Municipal utilityBorough of Middletown interconnection application
Borough of Middletown is a municipal utility serving 4,268 customers in Pennsylvania (EIA-861, 2025). Gridpol files Borough of Middletown interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Pennsylvania’s commission rule (52 Pa. Code 75.21-75.51 (Chapter 75 Subchapter C, Interconnection Standards); fee policy 52 Pa. Code 69.2104) does not bind municipal utilitys; Borough of Middletown sets its own interconnection policy. We confirm its form on the first project. Electric cooperatives and municipal utilities are not EDCs under the AEPS rules and set their own net metering/interconnection policies.
Borough of Middletown at a glance
Borough of Middletown
TypeMunicipal utility
EIA utility ID12474
Customers4,268 (EIA-861, 2025, short form: all customer classes)
Net-metered residential customersnone reported
Service territory1 county in Pennsylvania
Documents Borough of Middletown asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for Borough of Middletown. We confirm Borough of Middletown’s exact list on the first project.
Pennsylvania interconnection rule
Pennsylvania Public Utility Commission
Interconnection rule52 Pa. Code 75.21-75.51 (Chapter 75 Subchapter C, Interconnection Standards); fee policy 52 Pa. Code 69.2104 – Alternative Energy Portfolio Standards - Interconnection Standards · source
Applies toElectric distribution companies (EDCs) regulated by the PUC, for customer-generators' small generator facilities <=5 MW not subject to RTO interconnection rules (75.31); not electric cooperatives or municipal utilities
Application formEDC standard interconnection request forms and standard small generator interconnection agreement (examples posted on EDC websites, 75.33); Certificate of Completion
TimelinesLevel 1: completeness 10 business days; screen verification 15 BD after; witness test within 10 BD of certificate of completion or deemed waived; approval conditional on local code approval, certificate of completion and signed standard agreement (75.37).
FeesPolicy statement 52 Pa. Code 69.2104: Level 1 $100; Level 2 $250 + $1/kW; Level 3 $350 + $2/kW plus studies; engineering not over $100/hour.
InsuranceNot addressed in the Chapter 75 sections reviewed.
External disconnectRequired: lockable, visible-break isolation device accessible by EDC, owned/maintained by facility owner; padlockable draw-out breaker acceptable; lockbox option for locked areas (75.36(9)-(10)).
Export compensationNEM – 52 Pa. Code 75.11-75.17; 73 P.S. 1648.1 et seq. (AEPS Act)
Residential <=50 kW; nonresidential <=3 MW (<=5 MW under 75.16); >=500 kW needs PUC approval. Full retail kWh credit (generation, transmission, distribution), excess carried forward through the year; year-end excess compensated per 75.13 (price-to-compare).
Electric cooperatives and municipal utilities are not EDCs under the AEPS rules and set their own net metering/interconnection policies.
- 52 Pa. Code 75.31 Applicability: https://www.pacodeandbulletin.gov/Display/pacode?file=/secure/pacode/data/052/chapter75/s75.31.html&d= (retrieved 2026-11-13)
- 52 Pa. Code 75.34 Review procedures: https://www.pacodeandbulletin.gov/Display/pacode?file=/secure/pacode/data/052/chapter75/s75.34.html&d= (retrieved 2026-11-13)
- 52 Pa. Code 75.36 Additional general requirements: https://www.pacodeandbulletin.gov/Display/pacode?file=/secure/pacode/data/052/chapter75/s75.36.html&d= (retrieved 2026-11-13)
- 52 Pa. Code 75.37 Level 1 review: https://www.pacodeandbulletin.gov/Display/pacode?file=/secure/pacode/data/052/chapter75/s75.37.html&d= (retrieved 2026-11-13)
- 52 Pa. Code 69.2104 Interconnection application fees: https://www.pacodeandbulletin.gov/Display/pacode?file=/secure/pacode/data/052/chapter69/s69.2104.html&d= (retrieved 2026-11-13)
- 52 Pa. Code 75.13 Net metering general provisions: https://www.pacodeandbulletin.gov/Display/pacode?file=/secure/pacode/data/052/chapter75/s75.13.html&d= (retrieved 2026-11-13)
Other utilities in Pennsylvania
- FirstEnergy Pennsylvania (Met-Ed, Penelec, Penn Power, West Penn Power)1,808,941
- PECO1,538,993
- PPL Electric Utilities1,311,251
- Duquesne Light553,124
- UGI Electric55,181
- Adams Electric Cooperative Inc.32,580
- Central Electric Cooperative, Inc.23,675
- REA Energy Cooperative Inc.20,951
- Tri-County Rural Electric Cooperative Inc. (PA)18,214
- Northwestern Rural E C A, Inc.18,200
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.