Connexus Energy is an electric cooperative serving 136,082 residential customers in Minnesota (EIA-861, 2025). Applications: PDF + email (Email application and all attachments to DER.InterconnectionCoordinator@connexusenergy.com). Gridpol files Connexus Energy interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Connexus Energy’s official sources (see below). Verified 2026-11-13 from archive.org capture of 2025-09-10 (live site blocks us). Application fee amount and timelines not stated – see Connexus Simplified Process document.

Connexus Energy at a glance

Utility

Connexus Energy

Type

Electric cooperative

EIA utility ID

689

Residential customers

136,082 (EIA-861, 2025)

Net-metered residential customers

1,475 (EIA-861, 2025)

Service territory

8 counties in Minnesota

How to apply

PDF + email – Email application and all attachments to DER.InterconnectionCoordinator@connexusenergy.com · official link

Who submits

Member or contractor may submit by email; self-install allowed (Connexus does not require a contractor). Application fee deducted from the member's utility account on receipt and refunded after commissioning (incentive).

Export compensation

NEM – Connexus net metering rate options (<40 kW AC)
Rate options: Net Energy Billing Service, Simultaneous Purchase and Sale, Roll-over Credits ('Banking'), Time of Day Purchase; net metering grid access charge applies. Peak-Time Rebate/Whole House TOD/Budget Billing not combinable.

Review time (official)

Not stated on Connexus page; MN DIP (MN PUC) timelines apply.

Documents Connexus Energy asks for

  • Interconnection application formSimplified Interconnection Application (≤20 kW) or Standard Interconnection Application (>20 kW) Gridpol prepares this.
  • Site plan / site layoutSite map Gridpol prepares this.
  • Single-line diagram (one-line)One-line diagram Gridpol prepares this.
  • Other utility-specific documentLabels page
  • Inverter spec sheetManufacturer specifications
  • Proof of insuranceHomeowner's insurance
  • Battery spec sheet (when applicable)Energy Storage Application required for every storage DER in addition to the interconnection application
  • Interconnection agreementUniform Contract (<40 kW net metering) or Interconnection Agreement; member elects net metering rate schedule
  • Final inspection sign-offCertificate of Completion; MN-licensed electrical inspector approval

How the Connexus Energy process runs

  1. Optional pre-application report.
  2. Email application + site map, one-line, labels page, manufacturer specs, homeowner's insurance (+ Energy Storage Application) to DER.InterconnectionCoordinator@connexusenergy.com; fee deducted from member account.
  3. Connexus review and approval under MN DIP (Simplified ≤20 kW / Fast Track / Study).
  4. Sign Uniform Contract / Interconnection Agreement and elect net metering rate.
  5. Install (call 763.323.2650 before cutting meter seal).
  6. Pass MN-licensed electrical inspection; submit Certificate of Completion.
  7. Connexus final on-site inspection and witness test, then approval to operate; bi-directional meter installed and net metering rate activated.

Fees

FeeApplies toNote
$300Optional pre-application report2019 form; report within 15 business days
deducted from accountApplication feeAmount not stated on page; deducted on receipt and refunded after commissioning. Supplemental review/upgrade fees by card or check.

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Simplified20 kW
Fast Track4000 kW>20 kW to 4 MW
Study10000 kW
Net metering cap40 kW

Net metering rate options for <40 kW AC member-owned solar

Storage, EV and stamps

Battery storage

Energy Storage Application required for all storage interconnections. Size = aggregate nameplate of all generating/discharging elements (inverter AC rating). Buy-back does not include energy discharged from storage.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited