Home › Utilities › Oklahoma

Oklahoma

Oklahoma interconnection applications

95 electric utilities serve Oklahoma (EIA-861, 2025): 3 investor-owned utilitys, 30 electric cooperatives, 61 municipal utilitys, 1 state power authority. Together they serve 1,794,551 residential customers; 18,196 residential customers were on net metering at year-end 2025.

Largest utilities in Oklahoma

OG&EProcess verified

Investor-owned utility · 774,864 residential customers · Oklahoma

Applications: PowerClerk – OG&E PowerClerk

Interconnection process and documents →
PSOProcess verified

Investor-owned utility · 506,245 residential customers · Oklahoma

Applications: PowerClerk – AEP PowerClerk

Interconnection process and documents →
Oklahoma Electric Cooperative Inc.State rule applies

Electric cooperative · 59,539 residential customers · Oklahoma

Interconnection process and documents →
City of EdmondState guidance

Municipal utility · 39,944 residential customers · Oklahoma

Interconnection process and documents →
Northeast Oklahoma Electric CompanyState rule applies

Electric cooperative · 38,163 residential customers · Oklahoma

Interconnection process and documents →
Verdigris Valley Electric Cooperative Inc.State rule applies

Electric cooperative · 35,514 residential customers · Oklahoma

Interconnection process and documents →
East Central Oklahoma Electric Cooperative Inc.State rule applies

Electric cooperative · 33,788 residential customers · Oklahoma

Interconnection process and documents →
Lake Region Electric Cooperative, Inc.State rule applies

Electric cooperative · 25,042 residential customers · Oklahoma

Interconnection process and documents →
Canadian Valley Electric Cooperative, Inc.State rule applies

Electric cooperative · 24,981 residential customers · Oklahoma

Interconnection process and documents →
CKenergy Electric CooperativeState rule applies

Electric cooperative · 22,775 residential customers · Oklahoma

Interconnection process and documents →
Choctaw Electric Cooperative Inc.State rule applies

Electric cooperative · 21,697 residential customers · Oklahoma

Interconnection process and documents →
Kiamichi Electric Cooperative, Inc.State rule applies

Electric cooperative · 20,997 residential customers · Oklahoma

Interconnection process and documents →

Export compensation among the researched Oklahoma utilities: Net billing, NEM. Rules differ by utility – see each utility page.

Oklahoma interconnection rule

Rule text read via Cornell LII; official rules.ok.gov not checked. No Level-based interconnection standard, timelines or insurance figures found (Part 7 liability sections 165:40-3-30/31 not read). Statutory DG provisions (17 O.S. §156) not checked (search budget exhausted).

Commission

Oklahoma Corporation Commission (OCC)

Interconnection rule

OAC 165:40 (Standard Terms of Purchases from Producers of 300 kW or Less), esp. Subch. 5 Installation and Parallel Operation (165:40-5-1 to 5-32); OAC 165:35-29-2 (Parallel operation of generation facilities) – Standard Terms of Purchases from Purchasers of 300 kW or Less / Parallel operation · source

Applies to

OCC-regulated 'cooperative/utility' = electric distribution cooperatives and investor-owned utilities (OG&E, PSO, Empire/Liberty) for PURPA producers <=300 kW (OAC 165:40-1-2). 165:35-29-2: parallel operation requires utility's prior written approval; agreements submitted to OCC. Municipal utilities not covered.

Application form

No statewide application form or level structure; utility/coop application with equipment specifications (165:40-5-8) and Commission-approved purchase agreement (165:40-9-2).

Fees

Interconnecting party pays costs beyond normal service terms (165:35-29-2(c)); no fee caps in rule.

External disconnect

Producer must install, own and maintain a disconnecting device at a location accessible to cooperative/utility personnel at all times (OAC 165:40-5-11).

Export compensation

NEM – OAC 165:40-9 (Optional Net Energy Billing Purchase Rate)
Optional net energy billing for producers <=300 kW: meter runs in reverse within monthly period; monthly net excess credited/paid next period at utility's avoided energy cost (no stated expiry); systems >125% of peak load may be excluded and paid under QF tariff.

Not bound by the rule

OCC-regulated electric cooperatives are bound by OAC 165:40 like IOUs. Municipal utilities are outside OCC jurisdiction and set their own interconnection and net metering policies.

LevelUp toCriteria / review / fee
Producer <=300 kW (single process)300 kWEquipment compatible with line segment; signed purchase agreement

All 95 utilities in Oklahoma

Residential customers in Oklahoma per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited