Home › Utilities › Kentucky

Kentucky

Kentucky interconnection applications

59 electric utilities serve Kentucky (EIA-861, 2025): 4 investor-owned utilitys, 24 electric cooperatives, 30 municipal utilitys, 1 federal power agency. Together they serve 2,062,837 residential customers; 10,993 residential customers were on net metering at year-end 2025.

Largest utilities in Kentucky

KUProcess verified

Investor-owned utility · 476,780 residential customers · Kentucky

Applications: PDF + email – LG&E/KU Net Metering group

Interconnection process and documents →
LG&EProcess verified

Investor-owned utility · 388,146 residential customers · Kentucky

Applications: PDF + email – LG&E/KU Net Metering group

Interconnection process and documents →
Duke EnergyProcess verified

Investor-owned utility · 140,950 residential customers · Kentucky

Applications: PDF + email – Duke Energy Customer Owned Generation

Interconnection process and documents →
Kentucky PowerProcess verified

Investor-owned utility · 130,322 residential customers · Kentucky

Applications: PowerClerk – AEP PowerClerk

Interconnection process and documents →
South Kentucky Rural E C CState rule applies

Electric cooperative · 65,494 residential customers · Kentucky

Interconnection process and documents →
Owen Electric Cooperative Inc.Association model policy

Electric cooperative · 65,069 residential customers · Kentucky

Interconnection process and documents →
Blue Grass Energy Cooperative CorporationAssociation model policy

Electric cooperative · 61,870 residential customers · Kentucky

Interconnection process and documents →
Warren Rural Electric Cooperative CorporationState rule applies

Electric cooperative · 61,500 residential customers · Kentucky

Interconnection process and documents →
Salt River Electric Cooperative CorporationAssociation model policy

Electric cooperative · 54,002 residential customers · Kentucky

Interconnection process and documents →
Jackson Energy Cooperative CorporationAssociation model policy

Electric cooperative · 49,590 residential customers · Kentucky

Interconnection process and documents →
Kenergy CorporationState rule applies

Electric cooperative · 47,514 residential customers · Kentucky

Interconnection process and documents →
Pennyrile Rural Electric CooperativeState rule applies

Electric cooperative · 40,704 residential customers · Kentucky

Interconnection process and documents →

Export compensation among the researched Kentucky utilities: Net billing. Rules differ by utility – see each utility page.

Kentucky interconnection rule

Commission

Kentucky Public Service Commission

Interconnection rule

KRS 278.465-278.468; PSC 'Interconnection and Net Metering Guidelines - Kentucky' (Appendix A, Order of 2009-01-08, Administrative Case No. 2008-00169) – Interconnection and Net Metering Guidelines - Kentucky · source

Applies to

All retail electric suppliers (KRS 278.465-278.468): investor-owned utilities (KU, LG&E, Kentucky Power, Duke Energy Kentucky) and PSC-regulated rural electric cooperatives. 'Retail electric supplier' excludes municipal corporations (KRS 278.010(4)), so municipal utilities are not covered.

Application form

Utility-specific 'Application for Interconnection and Net Metering' (Level 1 / Level 2) filed with tariff, following the PSC guideline template; must be posted on utility website; mail or in-person submission must be accepted

Timelines

Level 1: decision within 20 business days; Level 2: 30 business days of a complete application (incomplete-information time added). If inspection/witness test required, customer notifies within 3 business days of completion and test occurs within 10 business days of completion.

Fees

Level 1: none. Level 2: up to $100 application/inspection/processing fee; reasonable impact study costs up to $1,000.

Insurance

Customer must maintain general liability insurance (homeowner's, commercial or other policy) for Level 1 and Level 2; proof on request at application.

External disconnect

Where required by the utility, visible-break lockable external disconnect switch adjacent to the meter (or location labeled on meter), accessible to utility at all times; utility may waive case-by-case.

Export compensation

Net billing – KRS 278.465-278.466 (2019 SB 100)
Systems <=45 kW. Exports compensated at a rate set by the PSC in each supplier's rate case, as dollar bill credits carried forward (no cash refund). Systems in service before the supplier's first post-2020 NM order keep 1:1 kWh netting for 25 years. Supplier obligation may end at 1% of single-hour peak. PSC guidelines template still shows original 30 kW limit; statute now 45 kW.

Not bound by the rule

Cooperatives are covered. Municipal utilities (mostly TVA distributors) are excluded from 'retail electric supplier' and follow their own/TVA policies.

LevelUp toCriteria / review / fee
Level 145 kWinverter-based, UL 1741 certified; aggregate gen <=15% of line-section peak; shared secondary <=20 kVA; not on area/spot network; no utility construction required · approve/deny within 20 business days · no application, study, inspection or witness test fees
Level 245 kWnon-inverter, non-UL-1741 equipment, or failing a Level 1 condition; utility technical requirements based on IEEE 1547 · 30 business days after complete application · up to $100 non-refundable; initial impact study costs up to $1,000

All 59 utilities in Kentucky

Residential customers in Kentucky per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited