Electric cooperativeKenergy Corporation interconnection application
Kenergy Corporation is an electric cooperative serving 47,514 residential customers in Kentucky (EIA-861, 2025). Gridpol files Kenergy Corporation interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Kentucky’s interconnection rule (KRS 278.465-278.468; PSC 'Interconnection and Net Metering Guidelines - Kentucky' (Appendix A, Order of 2009-01-08, Administrative Case No. 2008-00169)) applies to Kenergy Corporation. Levels, timelines and documents below come from that rule; Kenergy Corporation’s own form and portal are confirmed on the first project.
Kenergy Corporation at a glance
Kenergy Corp
TypeElectric cooperative
EIA utility ID9964
Residential customers47,514 (EIA-861, 2025)
Net-metered residential customers459 (EIA-861, 2025)
Service territory14 counties in Kentucky
Wholesale supplier / associationBig Rivers Electric Corp
Documents Kenergy Corporation asks for
- Interconnection application formRequired by the state rule Gridpol prepares this.
- Single-line diagram (one-line)Required by the state rule Gridpol prepares this.
- Site plan / site layoutRequired by the state rule Gridpol prepares this.
- UL 1741 / IEEE 1547 certificationRequired by the state rule
- Interconnection agreementRequired by the state rule
- Proof of insuranceRequired by the state rule
- Final inspection sign-offRequired by the state rule
Documents required by the Kentucky rule. Kenergy Corporation may ask for more on its own form; we confirm on the first project.
Kentucky interconnection rule
Kentucky Public Service Commission
Interconnection ruleKRS 278.465-278.468; PSC 'Interconnection and Net Metering Guidelines - Kentucky' (Appendix A, Order of 2009-01-08, Administrative Case No. 2008-00169) – Interconnection and Net Metering Guidelines - Kentucky · source
Applies toAll retail electric suppliers (KRS 278.465-278.468): investor-owned utilities (KU, LG&E, Kentucky Power, Duke Energy Kentucky) and PSC-regulated rural electric cooperatives. 'Retail electric supplier' excludes municipal corporations (KRS 278.010(4)), so municipal utilities are not covered.
Application formUtility-specific 'Application for Interconnection and Net Metering' (Level 1 / Level 2) filed with tariff, following the PSC guideline template; must be posted on utility website; mail or in-person submission must be accepted
TimelinesLevel 1: decision within 20 business days; Level 2: 30 business days of a complete application (incomplete-information time added). If inspection/witness test required, customer notifies within 3 business days of completion and test occurs within 10 business days of completion.
FeesLevel 1: none. Level 2: up to $100 application/inspection/processing fee; reasonable impact study costs up to $1,000.
InsuranceCustomer must maintain general liability insurance (homeowner's, commercial or other policy) for Level 1 and Level 2; proof on request at application.
External disconnectWhere required by the utility, visible-break lockable external disconnect switch adjacent to the meter (or location labeled on meter), accessible to utility at all times; utility may waive case-by-case.
Export compensationNet billing – KRS 278.465-278.466 (2019 SB 100)
Systems <=45 kW. Exports compensated at a rate set by the PSC in each supplier's rate case, as dollar bill credits carried forward (no cash refund). Systems in service before the supplier's first post-2020 NM order keep 1:1 kWh netting for 25 years. Supplier obligation may end at 1% of single-hour peak. PSC guidelines template still shows original 30 kW limit; statute now 45 kW.
Cooperatives are covered. Municipal utilities (mostly TVA distributors) are excluded from 'retail electric supplier' and follow their own/TVA policies.
- KY PSC Interconnection and Net Metering Guidelines (Appendix A, Adm. Case 2008-00169): https://psc.ky.gov/agencies/psc/Industry/Electric/Final%20Net%20Metering-Interconnection%20Guidelines%201-8-09.pdf (retrieved 2026-11-13)
- KRS 278.465 Definitions: https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=49545 (retrieved 2026-11-13)
- KRS 278.466 Availability of net metering: https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=49546 (retrieved 2026-11-13)
- KRS 278.467 Guidelines and forms: https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=49547 (retrieved 2026-11-13)
- KRS 278.010 Definitions (retail electric supplier): https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=57960 (retrieved 2026-11-13)
Other utilities in Kentucky
- KU454,021
- LG&E388,146
- Duke Energy140,950
- Kentucky Power130,322
- South Kentucky Rural E C C65,346
- Owen Electric Cooperative Inc.65,069
- Blue Grass Energy Cooperative Corporation61,870
- Warren Rural Electric Cooperative Corporation61,500
- Salt River Electric Cooperative Corporation54,002
- Jackson Energy Cooperative Corporation49,590
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.