Fox Islands Electric Cooperative, Inc. is an electric cooperative serving 2,151 customers in Maine (EIA-861, 2025). Gridpol files Fox Islands Electric Cooperative, Inc. interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Maine’s commission rule (65-407 C.M.R. Chapter 324) does not bind electric cooperatives; Fox Islands Electric Cooperative, Inc. sets its own interconnection policy. We confirm its form on the first project. Not addressed in Ch. 324 text; Maine's consumer-owned T&D utilities are generally Commission-regulated T&D utilities - confirm applicability with the specific utility.
Fox Islands Electric Cooperative, Inc. at a glance
Fox Islands Electric Coop, Inc
TypeElectric cooperative
EIA utility ID8780
Customers2,151 (EIA-861, 2025, short form: all customer classes)
Net-metered residential customersnone reported
Service territory1 county in Maine
Documents Fox Islands Electric Cooperative, Inc. asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for Fox Islands Electric Cooperative, Inc.. We confirm Fox Islands Electric Cooperative, Inc.’s exact list on the first project.
Maine interconnection rule
Maine Public Utilities Commission
Interconnection rule65-407 C.M.R. Chapter 324 – Small Generator Interconnection Procedures · source
Applies toTransmission and distribution utilities (T&D Utilities: CMP, Versant Power and other entities owning T&D plant for compensation in Maine) for generators subject to Commission jurisdiction (not FERC-jurisdictional). Rule text does not separately address consumer-owned utilities.
Application formStatewide standard forms adopted by Commission order must be used for all interconnection applications, interconnection agreements and study agreements (Ch. 324 s.4); deviations need Commission approval
TimelinesCompleteness notice within 5 business days (10 business days to cure); Level 1 screens 10 business days, deemed approval after 20 business days; Level 2 screens 15 business days; executable agreement within 10 business days of passing screens; applicant returns executed agreement within 30 business days; utility site visit before Level 1 agreement. Agreement may be terminated if not energized within 12 months of approval.
FeesLevel 1: $100. Level 2: $100 + $2/kW of generator capacity. Higher levels: study costs per Ch. 324 s.3 cost responsibility.
InsuranceUtility may require insurance only above thresholds: inverter-based none <=1 MW, $1M >2-5 MW, $2M >5 MW; non-inverter none <=50 kW, $500k 50-500 kW, $1M 0.5-2 MW, $2M 2-5 MW, $3M >5 MW. No additional liability insurance for s.5-compliant facilities unless applicant agrees.
External disconnectUtility shall not require additional controls, expressly including a utility-accessible disconnect switch, for facilities certified under Ch. 324 s.5 (IEEE 1547/UL 1741).
Export compensationNet billing – 35-A M.R.S. s.3209-A (kWh credit) and s.3209-B (tariff rate); 65-407 C.M.R. Chapter 313 (Net Energy Billing)
Net energy billing for DG resources <5 MW (kWh-credit and tariff-rate programs). Unused kWh credits expire per Commission rule; value remitted to low-income programs. Heavily amended 2023-2025 (PL 2025 c.430 ends new agreements for utility-side-of-meter resources after 2025-12-31); check current Ch. 313 for new projects.
Not addressed in Ch. 324 text; Maine's consumer-owned T&D utilities are generally Commission-regulated T&D utilities - confirm applicability with the specific utility.
- 65-407 C.M.R. ch. 324 (LII): https://www.law.cornell.edu/regulations/maine/department-65/division-407/chapter-324 (retrieved 2026-11-13)
- Ch. 324 s.11 Level 1: https://www.law.cornell.edu/regulations/maine/65-407-C-M-R-ch-324-SS-11 (retrieved 2026-11-13)
- Ch. 324 s.12 Level 2: https://www.law.cornell.edu/regulations/maine/65-407-C-M-R-ch-324-SS-12 (retrieved 2026-11-13)
- Ch. 324 s.15 General provisions (insurance, disconnect): https://www.law.cornell.edu/regulations/maine/65-407-C-M-R-ch-324-SS-15 (retrieved 2026-11-13)
- 35-A M.R.S. s.3209-A Net energy billing: https://www.mainelegislature.org/legis/statutes/35-A/title35-Asec3209-A.html (retrieved 2026-11-13)
- MPUC Order Adopting Rule, Docket 2023-00103: https://www.maine.gov/mpuc/sites/maine.gov.mpuc/files/inline-files/PUC%20Order%20Ch.%20324%2011-3-23.docx (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.