Home › Utilities › Oklahoma › Red River Valley Rrl Electric Association
Electric cooperativeRed River Valley Rrl Electric Association interconnection application
Red River Valley Rrl Electric Association is an electric cooperative serving 16,152 residential customers in Oklahoma (EIA-861, 2025). Gridpol files Red River Valley Rrl Electric Association interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Oklahoma’s interconnection rule (OAC 165:40 (Standard Terms of Purchases from Producers of 300 kW or Less), esp. Subch. 5 Installation and Parallel Operation (165:40-5-1 to 5-32); OAC 165:35-29-2 (Parallel operation of generation facilities)) applies to Red River Valley Rrl Electric Association. Levels, timelines and documents below come from that rule; Red River Valley Rrl Electric Association’s own form and portal are confirmed on the first project.
Red River Valley Rrl Electric Association at a glance
Red River Valley Rrl Elec Assn
TypeElectric cooperative
EIA utility ID15746
Residential customers16,152 (EIA-861, 2025)
Net-metered residential customersnone reported
Service territory5 counties in Oklahoma
Wholesale supplier / associationWestern Farmers Electric Cooperative
Documents Red River Valley Rrl Electric Association asks for
- Interconnection application formRequired by the state rule Gridpol prepares this.
- PV module spec sheetRequired by the state rule
- Inverter spec sheetRequired by the state rule
- Interconnection agreementRequired by the state rule
- Other utility-specific documentRequired by the state rule
Documents required by the Oklahoma rule. Red River Valley Rrl Electric Association may ask for more on its own form; we confirm on the first project.
Oklahoma interconnection rule
Rule text read via Cornell LII; official rules.ok.gov not checked. No Level-based interconnection standard, timelines or insurance figures found (Part 7 liability sections 165:40-3-30/31 not read). Statutory DG provisions (17 O.S. §156) not checked (search budget exhausted).
Oklahoma Corporation Commission (OCC)
Interconnection ruleOAC 165:40 (Standard Terms of Purchases from Producers of 300 kW or Less), esp. Subch. 5 Installation and Parallel Operation (165:40-5-1 to 5-32); OAC 165:35-29-2 (Parallel operation of generation facilities) – Standard Terms of Purchases from Purchasers of 300 kW or Less / Parallel operation · source
Applies toOCC-regulated 'cooperative/utility' = electric distribution cooperatives and investor-owned utilities (OG&E, PSO, Empire/Liberty) for PURPA producers <=300 kW (OAC 165:40-1-2). 165:35-29-2: parallel operation requires utility's prior written approval; agreements submitted to OCC. Municipal utilities not covered.
Application formNo statewide application form or level structure; utility/coop application with equipment specifications (165:40-5-8) and Commission-approved purchase agreement (165:40-9-2).
FeesInterconnecting party pays costs beyond normal service terms (165:35-29-2(c)); no fee caps in rule.
External disconnectProducer must install, own and maintain a disconnecting device at a location accessible to cooperative/utility personnel at all times (OAC 165:40-5-11).
Export compensationNEM – OAC 165:40-9 (Optional Net Energy Billing Purchase Rate)
Optional net energy billing for producers <=300 kW: meter runs in reverse within monthly period; monthly net excess credited/paid next period at utility's avoided energy cost (no stated expiry); systems >125% of peak load may be excluded and paid under QF tariff.
OCC-regulated electric cooperatives are bound by OAC 165:40 like IOUs. Municipal utilities are outside OCC jurisdiction and set their own interconnection and net metering policies.
- OAC 165:40 (LII): https://www.law.cornell.edu/regulations/oklahoma/title-165/chapter-40 (retrieved 2026-11-13)
- OAC 165:40-9-2: https://www.law.cornell.edu/regulations/oklahoma/OAC-165-40-9-2 (retrieved 2026-11-13)
- OAC 165:40-9-3: https://www.law.cornell.edu/regulations/oklahoma/OAC-165-40-9-3 (retrieved 2026-11-13)
- OAC 165:40-5-11: https://www.law.cornell.edu/regulations/oklahoma/OAC-165-40-5-11 (retrieved 2026-11-13)
- OAC 165:35-29-2: https://www.law.cornell.edu/regulations/oklahoma/OAC-165-35-29-2 (retrieved 2026-11-13)
Other utilities in Oklahoma
- OG&E716,295
- PSO506,245
- Oklahoma Electric Cooperative Inc.59,539
- City of Edmond39,944
- Northeast Oklahoma Electric Company38,163
- Verdigris Valley Electric Cooperative Inc.35,514
- East Central Oklahoma Electric Cooperative Inc.33,788
- Lake Region Electric Cooperative, Inc.25,042
- Canadian Valley Electric Cooperative, Inc.24,981
- CKenergy Electric Cooperative22,775
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.