New Enterprise R E C, Inc. interconnection application

New Enterprise R E C, Inc. is an electric cooperative serving 3,820 customers in Pennsylvania (EIA-861, 2025). Gridpol files New Enterprise R E C, Inc. interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Pennsylvania’s commission rule (52 Pa. Code 75.21-75.51 (Chapter 75 Subchapter C, Interconnection Standards); fee policy 52 Pa. Code 69.2104) does not bind electric cooperatives; New Enterprise R E C, Inc. sets its own interconnection policy. We confirm its form on the first project. Electric cooperatives and municipal utilities are not EDCs under the AEPS rules and set their own net metering/interconnection policies.

New Enterprise R E C, Inc. at a glance

Utility

New Enterprise R E C, Inc

Type

Electric cooperative

EIA utility ID

13205

Customers

3,820 (EIA-861, 2025, short form: all customer classes)

Net-metered residential customers

none reported

Service territory

3 counties in Pennsylvania

Documents New Enterprise R E C, Inc. asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for New Enterprise R E C, Inc.. We confirm New Enterprise R E C, Inc.’s exact list on the first project.

Pennsylvania interconnection rule

Commission

Pennsylvania Public Utility Commission

Interconnection rule

52 Pa. Code 75.21-75.51 (Chapter 75 Subchapter C, Interconnection Standards); fee policy 52 Pa. Code 69.2104 – Alternative Energy Portfolio Standards - Interconnection Standards · source

Applies to

Electric distribution companies (EDCs) regulated by the PUC, for customer-generators' small generator facilities <=5 MW not subject to RTO interconnection rules (75.31); not electric cooperatives or municipal utilities

Application form

EDC standard interconnection request forms and standard small generator interconnection agreement (examples posted on EDC websites, 75.33); Certificate of Completion

Timelines

Level 1: completeness 10 business days; screen verification 15 BD after; witness test within 10 BD of certificate of completion or deemed waived; approval conditional on local code approval, certificate of completion and signed standard agreement (75.37).

Fees

Policy statement 52 Pa. Code 69.2104: Level 1 $100; Level 2 $250 + $1/kW; Level 3 $350 + $2/kW plus studies; engineering not over $100/hour.

Insurance

Not addressed in the Chapter 75 sections reviewed.

External disconnect

Required: lockable, visible-break isolation device accessible by EDC, owned/maintained by facility owner; padlockable draw-out breaker acceptable; lockbox option for locked areas (75.36(9)-(10)).

Export compensation

NEM – 52 Pa. Code 75.11-75.17; 73 P.S. 1648.1 et seq. (AEPS Act)
Residential <=50 kW; nonresidential <=3 MW (<=5 MW under 75.16); >=500 kW needs PUC approval. Full retail kWh credit (generation, transmission, distribution), excess carried forward through the year; year-end excess compensated per 75.13 (price-to-compare).

Not bound by the rule

Electric cooperatives and municipal utilities are not EDCs under the AEPS rules and set their own net metering/interconnection policies.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited