City of Cody is a municipal utility serving 8,126 customers in Wyoming (EIA-861, 2025). Gridpol files City of Cody interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Wyoming’s commission rule (W.S. 37-16-104 (safety and performance requirements for net metering systems); no comprehensive PSC small-generator interconnection rule identified in this pass) does not bind municipal utilitys; City of Cody sets its own interconnection policy. We confirm its form on the first project. Electric cooperatives and irrigation districts are bound by the net metering statute; municipal utilities are excluded and set their own policies.

City of Cody at a glance

Utility

City of Cody

Type

Municipal utility

EIA utility ID

3881

Customers

8,126 (EIA-861, 2025, short form: all customer classes)

Net-metered residential customers

none reported

Service territory

1 county in Wyoming

Documents City of Cody asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for City of Cody. We confirm City of Cody’s exact list on the first project.

Wyoming interconnection rule

Statute verified. Whether the WY PSC has adopted separate interconnection rules/standard forms (and insurance rules) not verified; utility tariffs (e.g., Rocky Mountain Power WY Schedule 135/Rule) not reviewed. Web search budget exhausted in this run.

Commission

Wyoming Public Service Commission (PSC)

Interconnection rule

W.S. 37-16-104 (safety and performance requirements for net metering systems); no comprehensive PSC small-generator interconnection rule identified in this pass – Net Metering (W.S. 37-16-101 to 37-16-104) · source

Applies to

Electric utilities: electrical companies (IOUs such as Rocky Mountain Power, Black Hills, Cheyenne Light), irrigation districts and electric cooperatives distributing to retail customers; municipalities are excluded from 'electrical company' (W.S. 37-16-101(a)(iii),(v)).

Application form

Utility-specific (no statewide form found).

Fees

Utility may not charge a customer-generator fees that increase its minimum monthly charge above other customers in the same rate class (W.S. 37-16-102(a)(iii)). Customer bears facility costs and utility-required modifications (37-16-104(d)).

External disconnect

Required by statute: customer-generator provides, at its expense, lockable switching equipment capable of isolating the facility, approved by and accessible to the utility at all times (W.S. 37-16-104(b)).

Export compensation

NEM – W.S. 37-16-101 to 37-16-104
Monthly net metering; excess kWh credited to following month; unused kWh credit at start of each calendar year sold to the utility at its filed avoided cost (37-16-103). Bidirectional meter offered. Must meet NEC, IEEE and UL standards; PSC may adopt additional control/testing requirements by regulation (37-16-104(e)).

Not bound by the rule

Electric cooperatives and irrigation districts are bound by the net metering statute; municipal utilities are excluded and set their own policies.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.