Home › Utilities › Minnesota › MiEnergy Cooperative

Electric cooperative

MiEnergy Cooperative interconnection application

MiEnergy Cooperative is an electric cooperative serving 21,343 residential customers in Iowa, Minnesota (EIA-861, 2025). Gridpol files MiEnergy Cooperative interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Minnesota’s interconnection rule (Minn. Stat. § 216B.1611; MN PUC Orders in Docket E-999/CI-16-521 (Aug. 13, 2018; Apr. 19, 2019) adopting the Minnesota Distributed Energy Resources Interconnection Process (MN DIP), MN DER Interconnection Agreement (MN DIA) and Minnesota Technical Requirements; implemented in each rate-regulated utility's tariff) applies to MiEnergy Cooperative. Levels, timelines and documents below come from that rule; MiEnergy Cooperative’s own form and portal are confirmed on the first project.

MiEnergy Cooperative at a glance

Utility

MiEnergy Cooperative

Type

Electric cooperative

EIA utility ID

19157

Residential customers

21,343 (EIA-861, 2025)

Net-metered residential customers

854 (EIA-861, 2025)

Service territory

6 counties in Iowa, 5 counties in Minnesota

Wholesale supplier / association

Dairyland Power Cooperative

Documents MiEnergy Cooperative asks for

  • Interconnection application formRequired by the state rule Gridpol prepares this.
  • Single-line diagram (one-line)Required by the state rule Gridpol prepares this.
  • Site plan / site layoutRequired by the state rule Gridpol prepares this.
  • UL 1741 / IEEE 1547 certificationRequired by the state rule
  • Interconnection agreementRequired by the state rule
  • Final inspection sign-offRequired by the state rule
  • Other utility-specific documentRequired by the state rule

Documents required by the Minnesota rule. MiEnergy Cooperative may ask for more on its own form; we confirm on the first project.

Minnesota interconnection rule

Commission

Minnesota Public Utilities Commission (MN PUC)

Interconnection rule

Minn. Stat. § 216B.1611; MN PUC Orders in Docket E-999/CI-16-521 (Aug. 13, 2018; Apr. 19, 2019) adopting the Minnesota Distributed Energy Resources Interconnection Process (MN DIP), MN DER Interconnection Agreement (MN DIA) and Minnesota Technical Requirements; implemented in each rate-regulated utility's tariff – Minnesota Distributed Energy Resources Interconnection Process (MN DIP) · source

Applies to

DER <= 10 MW interconnecting to rate-regulated utilities: Xcel Energy (NSP), Minnesota Power, Otter Tail Power, and Dakota Electric Association (rate-regulated cooperative). Other cooperatives and municipal utilities adopt their own processes (MMUA M-MIP for munis; cooperative versions).

Application form

Statewide templates: Attachment 2 Simplified Application Form; Attachment 3 Interconnection Application (Fast Track/Study); Uniform Statewide Contract (Minn. R. ch. 7835) or MN DIA; Certificate of Completion. Utilities file versions with utility-specific information.

Timelines

Simplified: completeness 10 BD (customer 5 BD to cure, utility 5 BD to re-review); screening 20 BD; executable agreement 5 days; customer returns agreement within 30 BD; witness test within 10 BD of Certificate of Completion or deemed waived; permission to operate within 3 BD of inspection/waiver. Fast Track: receipt notice 3 BD, initial review 15 BD after complete.

Fees

MN DIP 1.5.1: Simplified up to $100; Fast Track up to $100 + $1/kW certified, $100 + $2/kW non-certified; Study: down payment up to $1,000 + $2/kW. No additional fees except as specified.

Export compensation

NEM – Minn. Stat. § 216B.164; Minn. R. ch. 7835
Applies to all MN utilities incl. cooperatives and munis. < 40 kW: may elect average retail utility energy rate (coops/munis may charge a cost-justified fixed-cost fee and may use kWh credit expiring at year end). Public utilities: 40 kW-1,000 kW net metered with kWh credit carried forward, annual excess paid at applicable rate (subd. 3a). Uniform statewide contract for <1,000 kW (public utilities) and <40 kW (coops/munis) (subd. 6). Muni/coop boards may act as 'commission' if they adopt implementing rules (subd. 9, 11).

Not bound by the rule

Municipal utilities and cooperatives (except Dakota Electric) are not bound by the MN DIP tariff orders but must adopt interconnection standards under Minn. Stat. § 216B.1611 and follow § 216B.164 for < 40 kW net metering; munis commonly use the MMUA Minnesota Municipal Interconnection Process (M-MIP), cooperatives use their own DER interconnection procedures.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.