Versant Power interconnection application

Versant Power is an investor-owned utility serving 137,839 residential customers in Maine (EIA-861, 2025). Applications: Own online portal (Adobe Sign e-sign application (Level 1 / Levels 2-4)). Gridpol files Versant Power interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Versant Power’s official sources (see below).

Versant Power at a glance

Utility

Versant Power (ENMAX Corporation)

Type

Investor-owned utility

EIA utility ID

1179

Residential customers

137,839 (EIA-861, 2025)

Net-metered residential customers

2,487 (EIA-861, 2025)

Service territory

6 counties in Maine

How to apply

Own online portal – Adobe Sign e-sign application (Level 1 / Levels 2-4) · official link

Who submits

Applicant/developer (checklist has 'Developer Authorized Signature' and G-number); customer signs IX agreements. Inquiries dginterconnections@versantpower.com.

Export compensation

Net billing – Net Energy Billing (MPUC Chapter 313) - CNEBA
kWh or dollar bill credits

Review time (official)

Pre-application report 15 business days. Checklist: wait 10 BD before requesting screening update; signed IX agreements due within 30 BD; line construction completion notice within 30 BD (longer if minor modifications). Utility covers first $5,000 of Level 1 upgrades (Ch. 324).

Documents Versant Power asks for

  • Site plan / site layout (optional)Recommended for Level 1 Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Interconnection application formLevel 1 interconnection application Gridpol prepares this.
  • Net metering / net billing agreementCustomer Net Energy Billing Agreement (CNEBA) application
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • UL 1741 / IEEE 1547 certificationInverter certificate of compliance, UL 1741 SB
  • PV module spec sheetManufacturer data sheet of the modules.
  • Battery spec sheet (when applicable)ESS form if storage; Export Control Form if export-limited
  • Interconnection agreementSigned IX agreements returned within 30 business days with cost-sharing fee
  • Final inspection sign-offCertificate of Completion signed by Master Electrician (residential) or Maine State Electrical Inspector

How the Versant Power process runs

  1. Submit Level 1 application (Adobe Sign) with documents, application fee and separate $40 ombudsman fee.
  2. Intake specialist confirms complete or lists missing items; screening start notice.
  3. Screens 7A/7E/7I pass/fail; additional review offered on failure.
  4. Planner site visit; service entrance must meet standards before PTO.
  5. Utility sends IX agreements, upgrade estimate/invoice; customer returns signed agreements + $150 cost-sharing fee within 30 BD.
  6. Construct; submit Certificate of Completion signed by Master Electrician or State Electrical Inspector.
  7. Line construction/meter work (30 BD).
  8. Utility returns signed Certificate of Completion and formal Permission to Operate; do not energize before.

Fees

FeeApplies toNote
$100Level 1 application
$150Level 1 cost-sharing feePaid with signed IX agreement
$40Interconnection Ombudsman fee (all levels)Separate payment, required for completeness (eff. 12/11/2024)
$100 + $2/kWLevel 2
$100 + $3/kWLevel 3
$3,000Level 4

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 125 kWCertified inverter-based
Level 22000 kWCertified, passes screens
Level 310000 kWNo export beyond PCC
Level 4All others, non-FERC

MPUC Chapter 324

Storage, EV and stamps

Battery storage

ESS form required if storage; Export Control Form and Navigation Guide for export-limited systems.

PE stamp

Not stated for Level 1. – PE-stamped drawings are not included in Gridpol.

Common issues the utility lists

  • Application incomplete without application fee AND separate ombudsman fee
  • Service entrance/customer equipment not up to standard must be corrected before PTO

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited