Houlton Water Company interconnection application

Houlton Water Company is a municipal utility serving 3,907 residential customers in Maine (EIA-861, 2025). Gridpol files Houlton Water Company interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Maine’s commission rule (65-407 C.M.R. Chapter 324) does not bind municipal utilitys; Houlton Water Company sets its own interconnection policy. We confirm its form on the first project. Not addressed in Ch. 324 text; Maine's consumer-owned T&D utilities are generally Commission-regulated T&D utilities - confirm applicability with the specific utility.

Houlton Water Company at a glance

Utility

Houlton Water Company

Type

Municipal utility

EIA utility ID

8883

Residential customers

3,907 (EIA-861, 2025)

Net-metered residential customers

none reported

Service territory

1 county in Maine

Documents Houlton Water Company asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for Houlton Water Company. We confirm Houlton Water Company’s exact list on the first project.

Maine interconnection rule

Commission

Maine Public Utilities Commission

Interconnection rule

65-407 C.M.R. Chapter 324 – Small Generator Interconnection Procedures · source

Applies to

Transmission and distribution utilities (T&D Utilities: CMP, Versant Power and other entities owning T&D plant for compensation in Maine) for generators subject to Commission jurisdiction (not FERC-jurisdictional). Rule text does not separately address consumer-owned utilities.

Application form

Statewide standard forms adopted by Commission order must be used for all interconnection applications, interconnection agreements and study agreements (Ch. 324 s.4); deviations need Commission approval

Timelines

Completeness notice within 5 business days (10 business days to cure); Level 1 screens 10 business days, deemed approval after 20 business days; Level 2 screens 15 business days; executable agreement within 10 business days of passing screens; applicant returns executed agreement within 30 business days; utility site visit before Level 1 agreement. Agreement may be terminated if not energized within 12 months of approval.

Fees

Level 1: $100. Level 2: $100 + $2/kW of generator capacity. Higher levels: study costs per Ch. 324 s.3 cost responsibility.

Insurance

Utility may require insurance only above thresholds: inverter-based none <=1 MW, $1M >2-5 MW, $2M >5 MW; non-inverter none <=50 kW, $500k 50-500 kW, $1M 0.5-2 MW, $2M 2-5 MW, $3M >5 MW. No additional liability insurance for s.5-compliant facilities unless applicant agrees.

External disconnect

Utility shall not require additional controls, expressly including a utility-accessible disconnect switch, for facilities certified under Ch. 324 s.5 (IEEE 1547/UL 1741).

Export compensation

Net billing – 35-A M.R.S. s.3209-A (kWh credit) and s.3209-B (tariff rate); 65-407 C.M.R. Chapter 313 (Net Energy Billing)
Net energy billing for DG resources <5 MW (kWh-credit and tariff-rate programs). Unused kWh credits expire per Commission rule; value remitted to low-income programs. Heavily amended 2023-2025 (PL 2025 c.430 ends new agreements for utility-side-of-meter resources after 2025-12-31); check current Ch. 313 for new projects.

Not bound by the rule

Not addressed in Ch. 324 text; Maine's consumer-owned T&D utilities are generally Commission-regulated T&D utilities - confirm applicability with the specific utility.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.