Electric cooperativeDEMCO interconnection application
DEMCO is an electric cooperative serving 111,329 residential customers in Louisiana (EIA-861, 2025). Applications: PDF + email (Standard Interconnection Agreement for Net Metering Facilities to solarapp@demco.org). Gridpol files DEMCO interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from DEMCO’s official sources (see below). Fees and storage rules not published.
DEMCO at a glance
Dixie Electric Membership Corp
TypeElectric cooperative
EIA utility ID5202
Residential customers111,329 (EIA-861, 2025)
Net-metered residential customers1,369 (EIA-861, 2025)
Service territory7 counties in Louisiana
How to applyPDF + email – Standard Interconnection Agreement for Net Metering Facilities to solarapp@demco.org · official link
Who submitsLicensed installer/solar vendor submits before installing; Energy Services Coordinator communicates with vendor; member receives release-to-operate e-mail.
Export compensationNet billing – LPSC Net Metering General Order (R-33929, 2019) – avoided cost
Excess credited at avoided cost $0.03847/kWh (Mar 1, 2026 - Feb 28, 2027), updated each March
Documents DEMCO asks for
- Interconnection application formStandard Interconnection Agreement for Net Metering Facilities (application) Gridpol prepares this.
- Single-line diagram (one-line)Accurate detailed one-line from generation equipment to point of interconnection Gridpol prepares this.
- Site plan / site layoutSite map showing location of all components Gridpol prepares this.
- Final inspection sign-offParish permit + final electrical inspection; inspector signs Section 4 Item 1 of agreement or Final Inspection Certificate; parish sends final permit to DEMCO
- UL 1741 / IEEE 1547 certificationInverters IEEE 1547 and UL 1741 listed
How the DEMCO process runs
- Installer obtains parish permit
- Submit agreement, one-line and site map to solarapp@demco.org before installing
- Energy Services Coordinator approves and notifies vendor
- Install; parish final inspection; parish sends final permit to DEMCO
- DEMCO on-site inspection with installer
- Pass: meter reprogrammed, net metering set up, release-to-operate e-mail to vendor and member; fail: vendor told reason
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Net metering | 100 kW | Generating power no more than 100 kW |
| Net metering cap | 100 kW |
Common issues the utility lists
- Installation without notifying DEMCO → system disconnection
- AC disconnect not UL-listed visible-break, lockable, labeled, exterior within 5 ft of DEMCO meter and accessible
Gridpol’s pre-submission check covers these before we file.
Sources
- DEMCO – Solar Panel Installation Process: https://demco.org/solar-panel-installation-process (retrieved 2026-11-13)
- DEMCO – Solar Energy Center: https://demco.org/solar-energy-center (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.