Home › Utilities › Tennessee › Benton County
Municipal utilityBenton County interconnection application
Benton County is a municipal utility serving 8,750 residential customers in Tennessee (EIA-861, 2025). Gridpol files Benton County interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Tennessee’s commission rule (the state interconnection rule) does not bind municipal utilitys; Benton County sets its own interconnection policy. We confirm its form on the first project. TVA local power companies (municipal utilities and cooperatives) set their own interconnection procedures and agreements; Green Connect participation is voluntary per LPC (residential PV, TVA QCN installer, TVA program standards, installation verification). Excess generation via TVA Dispersed Power Production.
Benton County at a glance
Benton County
TypeMunicipal utility
EIA utility ID1578
Residential customers8,750 (EIA-861, 2025)
Net-metered residential customersnone reported
Service territory1 county in Tennessee
Documents Benton County asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for Benton County. We confirm Benton County’s exact list on the first project.
Tennessee interconnection rule
TVA role and no-net-metering confirmed from TVA FAQ (2021). TPUC jurisdiction statement (only Kingsport Power) not verified from TPUC source; Dispersed Power Production terms (size limits, rate) not retrieved; tva.com blocks direct fetch.
Tennessee Public Utility Commission (TPUC); Tennessee Valley Authority (TVA) as wholesale supplier/regulator of its local power companies
Interconnection rule– No general TPUC small-generator interconnection rule. TVA-area local power companies (munis/coops) use TVA program standards (Green Connect / Dispersed Power Production) and their own interconnection agreements. · source
Applies toNearly all of Tennessee is served by TVA-supplied municipal and cooperative local power companies (LPCs), whose retail rates and DG policies are governed by TVA wholesale contracts, not TPUC. TPUC regulates only investor-owned Kingsport Power (AEP Appalachian Power) in electricity; no TPUC interconnection rule was found.
Application formLPC-specific interconnection application/agreement; in participating LPCs the TVA Green Connect portal (www.greenconnect.com) or paper application is used for residential PV with TVA Quality Contractor Network (QCN) installer.
TimelinesGreen Connect: no time limit to install after application while program active; installation verification (1-2 hours) by Green Connect team with homeowner/installer/inspectors before commissioning (TVA Green Connect FAQ).
FeesLPC-specific ('pays all necessary fees' per TVA FAQ).
InsuranceTVA does not require liability insurance; many local power companies have their own liability insurance requirements (TVA Green Connect FAQ Q23).
Export compensationNone statewide – TVA Green Connect FAQ Q20-21
Net metering is not available in the TVA service area. Excess energy can be compensated via TVA Dispersed Power Production (with the local power company). Behind-the-meter PV allowed.
TVA local power companies (municipal utilities and cooperatives) set their own interconnection procedures and agreements; Green Connect participation is voluntary per LPC (residential PV, TVA QCN installer, TVA program standards, installation verification). Excess generation via TVA Dispersed Power Production.
- TVA Green Connect FAQs (Apr. 2021): https://tva-azr-eastus-cdn-ep-tvawcm-prd.azureedge.net/cdn-tvawcma/docs/default-source/energy/valley-renewable-energy/gc-faqs-final-20210415.pdf?sfvrsn=d2d7479_2 (retrieved 2026-11-13)
- TVA Green Connect page (archive.org copy, Apr. 2025): https://web.archive.org/web/20250404053108/https://www.tva.com/energy/valley-renewable-energy/green-connect (retrieved 2026-11-13)
Other utilities in Tennessee
- Nashville Electric Service (NES)424,808
- Memphis Light, Gas and Water (MLGW)385,015
- Middle Tennessee Electric (MTE)311,520
- Knoxville Utilities Board (KUB)196,674
- EPB (Electric Power Board of Chattanooga)164,914
- Volunteer Electric Cooperative105,248
- Cumberland Electric Member Corporation101,734
- City of Clarksville77,509
- Johnson City72,729
- Duck River Electric Member Corporation71,969
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.