Wellsboro Electric Company (WECO) interconnection application

Wellsboro Electric Company (WECO) is an investor-owned utility serving 5,174 residential customers in Pennsylvania (EIA-861, 2025). Applications: PDF + mail (Mail to Wellsboro Electric Company, Attn: Engineering Dept., PO Box 138, Wellsboro PA 16901). Gridpol files Wellsboro Electric Company (WECO) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Wellsboro Electric Company (WECO)’s official sources (see below).

Wellsboro Electric Company (WECO) at a glance

Utility

Wellsborough Electric Co (C&T Enterprises)

Type

Investor-owned utility

EIA utility ID

20334

Residential customers

5,174 (EIA-861, 2025)

Net-metered residential customers

40 (EIA-861, 2025)

Service territory

1 county in Pennsylvania

How to apply

PDF + mail – Mail to Wellsboro Electric Company, Attn: Engineering Dept., PO Box 138, Wellsboro PA 16901 · official link

Who submits

Customer; contractor via Letter of Authorization.

Export compensation

NEM – Rider D - Net Metering Rider

Review time (official)

WECO requires 2 weeks notice prior to energizing.

Documents Wellsboro Electric Company (WECO) asks for

  • Interconnection application formLevel 1 (<=10 kW) or Level 2/3/4 (>10 kW-10,000 kW) Gridpol prepares this.
  • Site plan / site layoutsite layout map Gridpol prepares this.
  • Single-line diagram (one-line)single/three line diagram Gridpol prepares this.
  • PV module spec sheetequipment specification sheets
  • Net metering / net billing agreementWECO Net-Metering Rider
  • Other utility-specific documentOwnership Letter
  • Letter of authorization / designated agent formLetter of Authorization
  • Final inspection sign-offelectrical inspection before energizing approval

How the Wellsboro Electric Company (WECO) process runs

  1. Submit application with fee, site layout, single/three line, spec sheets, NEM Rider, Ownership Letter, LOA
  2. WECO completes System Study
  3. Install; submit Electrical Inspection
  4. Schedule acceptance test with WECO
  5. Give 2 weeks notice before energizing; WECO completes net metering work

Fees

FeeApplies toNote
$100Level 1non-refundable, include with application
$250 + $1/kWLevel 2plus minor modification/review costs
$350 + $2/kWLevel 3plus study costs
contact utilityLevel 4

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 110 kW
Level 2-410000 kWLevel 2 >500 kW requires WECO submittal to PA PUC

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited