PSO interconnection application

PSO is an investor-owned utility serving 506,245 residential customers in Oklahoma (EIA-861, 2025). Applications: PowerClerk (AEP PowerClerk). Gridpol files PSO interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from PSO’s official sources (see below). Fee amounts and installer LOA not published.

PSO at a glance

Utility

Public Service Co of Oklahoma (American Electric Power)

Type

Investor-owned utility

EIA utility ID

15474

Residential customers

506,245 (EIA-861, 2025)

Net-metered residential customers

4,653 (EIA-861, 2025)

Service territory

46 counties in Oklahoma

How to apply

PowerClerk – AEP PowerClerk · official link

Who submits

Customer starts application in PowerClerk (account registration); page does not name installer submission explicitly. Questions: dgcoordinator_PSO@aep.com.

Export compensation

Net billing – Net Energy Billing Option (NEBO), OCC Order 708079
TOD rate; hourly/interval netting; excess credited in dollars at SPP DA LMP-based avoided energy cost; separate production meter

Review time (official)

Interconnection Agreement approval within 60 days if requirements met; 'a little more than 60 days' typical for homeowners (Customer Information Packet).

Documents PSO asks for

  • Interconnection application formOnline application in PowerClerk, signed, with fees Gridpol prepares this.
  • UL 1741 / IEEE 1547 certificationInverter manufacturer proof of UL 1741 testing (expedited review <=25 kW); IEEE 1547-2018 equipment from 1/1/2024
  • Interconnection agreementInterconnection Service Agreement / Interconnection Agreement + Standard Electricity Purchase Agreement (NEBO)
  • Final inspection sign-offProof of local inspections and testing before energizing
  • Other utility-specific documentVisible-break lockable AC disconnect within 10 ft of main meter, 48-66 in above ground; additional meter socket for AMI generation meter

How the PSO process runs

  1. Submit application in aep.powerclerk.com, pay fees, sign
  2. PSO technical review / analysis; agree mitigations
  3. PSO issues Interconnection Service Agreement (+ cost estimate if needed); sign ISA + purchase agreement
  4. Install with AC disconnect and generation meter socket; local permits/inspections
  5. Schedule post-installation inspection; PSO installs AMI generation meter
  6. PSO issues Permission to Operate letter

Fees

FeeApplies toNote
All'Pay any fees' in PowerClerk; amounts not published on page; customer pays system upgrades

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Expedited (automated) review25 kWUL 1741 inverter-based
Expanded review1000 kW>1 MW may need additional study
Net metering cap300 kW

NEBO: <=300 kW and <=125% of annual peak demand; screened on nameplate kW

Storage, EV and stamps

Battery storage

Energy storage systems go through the same DER interconnection process (Complete Guide covers DG or Energy Storage Systems).

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited