Home › Utilities › Montana › Flathead Electric Cooperative

Electric cooperative

Flathead Electric Cooperative interconnection application

Flathead Electric Cooperative is an electric cooperative serving 64,334 residential customers in Montana (EIA-861, 2025). Applications: PDF + email (Small Generation Interconnection Application + Net Metering Under 50 kW agreement (download from flatheadelectric.com/distributed-energy)). Gridpol files Flathead Electric Cooperative interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Partly researched from official sources. flatheadelectric.com refused connections; facts from search-index excerpts of official pages. Verify on first project: current application form, fee, submission method, battery rules, steps to PTO.

Flathead Electric Cooperative at a glance

Utility

Flathead Electric Coop Inc

Type

Electric cooperative

EIA utility ID

6395

Residential customers

64,334 (EIA-861, 2025)

Net-metered residential customers

278 (EIA-861, 2025)

Service territory

6 counties in Montana

How to apply

PDF + email – Small Generation Interconnection Application + Net Metering Under 50 kW agreement (download from flatheadelectric.com/distributed-energy)

Who submits

Member; contact Distributed Energy Specialist.

Export compensation

NEM – Net metering (under 50 kW)
Billing on NET = import minus export; excess in a full bill cycle banked for future usage; credits do not offset fixed, service or demand charges.

Wholesale supplier / association

Basin Electric Power Cooperative

Documents Flathead Electric Cooperative asks for

  • Interconnection application formSmall Generation Interconnection Application for renewable systems < 50 kW nameplate Gridpol prepares this.
  • Net metering / net billing agreementNet Metering Under 50 kW agreement
  • Final inspection sign-offMontana state electrical permit
  • Other utility-specific documentVisible lockable disconnect; clear labeling on meter base; exposed accessible meter base

Fees

FeeApplies toNote
$250Small generation < 50 kW processing feeFrom Flathead handbook (older PDF); confirm

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Net metering50 kW< 50 kW nameplate
Large> 200 kW nameplate or 50 kW export: Interconnection Generation at least 200 kW Procedure (Appendix B application); may need BPA coordination
Net metering cap50 kW

Sources not fully consistent on thresholds.

Sources

Montana interconnection rule

Commission

Montana Public Service Commission

Interconnection rule

ARM 38.5.8401 - 38.5.8413 (Small Generator Interconnection) – Small Generator Interconnection · source

Applies to

Electric distribution companies (EDCs) subject to PSC regulation (NorthWestern Energy, Montana-Dakota Utilities, Black Hills); not electric cooperatives or municipal utilities

Application form

Utility-specific standard interconnection request form, agreements and fee schedule filed with and approved by the PSC (ARM 38.5.8403/8404)

Timelines

Level 1: completeness 10 business days, screens 15 BD, agreement 5 BD, applicant signs within 30 BD. Level 2: completeness 10 BD, evaluation 20 BD. Applicant gives 20 BD notice of commissioning test; EDC witness test within 10 BD or deemed waived; deficiencies report 5 BD, cure 30 BD (ARM 38.5.8408-8410).

Fees

EDC files fee schedule and study rates with PSC for approval; no deviation without approval (ARM 38.5.8404). No amounts in rule.

Insurance

Not addressed in reviewed rules.

External disconnect

Required: lockable, visible-break isolation device accessible to EDC, owned/maintained by generator owner, between facility and point of interconnection (ARM 38.5.8408(6)).

Export compensation

NEM – MCA 69-8-601 to 69-8-605
Statutory net metering applies to NorthWestern Energy (public utility) only; monthly kWh credit carried forward, unused credit granted to utility at end of customer-chosen 12-month period (69-8-603). 50 kW system cap per DSIRE/legislative primer, not verified in statute text.

Not bound by the rule

Electric cooperatives are exempt from the net metering statute and PSC interconnection rules and set their own policies; MDU largely exempt from the statutory net metering part.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited