Entergy New Orleans is an investor-owned utility serving 188,385 residential customers in Louisiana (EIA-861, 2025). Applications: Own online portal (Entergy Interconnection Portal). Gridpol files Entergy New Orleans interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Entergy New Orleans’s official sources (see below). Storage rules and timelines not published on utility page.

Entergy New Orleans at a glance

Utility

Entergy New Orleans, LLC (Entergy Corporation)

Type

Investor-owned utility

EIA utility ID

13478

Residential customers

188,385 (EIA-861, 2025)

Net-metered residential customers

10,252 (EIA-861, 2025)

Service territory

2 counties in Louisiana

How to apply

Own online portal – Entergy Interconnection Portal · official link

Who submits

Customer signs Interconnection Agreement; page says the equipment vendor may help complete the application.

Export compensation

NEM – Net Metering Service Schedule NM-4
Exports offset same-month kWh; excess credited to next month; remaining credit paid at avoided cost when service ends

Review time (official)

Not stated on utility page.

Documents Entergy New Orleans asks for

  • Interconnection agreementSigned Interconnection Agreement for Net Metering Facilities
  • Final inspection sign-offFinalized inspected permit per local/state requirements
  • Other utility-specific documentUtility-approved labeled manual disconnect accessible to Entergy at all times

How the Entergy New Orleans process runs

  1. Submit application/Interconnection Agreement via entergy-interconnection.com
  2. Obtain local permit and inspection
  3. Install approved manual disconnect and safety controls
  4. Pay meter installation charge
  5. Entergy installs net meter and approves operation

Fees

FeeApplies toNote
$50ResidentialOne-time meter installation charge
$75CommercialOne-time meter installation charge

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Residential25 kW
Commercial300 kW
Net metering cap25 kW

No other generator connected; not allowed in Downtown Network Area

Storage, EV and stamps

Battery storage

Not addressed on utility page.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.