604 customers in New Mexico (EIA-861, 2025). Gridpol files Mora-San Miguel Electric Cooperative interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
New Mexico’s interconnection rule (17.9.568 NMAC (Interconnection of Generating Facilities with a Rated Capacity up to and including 10 MW); >10 MW: 17.9.569 NMAC) applies to Mora-San Miguel Electric Cooperative. Levels, timelines and documents below come from that rule; Mora-San Miguel Electric Cooperative’s own form and portal are confirmed on the first project.
Mora-San Miguel Electric Cooperative at a glance
Mora-San Miguel Elec Coop
TypeElectric cooperative
EIA utility ID12901
Customers11,604 (EIA-861, 2025, short form: all customer classes)
Net-metered residential customersnone reported
Service territory4 counties in New Mexico
Wholesale supplier / associationBasin Electric Power Cooperative
Tri-State Generation and Transmission Association, Inc. · Board Policy for Member System Distributed Resource (Board Policy 115, FERC rate schedule) and BYOR Program
Documents Mora-San Miguel Electric Cooperative asks for
- Interconnection application formRequired by the state rule Gridpol prepares this.
- Net metering / net billing agreementRequired by the state rule
- Interconnection agreementRequired by the state rule
- Customer signatureRequired by the state rule
- Final inspection sign-offRequired by the state rule
- Inverter spec sheetRequired by the state rule
- Single-line diagram (one-line)Required by the state rule Gridpol prepares this.
Documents required by the New Mexico rule. Mora-San Miguel Electric Cooperative may ask for more on its own form; we confirm on the first project.
New Mexico interconnection rule
New Mexico Public Regulation Commission (PRC)
Interconnection rule17.9.568 NMAC (Interconnection of Generating Facilities with a Rated Capacity up to and including 10 MW); >10 MW: 17.9.569 NMAC – Interconnection of generating facilities up to 10 MW · source
Applies toEvery electric utility under PRC jurisdiction, including investor-owned utilities (PNM, El Paso Electric, SPS/Xcel) and rural electric cooperatives (17.9.568.2.A); municipal utilities not named.
Application formStandard application per utility with form interconnection agreement signed with the application for simplified process (17.9.568.20.A); net energy metering application.
TimelinesReceipt 3 BD, completeness 10 BD; simplified screens 7 BD; fast track 15 BD; supplemental 20 BD. Customer gives 10 BD notice of start; utility may inspect within 10 BD; PTO normally within 10 BD after required documents (simplified/fast track) (17.9.568.21). Pre-application report $300/$500, 20/30 BD.
FeesApplication (17.9.568.23.A): $150 up to 25 kW; $300 >25-100 kW; $300 + $1/kW >100 kW; non-export $150 (<100 kW) / $300; supplemental review $2,500.
Insurance<=250 kW: general liability insurance only if commission orders it on utility petition showing good cause; >250 kW: utility may require insurance up to $1,000,000 or other evidence of financial responsibility (17.9.568.25.B).
External disconnectVisible-open, lockable, load-break disconnect labeled 'generating facility generation disconnect' required, except systems <=10 kW with certified inverter and self-contained meter that have a utility-accessible AC load-break disconnect (or DC disconnect if no other source) (17.9.568.29.D).
Export compensationNEM – 17.9.570 NMAC (eff. 2022-05-24), 17.9.570.14 and .15
<=10 kW: net metering - excess credited next bill at energy rate or as kWh, carried forward; >10 kW-10 MW: standard metering and billing agreement with net metering option (17.9.570.15). Applies to every PRC-jurisdictional utility incl. coops and munis.
Rural electric cooperatives are bound by 17.9.568 and 17.9.570 (distribution coop service also per own bylaws/tariffs). Municipal utilities are within 17.9.570 scope for QF/net metering; their interconnection coverage under 17.9.568 not stated.
- 17.9.568 NMAC: https://www.srca.nm.gov/parts/title17/17.009.0568.html (retrieved 2026-11-13)
- 17.9.570 NMAC: https://www.srca.nm.gov/parts/title17/17.009.0570.html (retrieved 2026-11-13)
Other utilities in New Mexico
- PNM496,914
- Xcel Energy (SPS)101,203
- El Paso Electric97,258
- City of Farmington36,031
- Jemez Mountains Electric Cooperative, Inc.28,185
- Kit Carson Electric Cooperative, Inc.26,286
- Continental Divide El Cooperative Inc.20,474
- Central New Mexico El Cooperative, Inc.19,323
- Otero County Electric Cooperative Inc.16,517
- Farmers Electric Cooperative, Inc.10,310
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.