UGI Electric interconnection application

UGI Electric is an investor-owned utility serving 55,181 residential customers in Pennsylvania (EIA-861, 2025). Applications: PDF + email (Request forms from and email scanned application to dginterconnection@ugi.com (or mail: Attn: DG Interconnection - Electric - Empire A2, 511 East Northampton Street, Wilkes-Barre, PA 18711)). Gridpol files UGI Electric interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from UGI Electric’s official sources (see below). Submission channel (email/mail), form list and post-install steps confirmed from UGI page (archive capture 2026-05-14). Gaps: application forms are only available by email request, so required attachments (one-line, spec sheets) not confirmed; fee amounts from PA PUC policy statement, not UGI; Level 2 max (UGI 5 MW vs. code 2 MW) to confirm; NEM rider text and battery/storage rules not found.

UGI Electric at a glance

Utility

UGI Utilities, Inc (UGI Corporation)

Type

Investor-owned utility

EIA utility ID

19390

Residential customers

55,181 (EIA-861, 2025)

Net-metered residential customers

410 (EIA-861, 2025)

Service territory

2 counties in Pennsylvania

How to apply

PDF + email – Request forms from and email scanned application to dginterconnection@ugi.com (or mail: Attn: DG Interconnection - Electric - Empire A2, 511 East Northampton Street, Wilkes-Barre, PA 18711)

Who submits

Existing UGI electric customers, or an interconnection customer not yet a UGI customer with proof of site control in UGI territory (UGI page). Forms are not posted online; they must be requested by email before installation. Installer submission on customer's behalf not addressed on the page.

Export compensation

NEM – UGI Net Energy Metering Rider (Pennsylvania net metering, 52 Pa. Code ch. 75)
UGI refers to its 'General Metering Provisions' tariff page; rider text not read

Review time (official)

Per 52 Pa. Code 75.37 (Level 1): completeness notice within 10 business days of receipt; screening within 15 business days after that; witness test within 10 business days after receipt of certificate of completion (else deemed waived); customer signs interconnection agreement within 30 business days of receipt.

Documents UGI Electric asks for

  • Interconnection application formLevel 1: UGI Interconnection Application/Agreement - Part 1; Level 2/3/4: UGI Interconnection Application for Level 2, 3 or 4 Review (forms obtained from dginterconnection@ugi.com) Gridpol prepares this.
  • Interconnection agreement (when applicable)Level 2/3/4: UGI Level 2, 3 or 4 Interconnection Agreement; customer must sign standard small generator interconnection agreement within 30 business days of receipt (52 Pa. Code 75.37)
  • Net metering / net billing agreement (when applicable)Net Energy Metering Rider - Application for Service, if customer-generator qualifies for net metering
  • Other utility-specific document (when applicable)Proof of site control in UGI territory if applicant is not a current UGI customer
  • Final inspection sign-offApproval by local/municipal electric code official (52 Pa. Code 75.37(c)(4)(i))
  • Other utility-specific documentAfter installation, inspections and witness test: Level 1 - UGI Interconnection Application/Agreement Part 2 + Certificate of Completion; Level 2/3/4 - Certificate of Completion

How the UGI Electric process runs

  1. Request the applicable application (Level 1 or Level 2/3/4) from dginterconnection@ugi.com before installation
  2. Complete application (+ NEM Rider application if net metering) and email scanned copy to dginterconnection@ugi.com or mail to DG Interconnection, Wilkes-Barre; pay non-refundable application fee
  3. UGI assigns review level per screening criteria and reviews (PA timelines 52 Pa. Code 75.37)
  4. Install with lockable, visible-break isolation device accessible to UGI (or UGI lockbox)
  5. Municipal electrical inspection; UGI inspection and witness test (or waived)
  6. Submit Level 1 Application/Agreement Part 2 + Certificate of Completion (Level 2/3/4: Certificate of Completion); sign interconnection agreement; UGI approval to operate

Fees

FeeApplies toNote
$100Level 1 (certified inverter <=10 kW)52 Pa. Code 69.2104 (PUC policy statement); UGI page confirms a non-refundable application fee but does not state amounts
$250 + $1/kWLevel 2plus minor modification/additional review costs; engineering capped at $100/h (69.2104)
$350 + $2/kWLevel 3plus feasibility/system impact/facilities studies (69.2104)
$350 + $2/kWLevel 4 (75.40(d) review)Level 1-3 fees apply if processed under those levels (69.2104)

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 110 kWcertified inverter-based, no upgrades
Level 25000 kWcertified inverter-based, no upgrades (UGI table says 5 MW or less; 52 Pa. Code 75.34 states 2 MW for Level 2 - confirm)
Level 35000 kWnon-certified/not approved under Level 1-2; upgrades possible
Level 45000 kWno export capability
Net metering cap50 kW

PA small generator interconnection standards cover <=5 MW. PA net metering: residential <=50 kW (AEPS Act/52 Pa. Code ch. 75; not re-read today).

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.