Entergy Louisiana interconnection application

Entergy Louisiana is an investor-owned utility serving 961,871 residential customers in Louisiana (EIA-861, 2025). Applications: Own online portal (Entergy Interconnection Portal). Gridpol files Entergy Louisiana interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Entergy Louisiana’s official sources (see below). Portal, documents and steps confirmed from Entergy Louisiana pages, Rider DG and Entergy portal manual. Verify on first project: review timelines (not published), any LOA requirement for installer-submitted applications, storage-specific rules.

Entergy Louisiana at a glance

Utility

Entergy Louisiana LLC (Entergy Corporation)

Type

Investor-owned utility

EIA utility ID

11241

Residential customers

961,871 (EIA-861, 2025)

Net-metered residential customers

15,186 (EIA-861, 2025)

Service territory

60 counties in Louisiana

How to apply

Own online portal – Entergy Interconnection Portal · official link

Who submits

Customer is the applicant; installers/developers may register portal accounts and companies (company admin approved by Entergy) and prepare applications. The portal-generated application/agreement PDF must be signed and dated as specified on the form (corrected forms signed by preparer and customer) and uploaded. Contact: NetMeteringla@entergy.com.

Export compensation

Net billing – Rider Schedule DG (Optional Residential/Commercial Distributed Generation Rider, LPSC General Order 9-19-2019, Docket R-33929)
Two-channel billing: imports at retail rate, exports credited at Avoided Cost Rate $0.0386407/kWh (Attachment A eff. 4/1/2026, updated annually each April); credits carry forward; final bill check at avoided cost. Systems installed by 12/31/2019 grandfathered on Rider NM until 12/31/2034.

Review time (official)

Not stated on Entergy Louisiana pages or Rider DG; portal statuses (Ready For Review = completeness review; Requires Correction) with email notifications.

Documents Entergy Louisiana asks for

  • Interconnection application formOnline application at entergy-interconnection.com (Operating Company: Entergy Louisiana, program NEM or Non-NEM); portal generates the Standard Interconnection Agreement/application PDF Gridpol prepares this.
  • Customer signatureDownload portal-generated application/agreement, sign and date as specified, upload back to portal
  • Single-line diagram (one-line)Completed one-line diagram of the proposed facility (example linked on Entergy Louisiana process page) Gridpol prepares this.
  • UL 1741 / IEEE 1547 certificationInverter-based resources: upload manufacturer documentation showing UL 1741 and/or IEEE 1547 compliance
  • Inverter spec sheetInverter manufacturer/model and kW AC entered in portal Equipment section
  • PV module spec sheetPV module manufacturer/model and kW DC entered as Power Module
  • Battery spec sheet (when applicable)PV+battery: second Power Module with battery manufacturer/model and rating
  • Final inspection sign-off (when applicable)Permits from local authorities where applicable, before new meter is installed
  • Other utility-specific document (when applicable)Commercial systems >300 kW: signed final LPSC Order approving the project

How the Entergy Louisiana process runs

  1. Register (Sign Up) on entergy-interconnection.com; installers may register/join a company.
  2. Start New Application, select Entergy Louisiana and program type (NEM / Non-NEM); enter customer account, equipment (inverter AC, PV/battery Power Modules) and upload UL 1741/IEEE 1547 documentation and one-line diagram.
  3. Download the portal-generated application/agreement, sign and date, upload it; Entergy performs completeness review (Ready For Review).
  4. If Requires Correction: fix flagged fields, re-download, re-sign (preparer and customer), re-upload; next steps are sent by email.
  5. Install per Entergy Safety and Interconnection Standard (UL 1741 inverter, visible lockable labeled manual disconnect accessible 24/7).
  6. Provide local permits/inspection where applicable; Entergy installs the two-channel DG meter ($100) and interconnection begins.

Fees

FeeApplies toNote
$100Initial single DG meter installation (all DG interconnections)One-time charge per Rider Schedule DG Sec. IV; plus directly related interconnection costs, distribution upgrades and charges for additional work

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Residential DG25 kWNet generating capacity per location (Rider DG / LPSC DG Rule)
Commercial DG300 kW>300 kW only with LPSC approval (DG Rule Sec. 4.5)
Net metering cap300 kW

Facility must be on customer premises and designed to offset up to 100% of consumption. Not in Downtown Underground Network.

Storage, EV and stamps

Battery storage

Battery is entered as a separate Power Module (DC) under the system inverter in the portal (PV+battery = two Power Modules); utility page and Rider DG do not state further storage rules.

Common issues the utility lists

  • Required portal fields blank or outside parameters (flagged red)
  • Application returned as 'Requires Correction' after Entergy review; corrected form must be re-signed and re-uploaded
  • Location in Downtown Underground Network not eligible

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.