Electric cooperativeBlue Grass Energy Cooperative Corporation interconnection application
Blue Grass Energy Cooperative Corporation is an electric cooperative serving 61,870 residential customers in Kentucky (EIA-861, 2025). Gridpol files Blue Grass Energy Cooperative Corporation interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Blue Grass Energy Cooperative Corporation is a member of East Kentucky Power Cooperative (EKPC), which publishes a model interconnection policy (see below); the Kentucky rule (KRS 278.465-278.468; PSC 'Interconnection and Net Metering Guidelines - Kentucky' (Appendix A, Order of 2009-01-08, Administrative Case No. 2008-00169)) also applies where it covers electric cooperatives. Blue Grass Energy Cooperative Corporation’s own form is confirmed on the first project.
Blue Grass Energy Cooperative Corporation at a glance
Blue Grass Energy Coop Corp
TypeElectric cooperative
EIA utility ID1886
Residential customers61,870 (EIA-861, 2025)
Net-metered residential customers534 (EIA-861, 2025)
Service territory23 counties in Kentucky
Wholesale supplier / associationEast Kentucky Power Cooperative (EKPC) · Manual of Small Generator Interconnection Requirements for Direct Interconnection with EKPC Member Cooperative Distribution Systems (For Generating Facilities of 10 MW or Less)
Documents Blue Grass Energy Cooperative Corporation asks for
- Interconnection application formRequired by the state rule Gridpol prepares this.
- Single-line diagram (one-line)Required by the state rule Gridpol prepares this.
- Site plan / site layoutRequired by the state rule Gridpol prepares this.
- UL 1741 / IEEE 1547 certificationRequired by the state rule
- Interconnection agreementRequired by the state rule
- Proof of insuranceRequired by the state rule
- Final inspection sign-offRequired by the state rule
Documents required by the Kentucky rule. Blue Grass Energy Cooperative Corporation may ask for more on its own form; we confirm on the first project.
Kentucky interconnection rule
Kentucky Public Service Commission
Interconnection ruleKRS 278.465-278.468; PSC 'Interconnection and Net Metering Guidelines - Kentucky' (Appendix A, Order of 2009-01-08, Administrative Case No. 2008-00169) – Interconnection and Net Metering Guidelines - Kentucky · source
Applies toAll retail electric suppliers (KRS 278.465-278.468): investor-owned utilities (KU, LG&E, Kentucky Power, Duke Energy Kentucky) and PSC-regulated rural electric cooperatives. 'Retail electric supplier' excludes municipal corporations (KRS 278.010(4)), so municipal utilities are not covered.
Application formUtility-specific 'Application for Interconnection and Net Metering' (Level 1 / Level 2) filed with tariff, following the PSC guideline template; must be posted on utility website; mail or in-person submission must be accepted
TimelinesLevel 1: decision within 20 business days; Level 2: 30 business days of a complete application (incomplete-information time added). If inspection/witness test required, customer notifies within 3 business days of completion and test occurs within 10 business days of completion.
FeesLevel 1: none. Level 2: up to $100 application/inspection/processing fee; reasonable impact study costs up to $1,000.
InsuranceCustomer must maintain general liability insurance (homeowner's, commercial or other policy) for Level 1 and Level 2; proof on request at application.
External disconnectWhere required by the utility, visible-break lockable external disconnect switch adjacent to the meter (or location labeled on meter), accessible to utility at all times; utility may waive case-by-case.
Export compensationNet billing – KRS 278.465-278.466 (2019 SB 100)
Systems <=45 kW. Exports compensated at a rate set by the PSC in each supplier's rate case, as dollar bill credits carried forward (no cash refund). Systems in service before the supplier's first post-2020 NM order keep 1:1 kWh netting for 25 years. Supplier obligation may end at 1% of single-hour peak. PSC guidelines template still shows original 30 kW limit; statute now 45 kW.
Cooperatives are covered. Municipal utilities (mostly TVA distributors) are excluded from 'retail electric supplier' and follow their own/TVA policies.
- KY PSC Interconnection and Net Metering Guidelines (Appendix A, Adm. Case 2008-00169): https://psc.ky.gov/agencies/psc/Industry/Electric/Final%20Net%20Metering-Interconnection%20Guidelines%201-8-09.pdf (retrieved 2026-11-13)
- KRS 278.465 Definitions: https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=49545 (retrieved 2026-11-13)
- KRS 278.466 Availability of net metering: https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=49546 (retrieved 2026-11-13)
- KRS 278.467 Guidelines and forms: https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=49547 (retrieved 2026-11-13)
- KRS 278.010 Definitions (retail electric supplier): https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=57960 (retrieved 2026-11-13)
Other utilities in Kentucky
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.