McCone Electric Cooperative Inc. interconnection application

McCone Electric Cooperative Inc. is an electric cooperative serving 5,481 customers in Montana (EIA-861, 2025). Gridpol files McCone Electric Cooperative Inc. interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Montana’s commission rule (ARM 38.5.8401 - 38.5.8413 (Small Generator Interconnection)) does not bind electric cooperatives; McCone Electric Cooperative Inc. sets its own interconnection policy. We confirm its form on the first project. Electric cooperatives are exempt from the net metering statute and PSC interconnection rules and set their own policies; MDU largely exempt from the statutory net metering part.

McCone Electric Cooperative Inc. at a glance

Utility

McCone Electric Coop Inc

Type

Electric cooperative

EIA utility ID

11989

Customers

5,481 (EIA-861, 2025, short form: all customer classes)

Net-metered residential customers

none reported

Service territory

9 counties in Montana

Wholesale supplier / association

Basin Electric Power Cooperative

Documents McCone Electric Cooperative Inc. asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for McCone Electric Cooperative Inc.. We confirm McCone Electric Cooperative Inc.’s exact list on the first project.

Montana interconnection rule

Commission

Montana Public Service Commission

Interconnection rule

ARM 38.5.8401 - 38.5.8413 (Small Generator Interconnection) – Small Generator Interconnection · source

Applies to

Electric distribution companies (EDCs) subject to PSC regulation (NorthWestern Energy, Montana-Dakota Utilities, Black Hills); not electric cooperatives or municipal utilities

Application form

Utility-specific standard interconnection request form, agreements and fee schedule filed with and approved by the PSC (ARM 38.5.8403/8404)

Timelines

Level 1: completeness 10 business days, screens 15 BD, agreement 5 BD, applicant signs within 30 BD. Level 2: completeness 10 BD, evaluation 20 BD. Applicant gives 20 BD notice of commissioning test; EDC witness test within 10 BD or deemed waived; deficiencies report 5 BD, cure 30 BD (ARM 38.5.8408-8410).

Fees

EDC files fee schedule and study rates with PSC for approval; no deviation without approval (ARM 38.5.8404). No amounts in rule.

Insurance

Not addressed in reviewed rules.

External disconnect

Required: lockable, visible-break isolation device accessible to EDC, owned/maintained by generator owner, between facility and point of interconnection (ARM 38.5.8408(6)).

Export compensation

NEM – MCA 69-8-601 to 69-8-605
Statutory net metering applies to NorthWestern Energy (public utility) only; monthly kWh credit carried forward, unused credit granted to utility at end of customer-chosen 12-month period (69-8-603). 50 kW system cap per DSIRE/legislative primer, not verified in statute text.

Not bound by the rule

Electric cooperatives are exempt from the net metering statute and PSC interconnection rules and set their own policies; MDU largely exempt from the statutory net metering part.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited