Municipal utilityCity of Kaplan interconnection application
City of Kaplan is a municipal utility serving 1,983 customers in Louisiana (EIA-861, 2025). Gridpol files City of Kaplan interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Louisiana’s commission rule (LPSC General Order dated 09-19-2019 (Docket R-33929), Distributed Generation Rule, incl. Standard Interconnection Agreement) does not bind municipal utilitys; City of Kaplan sets its own interconnection policy. We confirm its form on the first project. Electric cooperatives are bound. Municipal utilities (e.g. Lafayette Utilities System) are not LPSC-jurisdictional and set their own policies; New Orleans follows City Council rules.
City of Kaplan at a glance
City of Kaplan
TypeMunicipal utility
EIA utility ID10025
Customers1,983 (EIA-861, 2025, short form: all customer classes)
Net-metered residential customersnone reported
Service territory1 county in Louisiana
Documents City of Kaplan asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for City of Kaplan. We confirm City of Kaplan’s exact list on the first project.
Louisiana interconnection rule
Louisiana Public Service Commission
Interconnection ruleLPSC General Order dated 09-19-2019 (Docket R-33929), Distributed Generation Rule, incl. Standard Interconnection Agreement – Distributed Generation Rules · source
Applies toLPSC-jurisdictional electric utilities: investor-owned utilities and electric cooperatives (definition of Electric Utility, La. R.S. 45:1161); not municipal utilities; Entergy New Orleans is regulated by the New Orleans City Council
Application formStatewide Standard Interconnection Agreement (Part I standard information sections 1-4 + terms) filed by each utility
TimelinesResidential: submit Standard Interconnection Agreement at least 30 business days before interconnection, 30-day review (best efforts 14 days). Commercial/community: submit at least 45 business days before, 45-day review. Customer must document date of notification (Sec. 5.2).
FeesUtility may assess greater fees or customer charges to DG customers only if authorized by the Commission after notice in a rate case or formula rate plan proceeding (Sec. 6.3). Interconnection costs for inadequate facilities per utility extension policies.
InsuranceNot addressed in the rule text reviewed.
External disconnectVisibly open, lockable, manual, clearly labeled disconnect switch accessible to utility required, unless waived by utility under Section 4 of the Standard Interconnection Agreement: waiver if inverter cannot be manually overridden and shuts down on loss of utility, manufacturer warrants it, and inverter is properly installed and inspected/tested by utility (utility discretion).
Export compensationNet billing – LPSC General Order 09-19-2019 (R-33929)
For interconnection requests/installations after 2019-12-31: customer pays full retail rate for all energy purchased, zero rate for self-consumed energy, and exports credited at the utility's avoided cost (published annually by LPSC). Earlier customers grandfathered (15 years).
Electric cooperatives are bound. Municipal utilities (e.g. Lafayette Utilities System) are not LPSC-jurisdictional and set their own policies; New Orleans follows City Council rules.
- LPSC General Order 09-19-2019 (R-33929) Distributed Generation Rules: https://www.lpsc.louisiana.gov/docs/orders/GO-09-19-2019.pdf (retrieved 2026-11-13)
- LPSC Net Metering page: https://www.lpsc.louisiana.gov/Utilities_NetMetering (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.