Investor-owned utilityOG&E interconnection application
OG&E is an investor-owned utility serving 774,864 residential customers in Arkansas, Oklahoma (EIA-861, 2025). Applications: PowerClerk (OG&E PowerClerk). Gridpol files OG&E interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from OG&E’s official sources (see below). Fees and battery rules not published on FAQ; check PowerClerk program for document list and LOA.
OG&E at a glance
Oklahoma Gas & Electric Co (OGE Energy Corp.)
TypeInvestor-owned utility
EIA utility ID14063
Residential customers774,864 (EIA-861, 2025)
Net-metered residential customers10,543 (EIA-861, 2025)
Service territory7 counties in Arkansas, 58 counties in Oklahoma
How to applyPowerClerk – OG&E PowerClerk · official link
Who submitsCustomer is addressed as applicant; page does not state installer submission rules. Paper forms also accepted via renewableenergy@oge.com, fax or mail.
Export compensationNet billing – Net Energy Billing Option (NEBO)
Excess credited/paid in dollars next billing period at on/off-peak Avoided Energy Cost
Net metering application review 30 business days after complete application; meter reprogramming up to 7 business days after approval.
Documents OG&E asks for
- Interconnection application formInterconnection Application required for every inverter-based system incl. micro-inverters Gridpol prepares this.
- Inverter spec sheetTechnical Specification Sheet of inverter
- Final inspection sign-offMunicipal inspection; if no AHJ, inspection by licensed electrician or licensed PE
- Other utility-specific documentVisible, lockable outdoor disconnect within 10 ft of production meter (OK) or NET meter (AR); OK customers need additional meter base for production meter
How the OG&E process runs
- Submit application (PowerClerk preferred) for preliminary approval before installing
- Install with visible lockable disconnect and meter base
- Pass municipal inspection (or licensed electrician/PE inspection)
- OG&E approves Interconnection Application and issues Permission to Operate
- Meter reprogrammed (bi-directional) within up to 7 business days
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Net metering cap | 300 kW |
NEBO: <=300 kW AC and <=125% of peak load; larger default to QF tariff
Storage, EV and stamps
Battery storage
Not addressed on OG&E FAQ page.
PE stamp
Licensed PE (or licensed electrician) inspection only where no local AHJ exists. – PE-stamped drawings are not included in Gridpol.
Common issues the utility lists
- Required information incomplete or missing
- Inspection delayed
- Facility size requires engineering approval
Gridpol’s pre-submission check covers these before we file.
Sources
- OG&E Renewables FAQs: https://oge.com/wps/portal/ord/energy-solutions/renewables/faqs (retrieved 2026-11-13)
Other utilities in Oklahoma
- PSO506,245
- Oklahoma Electric Cooperative Inc.59,539
- City of Edmond39,944
- Northeast Oklahoma Electric Company38,163
- Verdigris Valley Electric Cooperative Inc.35,514
- East Central Oklahoma Electric Cooperative Inc.33,788
- Lake Region Electric Cooperative, Inc.25,042
- Canadian Valley Electric Cooperative, Inc.24,981
- CKenergy Electric Cooperative22,775
- Choctaw Electric Cooperative Inc.21,697
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.