Home › Utilities › Minnesota › City of Alexandria

Municipal utility

City of Alexandria interconnection application

City of Alexandria is a municipal utility serving 8,871 residential customers in Minnesota (EIA-861, 2025). Gridpol files City of Alexandria interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Minnesota’s commission rule (Minn. Stat. § 216B.1611; MN PUC Orders in Docket E-999/CI-16-521 (Aug. 13, 2018; Apr. 19, 2019) adopting the Minnesota Distributed Energy Resources Interconnection Process (MN DIP), MN DER Interconnection Agreement (MN DIA) and Minnesota Technical Requirements; implemented in each rate-regulated utility's tariff) does not bind municipal utilitys; City of Alexandria sets its own interconnection policy. We confirm its form on the first project. Municipal utilities and cooperatives (except Dakota Electric) are not bound by the MN DIP tariff orders but must adopt interconnection standards under Minn. Stat. § 216B.1611 and follow § 216B.164 for < 40 kW net metering; munis commonly use the MMUA Minnesota Municipal Interconnection Process (M-MIP), cooperatives use their own DER interconnection procedures.

City of Alexandria at a glance

Utility

City of Alexandria

Type

Municipal utility

EIA utility ID

295

Residential customers

8,871 (EIA-861, 2025)

Net-metered residential customers

18 (EIA-861, 2025)

Service territory

1 county in Minnesota

Documents City of Alexandria asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for City of Alexandria. We confirm City of Alexandria’s exact list on the first project.

Minnesota interconnection rule

Commission

Minnesota Public Utilities Commission (MN PUC)

Interconnection rule

Minn. Stat. § 216B.1611; MN PUC Orders in Docket E-999/CI-16-521 (Aug. 13, 2018; Apr. 19, 2019) adopting the Minnesota Distributed Energy Resources Interconnection Process (MN DIP), MN DER Interconnection Agreement (MN DIA) and Minnesota Technical Requirements; implemented in each rate-regulated utility's tariff – Minnesota Distributed Energy Resources Interconnection Process (MN DIP) · source

Applies to

DER <= 10 MW interconnecting to rate-regulated utilities: Xcel Energy (NSP), Minnesota Power, Otter Tail Power, and Dakota Electric Association (rate-regulated cooperative). Other cooperatives and municipal utilities adopt their own processes (MMUA M-MIP for munis; cooperative versions).

Application form

Statewide templates: Attachment 2 Simplified Application Form; Attachment 3 Interconnection Application (Fast Track/Study); Uniform Statewide Contract (Minn. R. ch. 7835) or MN DIA; Certificate of Completion. Utilities file versions with utility-specific information.

Timelines

Simplified: completeness 10 BD (customer 5 BD to cure, utility 5 BD to re-review); screening 20 BD; executable agreement 5 days; customer returns agreement within 30 BD; witness test within 10 BD of Certificate of Completion or deemed waived; permission to operate within 3 BD of inspection/waiver. Fast Track: receipt notice 3 BD, initial review 15 BD after complete.

Fees

MN DIP 1.5.1: Simplified up to $100; Fast Track up to $100 + $1/kW certified, $100 + $2/kW non-certified; Study: down payment up to $1,000 + $2/kW. No additional fees except as specified.

Export compensation

NEM – Minn. Stat. § 216B.164; Minn. R. ch. 7835
Applies to all MN utilities incl. cooperatives and munis. < 40 kW: may elect average retail utility energy rate (coops/munis may charge a cost-justified fixed-cost fee and may use kWh credit expiring at year end). Public utilities: 40 kW-1,000 kW net metered with kWh credit carried forward, annual excess paid at applicable rate (subd. 3a). Uniform statewide contract for <1,000 kW (public utilities) and <40 kW (coops/munis) (subd. 6). Muni/coop boards may act as 'commission' if they adopt implementing rules (subd. 9, 11).

Not bound by the rule

Municipal utilities and cooperatives (except Dakota Electric) are not bound by the MN DIP tariff orders but must adopt interconnection standards under Minn. Stat. § 216B.1611 and follow § 216B.164 for < 40 kW net metering; munis commonly use the MMUA Minnesota Municipal Interconnection Process (M-MIP), cooperatives use their own DER interconnection procedures.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited