Investor-owned utilityWellsboro Electric Company (WECO) interconnection application
Wellsboro Electric Company (WECO) is an investor-owned utility serving 5,174 residential customers in Pennsylvania (EIA-861, 2025). Applications: PDF + mail (Mail to Wellsboro Electric Company, Attn: Engineering Dept., PO Box 138, Wellsboro PA 16901). Gridpol files Wellsboro Electric Company (WECO) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Wellsboro Electric Company (WECO)’s official sources (see below).
Wellsboro Electric Company (WECO) at a glance
Wellsborough Electric Co (C&T Enterprises)
TypeInvestor-owned utility
EIA utility ID20334
Residential customers5,174 (EIA-861, 2025)
Net-metered residential customers40 (EIA-861, 2025)
Service territory1 county in Pennsylvania
How to applyPDF + mail – Mail to Wellsboro Electric Company, Attn: Engineering Dept., PO Box 138, Wellsboro PA 16901 · official link
Who submitsCustomer; contractor via Letter of Authorization.
Export compensationNEM – Rider D - Net Metering Rider
Review time (official)WECO requires 2 weeks notice prior to energizing.
Documents Wellsboro Electric Company (WECO) asks for
- Interconnection application formLevel 1 (<=10 kW) or Level 2/3/4 (>10 kW-10,000 kW) Gridpol prepares this.
- Site plan / site layoutsite layout map Gridpol prepares this.
- Single-line diagram (one-line)single/three line diagram Gridpol prepares this.
- PV module spec sheetequipment specification sheets
- Net metering / net billing agreementWECO Net-Metering Rider
- Other utility-specific documentOwnership Letter
- Letter of authorization / designated agent formLetter of Authorization
- Final inspection sign-offelectrical inspection before energizing approval
How the Wellsboro Electric Company (WECO) process runs
- Submit application with fee, site layout, single/three line, spec sheets, NEM Rider, Ownership Letter, LOA
- WECO completes System Study
- Install; submit Electrical Inspection
- Schedule acceptance test with WECO
- Give 2 weeks notice before energizing; WECO completes net metering work
Fees
| Fee | Applies to | Note |
|---|---|---|
| $100 | Level 1 | non-refundable, include with application |
| $250 + $1/kW | Level 2 | plus minor modification/review costs |
| $350 + $2/kW | Level 3 | plus study costs |
| contact utility | Level 4 |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Level 1 | 10 kW | |
| Level 2-4 | 10000 kW | Level 2 >500 kW requires WECO submittal to PA PUC |
Sources
- Wellsboro Electric Customer Generators: https://wellsboroelectric.com/products-services/customer-generators/ (retrieved 2026-11-13)
Other utilities in Pennsylvania
- FirstEnergy Pennsylvania (Met-Ed, Penelec, Penn Power, West Penn Power)1,808,941
- PECO1,538,993
- PPL Electric Utilities1,311,251
- Duquesne Light553,124
- UGI Electric55,181
- Adams Electric Cooperative Inc.32,580
- Central Electric Cooperative, Inc.23,675
- REA Energy Cooperative Inc.20,951
- Tri-County Rural Electric Cooperative Inc. (PA)18,214
- Northwestern Rural E C A, Inc.18,200
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.