Home › Utilities › Maryland › SMECO
Electric cooperativeSMECO interconnection application
SMECO is an electric cooperative serving 163,451 residential customers in Maryland (EIA-861, 2025). Gridpol files SMECO interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. verify on first project: smeco.coop refused connections on 2026-11-13; SMECO portal, forms, fees, steps and whether COMAR 20.50.09 levels apply to the cooperative not retrieved. Archive.org is not reachable from our fetch tool and web search budget was exhausted on 2026-11-13.
SMECO at a glance
Southern Maryland Elec Coop Inc
TypeElectric cooperative
EIA utility ID17637
Residential customers163,451 (EIA-861, 2025)
Net-metered residential customers9,514 (EIA-861, 2025)
Service territory4 counties in Maryland
Export compensationNEM – Maryland net energy metering
not confirmed on SMECO site
COMAR 20.50.09.09 Level 1: completeness notice within 5 business days; approval and permission to operate within 20 business days of acceptable documents (if COMAR applies).
Documents SMECO asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for SMECO. We confirm SMECO’s exact list on the first project.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Level 1 | 20 kW | inverter-based, COMAR 20.50.09.08B (applies to electric companies in Maryland) |
Maryland COMAR 20.50.09 levels assumed applicable; not confirmed on SMECO site
Sources
- COMAR 20.50.09.09 Level 1 Review: https://regs.maryland.gov/us/md/exec/comar/20.50.09.09 (retrieved 2026-11-13)
- SMECO (connection refused 2026-11-13): https://www.smeco.coop/ (retrieved 2026-11-13)
Maryland interconnection rule
Maryland Public Service Commission (PSC)
Interconnection ruleCOMAR 20.50.09 (.01-.14) – Small Generator Facility Interconnection Standards · source
Applies toSmall generator facilities (incl. storage) interconnecting to a utility's distribution system in Maryland, under PSC jurisdiction (Subtitle 50 'Service Supplied by Electric Companies': BGE, Pepco, Delmarva, Potomac Edison, SMECO, Choptank and other PSC-regulated electric companies). PJM-jurisdictional wholesale requests follow PJM.
Application formUtility-specified interconnection request form (utilities must align forms with other MD utilities) with electronic signature/submission and status tracking on the utility website by applicant or authorized designee (20.50.09.04).
TimelinesLevel 1: 5 BD completeness, 15 BD verification, 20 BD approval/PTO; interconnection agreement signed within 30 calendar days. Conditional approval validity: <=100 kW must deliver certificate of completion within 6 months, >100 kW within 12 months (+6 months extension) (20.50.09.06N).
FeesNo fee for Level 1; Levels 2-4 fees specified in utility tariff (20.50.09.05); no fees for PJM-jurisdictional requests; pre-application report fee per tariff.
InsuranceCOMAR 20.50.09.06 contains no insurance requirement; PUA §7-306 bars electric companies from requiring net-metered systems meeting NEC/IEEE/UL to buy additional liability insurance.
External disconnectRequired: lockable, visible-break isolation device accessible to the utility, customer-owned, between facility and point of interconnection (20.50.09.06G); utility lockbox allowed (06H). No inverter waiver in rule text.
Export compensationNEM – Md. Code, Public Utilities §7-306; COMAR 20.50.10
Offered until earlier of 3,000 MW statewide or 2027-07-01; 5 MW for community solar/meter aggregation; excess credited 12 months valued at commodity rate, paid after April cycle; indefinite accrual option not for munis/coops; coops <250,000 may pay monthly. COMAR 20.50.10.01 still shows 1,500 MW (stale).
Net metering statute §7-306 contains specific provisions for municipal utilities and cooperatives, i.e. they offer net metering too; PSC-regulated coops (SMECO, Choptank) follow COMAR 20.50.09.
- COMAR 20.50.09: https://regs.maryland.gov/us/md/exec/comar/20.50.09 (retrieved 2026-11-13)
- COMAR 20.50.09.08 Levels: https://regs.maryland.gov/us/md/exec/comar/20.50.09.08 (retrieved 2026-11-13)
- COMAR 20.50.09.09 Level 1: https://regs.maryland.gov/us/md/exec/comar/20.50.09.09 (retrieved 2026-11-13)
- COMAR 20.50.09.06 General: https://regs.maryland.gov/us/md/exec/comar/20.50.09.06 (retrieved 2026-11-13)
- PUA §7-306: https://mgaleg.maryland.gov/mgawebsite/laws/StatuteText?article=gpu§ion=7-306 (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.