Home › Utilities › Kentucky › LG&E

Investor-owned utility

LG&E interconnection application

LG&E is an investor-owned utility serving 388,146 residential customers in Kentucky (EIA-861, 2025). Applications: PDF + email (LG&E/KU Net Metering group). Gridpol files LG&E interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from LG&E’s official sources (see below).

LG&E at a glance

Utility

Louisville Gas & Electric Co (PPL Corporation)

Type

Investor-owned utility

EIA utility ID

11249

Residential customers

388,146 (EIA-861, 2025)

Net-metered residential customers

3,337 (EIA-861, 2025)

Service territory

9 counties in Kentucky

How to apply

PDF + email – LG&E/KU Net Metering group · official link

Who submits

Applications can be completed by a 3rd party contractor; submit by email (faster) or mail.

Export compensation

Net billing – Rider NMS-2
Dollar credit $0.07089/kWh for all exports (LG&E tariff).

Review time (official)

Level 1: 20 business days; Level 2: 30 business days (tariff).

Documents LG&E asks for

  • Interconnection application formLevel 1 (tariff Sheet 108.5) or Level 2 (Sheet 108.6) Gridpol prepares this.
  • Single-line diagram (one-line)1-line electrical drawing Gridpol prepares this.
  • Site plan / site layoutExact locations of AC disconnect(s), inverter, main panel/point of connection Gridpol prepares this.
  • Inverter spec sheetManufacturer inverter specification
  • Proof of insurance (when applicable)General liability insurance; proof on request

How the LG&E process runs

  1. Review requirements; choose Level 1/2 application.
  2. Email application + 3 attachments to net.metering@lge-ku.com.
  3. Approval notice.
  4. Install (local inspections); utility may inspect/witness test.
  5. Notify net.metering@lge-ku.com of completed installation.
  6. Utility orders and installs net meter; service begins.

Fees

FeeApplies toNote
$0Level 1
$100Level 2 inspection/processing (non-refundable)plus up to $1,000 for initial impact study if needed

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 145 kWUL 1741/IEEE 1547 inverter meeting screens
Level 245 kWother
Net metering cap45 kW

NMS-2 max 45 kW.

Storage, EV and stamps

Battery storage

Application asks battery power rating in kW (not kWh).

Common issues the utility lists

  • Incomplete application / missing the 3 required attachments
  • Battery rating given in kWh instead of kW

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited